HousePrecheckCheck an address

1594 Bathurst StToronto · zoning, lot size and permit records

Residential multiple · RM (d2.5) (x167)19.9 × 40.9 m813 m²on Bathurst Stcorner, also on Lonsmount Dr

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 22 rental units, built 1948More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 6 development applications open within 300 m, up to 26 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 25 243132 PRS 00 IV (Order Issued Property Standards: The required guard has members, attachments or opening..., 2025, status Order Issued); 25 243130 PRS 00 IR (Property Standards, 2025, status Order Issued).
  • City upkeep score: 81 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: St Clair WestThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
19.9 m frontage40.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 25 243132 PRS 00 IV (Order Issued Property Standards: The required guard has members, attachments or opening..., 2025, status Order Issued); 25 243130 PRS 00 IR (Property Standards, 2025, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 81 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 22 units, built 1948).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation25 243132 PRS 00 IVOrder Issued

    Order Issued Property Standards: The required guard has members, attachments or openings that will facilitate climbing.; The stair guard when measured vertically from the stair nosing is less than 900 millimetres high.

    Oct 21, 2025 · 1594 BATHURST ST
  • By-law investigation25 243130 PRS 00 IROrder Issued

    Property Standards

    Oct 21, 2025 · 1594 BATHURST ST
  • Building permit18 269649Closed

    Revision 01: Relocate the vertical swing door in the overhead garage doorProposal to upgrade existing basement to include new doors and fire alarm devices

    Jun 19, 2019 · 1594 BATHURST ST
  • Building permit18 261938Closed

    Water Damage repairs -Ceiling finishes were removed from parts of units #3, #10 & #18, as well as part of the common corridor - repair gypsum boards and floor and ceiling joists

    Dec 3, 2018 · 1594 BATHURST ST

Check before you build

  • Site-specific exception 900.6.10(167)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(167)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum height of any building is 16 metres with no more than 5 storeys .

By-law 569-2013, Chapter 900

Lot facts

Area
813 m²
Frontage
19.9 m
Depth
40.9 m
Street
Bathurst St
Corner lot
Yes, also on Lonsmount Dr40.9 m along it
Public lane
None
House footprint
464 m²roof up to 19.8 m
Back yard
2.5 mhouse to rear lot line
Side yards
2.5 m and 2.7 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: St Clair West. The lot is inside the St Clair West Major Transit Station Area approved by the Province (Site and Area Specific Policy 717). Source
  • Zone RM (d2.5) (x167) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
94%30 of 32 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
4
Development applications
9

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 32 variance decisions: more than at 65% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a rear second storey juliet balcony, a rear basement extension at the northwest corner of the dwelling, and a new rear ground floor deck and stairs.

    140 KENWOOD AVE · Aug 19, 2026 · 297 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a front ground floor addition (front porch enclosure) with a new front porch with stairs, a rear ground floor addition, a rear second storey addition (cantilevered at the north side), and a rear ground floor deck with stairs.

    278 WYCHWOOD AVE · Aug 5, 2026 · 397 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above the existing rear one-storey addition), a canopy over the existing front porch, a rear basement walkout and a rear ground floor deck with stairs. The existing front second storey balcony will be removed. There will be a total of two residential dwelling units on this lot (one unit within the basement and one unit on the first and second storeys).

    211 WYCHWOOD AVE · Jul 15, 2026 · 449 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling with a front integral garage, a partially covered front porch with stairs, a canopy located at the northwest corner of the dwelling, a covered front third storey balcony, and a partially covered rear ground floor deck with stairs.

    93 PINEWOOD AVE · Jul 15, 2026 · 493 m away
  • Minor varianceApproved

    To construct a new three-storey detached building (houseplex), with a front covered porch, a side (south) ground floor canopy, third storey front, side (south) and rear balconies (on the roof of the second storey) serving Units A, B and C respectively, a front and side (south) rooftop deck (shared by both Unit A and B, on the roof of the third storey), a rear rooftop deck (for Unit C, on the roof of the third storey), and three rooftop staircase access enclosures. Also, to construct a rear two-storey detached ancillary building (containing one laneway suite), abutting the laneway, with an at-grade patio along the west portion of the building. There will be a total of four residential dwelling units on this lot (three dwelling units within the main building, and one dwelling unit within the ancillary building).

    205 WYCHWOOD AVE · Jun 10, 2026 · 464 m away

Latest activity nearby

  • Building permit

    Proposed installation of rooftop safety gaurd rail.

    4 GLENAYR RD · Nov 16, 2026 · 269 m away
  • Building permitdemolition, multiplex

    PROPOSED DEMOLITION OF AN EXISTING HOUSE AND CONSTRUCTION OF A NEW DUPLEX DWELLING WITH AN ATTACHED GARAGE.

    617 LONSDALE RD · Nov 4, 2026 · 159 m away
  • Building permitmultiplex, new building, new house, secondary suite

    PROPOSED DEMOLITION OF AN EXITING HOUSE AND CONSTRUCTION OF A NEW DUPLEX DWELLING WITH AN ATTACHED GARAGE.

    617 LONSDALE RD · Nov 4, 2026 · 159 m away
  • Zoning review

    Closed

    226 VAUGHAN RD · Nov 2, 2026 · 300 m away
  • Building permit

    Geothermal energy well drilling for the 30 storey rental building to be constructed on the lands of 91-101 Raglan Ave

    91 RAGLAN AVE · Oct 27, 2026 · 227 m away
  • Zoning review

    Notice Sent

    229 LONSMOUNT DR · Oct 16, 2026 · 161 m away
  • Building permit

    Proposal for replacement of pit hatches and ladder in train way pump room 3S128 at TTC's Glenayr Emergency Exit Building (ESB).

    4 GLENAYR RD · Oct 15, 2026 · 269 m away
  • Building permitnew building

    Proposal for 30 storey residential development with 4 levels of below grade parking. Total of 290 residential dwelling units with small retail frontage along Raglan AveReference: 21 213475 STE 12 SA

    91 RAGLAN AVE · Oct 14, 2026 · 227 m away
  • Zoning review

    Closed

    1601 BATHURST ST · Sep 14, 2026 · 152 m away
  • Zoning review

    Closed

    182 MONTCLAIR AVE · Aug 27, 2026 · 204 m away

Neighbourhood: Humewood-Cedarvale

About the area around the lot, not the lot itself.

Nearest station
St Clair West Station8 min walk
Nearest TTC stop
Bathurst St at Lonsdale Rd2 min walk
Nearest cycling route
Claxton BlvdSigned Route (No Pavement Markings), 1 min walk
Nearest traffic count
17,711 vehicles in 8 hBathurst St / Lonsmount Dr, 40 m away, Nov 22, 2010
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Cedarvale Ravine3 min walk
Cedarvale Park3 min walk
Tichester Park5 min walk

Schools within 1 km

  • ST MICHAEL'S COLLEGE SCHOOL Private 6 min walk
  • HUMEWOOD COMMUNITY SCHOOL English Public 10 min walk
  • HOLY ROSARY CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • FOREST HILL TUTORING Private 11 min walk
  • ROBBINS HEBREW ACADEMY Private 15 min walk
  • BISHOP STRACHAN SCHOOL Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumewood-CedarvaleMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home37%54%
Population (2021)13,84516,813
Homes built in 1960 or before60%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumewood-CedarvaleCity median
Assault471.6636.3
Robbery42.369.5
Shootings12.110.5
Auto theft133192.6
Theft over $5,00018.146.1
Break and enter211.6172.8
Theft from vehicles108.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.