HousePrecheckCheck an address

15A Jeavons AveToronto · zoning, lot size and permit records

Employment · E 1.030.5 × 64.0 m1,949 m²on Jeavons Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
30.5 m frontage64.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    1,949 m²
    Frontage
    30.5 m
    Depth
    64 m
    Street
    Jeavons Ave
    Corner lot
    No
    Public lane
    None
    House footprint
    15 m²roof up to 12.1 m
    Back yard
    13.3 mhouse to rear lot line
    Side yards
    2.1 m and 26.3 mhouse to side lot lines
    Buildings on the lot
    2house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

    Around this lot

    Minor variances approved
    100%13 of 13 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    6
    Development applications
    0

    Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit the redevelopment of the lands for a proposed six (6)-storey self-storage building. This Minor Variance application is associated with an existing Site Plan Control Application (19 213795 ESC 20 SA) for this proposal which was submitted on August 29, 2019 and is currently under review by the City.

      345 DANFORTH RD · Sep 23, 2020 · 448 m away
    • Minor varianceApproved

      The applicant is seeking relief from the provisions of the Zoning By-law to demolish a minor portion of the existing building and construct interior alterations to accommodate a portion of the building for a self-storage facility. The remainder of the building would continue to be used as a warehouse.

      376 BIRCHMOUNT RD · Oct 17, 2019 · 377 m away
    • Minor varianceApproved

      To permit the industrial building to be converted to a self-storage warehouse.

      380 BIRCHMOUNT RD · Jan 30, 2019 · 262 m away
    • Minor varianceApproved

      This application is for a variance to permit a banquet hall and catering facility in addition to the uses permitted by the zoning by-law.

      380 BIRCHMOUNT RD · Jun 22, 2017 · 262 m away

    Latest activity nearby

    • Building permitmultiplex

      REV01: Revision to relfect condition o fexisting exterior walls, foundation wall type and structural changes.Proposed addition and interior alteration to convert the existing single family dwelling to a four unit detached dwelling.

      2 HADDON AVE · Nov 25, 2026 · 278 m away
    • Building permit

      Proposed replacement of one (1) 3/4" Reduced Pressure Backflow Preventer in the Meter Room in the Basement.

      446 BIRCHMOUNT RD · Nov 23, 2026 · 194 m away
    • Building permit

      Proposed multiple projects including interior alterations, new roof and one-storey ground-floor addition.

      50 RALEIGH AVE · Nov 5, 2026 · 38 m away
    • Zoning review

      Closed

      3 PARNELL AVE · Oct 6, 2026 · 172 m away
    • Building permitdemolition

      The existing 1-storey detached dwelling, garage and sheds will be demolished

      31 NORTH EDGELY AVE · Sep 22, 2026 · 272 m away
    • Building permitmultiplex, new building, new house

      PART 2 - Proposal to construct a new three-storey fourplex dwelling See also 24 240047 MV

      31 NORTH EDGELY AVE · Sep 22, 2026 · 272 m away
    • Building permitmultiplex, new building, new house

      PART 1 - Proposal to construct a new three-storey fourplex dwelling See also 24 240046 MV

      31 NORTH EDGELY AVE · Sep 22, 2026 · 272 m away
    • Building permit

      1 wall sign**BLUEBIRD STORAGE**

      380 BIRCHMOUNT RD · Sep 16, 2026 · 262 m away
    • Building permit

      Installation of back water valve and sump pump

      15 RUPERT ST · Sep 9, 2026 · 283 m away
    • Building permit

      Canopy installation over proposed deck & fornt porch enclosure

      130 AYLESWORTH AVE · Sep 8, 2026 · 240 m away

    Neighbourhood: Clairlea-Birchmount

    About the area around the lot, not the lot itself.

    Nearest station
    Warden Station23 min walk
    Nearest TTC stop
    Birchmount Rd at Raleigh Ave3 min walk
    Nearest cycling route
    Kingston RdMulti-Use Trail, 16 min walk
    Nearest traffic count
    6,282 vehicles in 8 hBirchmount Rd / Parnell Ave, 240 m away, Mar 21, 2018
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
    Parks
    Woodrow Park4 min walk
    Highview Park7 min walk
    Sadler Parkette9 min walk

    Schools within 1 km

    • J G WORKMAN PUBLIC SCHOOL English Public 6 min walk
    • BIRCH CLIFF HEIGHTS PUBLIC SCHOOL English Public 8 min walk
    • DANFORTH GARDENS PUBLIC SCHOOL English Public 11 min walk
    • BIRCHMOUNT PARK COLLEGIATE INSTITUTE English Public 14 min walk
    • IMMACULATE HEART OF MARY CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureClairlea-BirchmountMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home64%54%
    Population (2021)26,84016,813
    Homes built in 1960 or before39%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleClairlea-BirchmountCity median
    Assault1303.8636.3
    Robbery4969.5
    Shootings9.810.5
    Auto theft287.6192.6
    Theft over $5,0008546.1
    Break and enter189.5172.8
    Theft from vehicles290.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.