HousePrecheckCheck an address

16 Ryerson AveToronto · zoning, lot size and permit records

Residential · R (d1.0) (x853)18.3 × 30.6 m557 m²on Wolseley Stcorner, also on Ryerson Avebacks onto Linda Griffiths Lane

Not a home

Theatre Passe Muraille

The City of Toronto's real estate inventory lists Theatre Passe Muraille here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A public buildingVisitors and traffic in its open hours; usually quiet at night.
  • Permits or applications open on this parcelStill open in the City's records: 24 201521 (Proposed complete accessibility upgrades, 2024, status Permit Issued); 19 210026 (Proposal for partial roof replacement, exterior stone restoration, exterior wood trim,..., 2019, status Inspection); 15 147617 (Theatre Passe Muraille- Installation of 1 Backflow Preventor, 2015, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 29 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: King-BathurstThe City plans more homes around the station: good for transit, and more building over time.
N10 m
18.3 m frontage30.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 3 building permits open, the oldest since 2015

    Needs a closer look

    Still open in the City's records: 24 201521 (Proposed complete accessibility upgrades, 2024, status Permit Issued); 19 210026 (Proposal for partial roof replacement, exterior stone restoration, exterior wood trim,..., 2019, status Inspection); 15 147617 (Theatre Passe Muraille- Installation of 1 Backflow Preventor, 2015, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit24 201521Permit Issued

    Proposed complete accessibility upgrades.

    Oct 21, 2024 · 16 RYERSON AVE
  • Building permit22 109290Closed

    Propsed Interior Alterations to demolition of the existing washrooms, construction of new unisex washrooms and UTR lobby modifications.

    May 20, 2022 · 16 RYERSON AVE
  • Building permit19 210026Inspection

    Proposal for partial roof replacement, exterior stone restoration, exterior wood trim, window repair, new roof access hatch and fixed ladders in existing performance theatre "Theatre Passe Muraille"

    Sep 6, 2019 · 16 RYERSON AVE
  • Building permit19 134637Closed

    Proposal for interior alterations to existing theatre "Theatre Passe Muraille"

    May 7, 2019 · 16 RYERSON AVE
  • Building permit15 147617Permit Issued

    Theatre Passe Muraille- Installation of 1 Backflow Preventor

    May 28, 2015 · 16 RYERSON AVE
  • Building permit12 244998Closed

    This is for the construction of a 20' x 16' stage for the Queen Street West Festival. This will be erected on Saturday September 15, 2012 and dismantled on the same day.

    Sep 14, 2012 · 16 RYERSON AVE
  • Building permit03 163371Closed

    Make interior alterations to the corridor portion of the Theatre on ground floor.

    Sep 29, 2003 · 16 RYERSON AVE

Check before you build

  • Site-specific exception 900.2.10(853)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(853)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4)

  2. Older by-law A

    Section 12(2) 208 of former City of Toronto By-law 438-86

5 parts for other addresses
  • B On 25 Augusta Ave.: (i) a religious residence may be combined with other permitted uses on the lot ; (ii) a rooming house with no more than 16 rooms providing …
  • B On 91 Augusta Ave., former City of Toronto by-law 60-67
  • C On 165 Grange Ave., former City of Toronto by-law 164-71
  • D On 77 Ryerson Ave., former City of Toronto by-law 163-71
  • E On 20 Vanauley St., former City of Toronto by-law 680-83.
By-law 569-2013, Chapter 900

Lot facts

Area
557 m²
Frontage
18.3 m
Depth
30.6 m
Street
Wolseley St
Corner lot
Yes, also on Ryerson Ave30.6 m along it
Public lane
Linda Griffiths Lane, 25 m along it
House footprint
557 m²roof up to 15.9 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: King-Bathurst. The lot is inside the King-Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 761). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x853) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: elm (6 cm), elm (6 cm), oak, red (5 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%23 of 24 decisions
Garden suite permits
1
Laneway suite permits
3
Multiplex permits
8
Development applications
28

Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

    42 CARR ST · Nov 4, 2026 · 114 m away
  • Minor varianceRefused

    To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south) ground floor entrance with stairs, front, rear and side (south) second storey and third storey balconies, and roof access (for mechanical equipment).Also, to construct a new rear two-storey detached ancillary building (laneway suite) containing three dwelling units, a basement, and roof access (for mechanical equipment). There will be waste storage located in the basement and two-short-term bicycle parking spaces in the front yard. Also, there will be a total of twelve residential dwelling units on this lot (nine units within the main dwelling and three units in the ancillary building).

    74 MARKHAM ST · Oct 14, 2026 · 325 m away
  • Minor varianceApproved

    To construct a new rear two-storey detached ancillary building (containing two laneway suites, each occupying the basement, first, and second levels) with a side (west) cantilever second storey. There will be a total of three residential dwelling units on this lot (one unit occupying the main dwelling, and two units occupying the ancillary building).

    129 PALMERSTON AVE · Sep 9, 2026 · 475 m away
  • Minor varianceApproved

    To alter the existing two-storey townhouse dwelling by constructing a new partial rear two-storey addition (to replace the existing partial rear two-storey addition) and a rear stone patio. The existing rear one-storey detached ancillary building (garage) will be demolished.

    157 WOLSELEY ST · Jul 15, 2026 · 342 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a front basement walkout, a front covered porch with stairs, front second and third storey bay windows, a rear ground floor deck with stairs, and a rear third storey rooftop patio. Also, to construct a new one-storey detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot.

    104 MARKHAM ST · Apr 15, 2026 · 392 m away

Latest activity nearby

  • Zoning review

    Closed

    474 QUEEN ST W · Nov 9, 2026 · 197 m away
  • Building permit

    1 Wall Sign*****Mark Health Network*****

    575 QUEEN ST W · Nov 5, 2026 · 168 m away
  • Minor varianceApproved

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

    42 CARR ST · Nov 4, 2026 · 114 m away
  • Building permit

    INTERIOR ALTERATIONS TO EXISTING GROUND FLOOR & MEZZANINE LEVEL GROUP A-2 EATING ESTABLISHMENT ('DEAR GRAIN')

    511 RICHMOND ST W · Nov 4, 2026 · 279 m away
  • Building permit

    Proposal for interior alteration of existing office for new model suite.

    555 RICHMOND ST W · Nov 3, 2026 · 237 m away
  • Building permit

    INTERIOR ALTERATION OF EXISTING OFFICE FOR NEW MODEL SUITE.

    555 RICHMOND ST W · Nov 2, 2026 · 237 m away
  • Zoning review

    Closed

    588 RICHMOND ST W · Oct 29, 2026 · 181 m away
  • Building permit

    Interior Alterations involving chanage of use from retail to fitness studio, installing male/female change rooms, a universal WC, one new studio room, minor HVAC/Electrical work.

    610 QUEEN ST W · Oct 23, 2026 · 241 m away
  • Building permit

    REV01: Revising the roof parapet and guard.Proposal for fire damage repairs on roof wooden deck on top of the steel frame roof - Roof parapet to be repaired to match pre-loss conditions. Interior Finishes (Second and Third Floors):Localized removal and replacement of smoke/water-damaged finishes. All finishes - Second-floor ceiling below the wooden deck to be rebuilt - Remove and replace the fire-damaged exterior door within the residential unit (leading to the roof deck), matching pre-loss design and function.

    14 MARKHAM ST · Oct 23, 2026 · 268 m away
  • Building permit

    Repair of the existing detached wood-frame garage at the rear of the lot (32 Augusta Avenue), replacing deteriorated wall studs, plates, roof joists, roof deck, roofing, cladding and lane doors in kind. No addition, no demolition, no change of use, no change to the footprint or height.

    32 AUGUSTA AVE · Oct 19, 2026 · 196 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
Osgoode Station21 min walk
Nearest TTC stop
Bathurst St at Carr St2 min walk
Nearest cycling route
Denison AveBike Lane - Contraflow, 2 min walk
Nearest traffic count
8,228 vehicles in 8 hQueen St W / Ryerson Ave, 120 m away, May 8, 2013
Serious collisions within 500 m
92021–2026, killed or seriously injured: 0 fatal, 4 with pedestrians, 1 with cyclists
Parks
Alexandra Park3 min walk
Randy Padmore Park3 min walk
ALEX WILSON COMMUNITY GARDEN - Open Green Space3 min walk

Schools within 1 km

  • RYERSON COMMUNITY SCHOOL & DOWNTOWN VOCAL MUSIC ACADEMY English Public 5 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 8 min walk
  • CHARLES G FRASER JR PUBLIC SCHOOL English Public 9 min walk
  • OGDEN JR PUBLIC SCHOOL English Public 10 min walk
  • NIAGARA STREET JR PUBLIC SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.