HousePrecheckCheck an address

156 Bathurst StToronto · zoning, lot size and permit records

Also 158 Bathurst St

9.4 × 27.6 m245 m²on Bathurst St

Not a home

Land without a building

A demolition permit (23 128397, 2023) is on file and no permit for a new building: the land is probably empty or used for parking. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 23 128397 (Proposal to demolish the existing retail store for a future development.(23 117128 BLD..., 2023); 22 139971 STE 10 SA (Site Plan Control application for a 29-storey mixed-use building containing 384 new dwe..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 30 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
N10 m
9.4 m frontage27.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 128397 (Proposal to demolish the existing retail store for a future development.(23 117128 BLD..., 2023); 22 139971 STE 10 SA (Site Plan Control application for a 29-storey mixed-use building containing 384 new dwe..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 30 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Development application24 222996 STE 10 OZClosed

    Zoning Bylaw Amendment application for a 29-storey mixed-use building containing 362 new dwelling units(including 9 affordable units), a total of 23,508 sqm of residential gross floor area (GFA), and 610 sqm of retail GFA which results in a total Floor Space Index (FSI) of 11.04. This application seeks to amend the previous approval of an 18-storey mixed-use building that was Council approved in 2023.

    Oct 7, 2024 · 156 BATHURST ST · City file
  • Building permit23 128397Examiner's Notice Sentdemolition

    Proposal to demolish the existing retail store for a future development.(23 117128 BLD 00 NB)

    Mar 29, 2023 · 156 BATHURST ST
  • Development application22 139971 STE 10 SANOAC Issued

    Site Plan Control application for a 29-storey mixed-use building containing 384 new dwelling units(including 9 affordable units), a total of 22,565 sqm of residential gross floor area (GFA), and 582 sqm of retail GFA. This site was previously approved for an 18-storey mixed-use building.

    Apr 29, 2022 · 156 BATHURST ST · City file
  • Development application21 181257 STE 10 OZClosed

    Official Plan & Zoning By-law Amendment application for an 18-storey mixed-use building having a non-residential gross floor area of 585 square metres, and a total of 216 residential dwelling units.

    Jul 8, 2021 · 158 BATHURST ST · City file
  • Building permit16 160217Cancelled

    To erect and display one illuminated wall sign. **CYCLEMOTIVE**

    May 25, 2016 · 156 BATHURST ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
245 m²
Frontage
9.4 m
Depth
27.6 m
Street
Bathurst St
Corner lot
No
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: hackberry (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
84%31 of 37 decisions
Garden suite permits
1
Laneway suite permits
4
Multiplex permits
7
Development applications
29

Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 37 variance decisions: more than at 71% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey detached building (houseplex) with a front entrance and stairs, three side (west) covered entrances with stairs, side (west) second storey covered balconies, a second storey corner (northwest) covered balcony and a rear third floor rooftop patio. Also, there will be three vehicular parking spaces in the rear yard, accessed from the abutting laneway (Lane North Carr East Ryerson). There will be a total of six residential dwelling units on this lot.

    42 CARR ST · Nov 4, 2026 · 409 m away
  • Minor varianceRefused

    To construct a new three-storey detached apartment building with front (east), rear (west) and side yard (south) basement walkouts, a below-grade patio on the side yard (south), front and rear porches with stairs, a side yard (south) ground floor entrance with stairs, front, rear and side (south) second storey and third storey balconies, and roof access (for mechanical equipment).Also, to construct a new rear two-storey detached ancillary building (laneway suite) containing three dwelling units, a basement, and roof access (for mechanical equipment). There will be waste storage located in the basement and two-short-term bicycle parking spaces in the front yard. Also, there will be a total of twelve residential dwelling units on this lot (nine units within the main dwelling and three units in the ancillary building).

    74 MARKHAM ST · Oct 14, 2026 · 427 m away
  • Minor varianceApproved

    To alter the existing two-storey townhouse dwelling by constructing a new partial rear two-storey addition (to replace the existing partial rear two-storey addition) and a rear stone patio. The existing rear one-storey detached ancillary building (garage) will be demolished.

    157 WOLSELEY ST · Jul 15, 2026 · 257 m away
  • Minor varianceApproved

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway.

    736 RICHMOND ST W · Apr 15, 2026 · 368 m away
  • Minor varianceApproved

    To construct a new one-storey detached commercial (retail) building with a mezzanine level at the rear portion of the building.

    686 QUEEN ST W · Feb 18, 2026 · 330 m away

Latest activity nearby

  • Minor variancePending

    To construct a new three-storey semi-detached dwelling with a front basement walkout, a front porch with stairs, a front third storey covered balcony, and a rear third storey juliette balcony. Also, a rear yard parking pad (abutting the laneway) will be constructed.

    12 WHITAKER AVE · Dec 16, 2026 · 296 m away
  • Minor variancePending

    To permit a self-storage facility (Storage Warehouse, Class A) within the existing 10-storey commercial building by converting portions of the second floor, and the full fourth and sixth floors into a self-storage facility, with a co-working space occupying the remaining portion of the second floor. The remaining portions of the building will continue to be used for commercial and office uses. There will be a total of 125 parking spaces provided (89 within the underground parking garage and 36 in the rear surface level lot).

    720 KING ST W · Dec 9, 2026 · 238 m away
  • Building permit

    Interior alterations - Unit 505

    720 KING ST W · Nov 20, 2026 · 238 m away
  • Zoning review

    Not Started

    632 QUEEN ST W · Nov 10, 2026 · 200 m away
  • Building permit

    1 Wall Sign*****Mark Health Network*****

    575 QUEEN ST W · Nov 5, 2026 · 287 m away
  • Building permit

    Proposal for interior alteration of existing office for new model suite.

    555 RICHMOND ST W · Nov 3, 2026 · 132 m away
  • Building permit

    INTERIOR ALTERATION OF EXISTING OFFICE FOR NEW MODEL SUITE.

    555 RICHMOND ST W · Nov 2, 2026 · 132 m away
  • Zoning review

    Closed

    588 RICHMOND ST W · Oct 29, 2026 · 170 m away
  • Building permit

    1 Wall Sign****ORCHARD KITCHEN****

    700 KING ST W · Oct 28, 2026 · 220 m away
  • Zoning review

    Closed

    689 KING ST W · Oct 23, 2026 · 281 m away

Neighbourhood: West Queen West

About the area around the lot, not the lot itself.

Nearest station
St. Andrew Station24 min walk
Nearest TTC stop
Bathurst St at Queen St West2 min walk
Nearest cycling route
Bathurst StBike Lane, 1 min walk
Nearest traffic count
13,967 vehicles in 14 hBathurst St / Richmond St W, 50 m away, Jul 25, 2026
Serious collisions within 500 m
132021–2026, killed or seriously injured: 0 fatal, 8 with pedestrians, 3 with cyclists
Parks
Adelaide Place Parkette3 min walk
Portland Street Parkette4 min walk
ALEX WILSON COMMUNITY GARDEN - Open Green Space5 min walk

Schools within 1 km

  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 1 min walk
  • NIAGARA STREET JR PUBLIC SCHOOL English Public 7 min walk
  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 7 min walk
  • CHARLES G FRASER JR PUBLIC SCHOOL English Public 9 min walk
  • RYERSON COMMUNITY SCHOOL & DOWNTOWN VOCAL MUSIC ACADEMY English Public 10 min walk
  • DISCOVERING MINDS MONTESSORI SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWest Queen WestMedian neighbourhood
Median household income (2020)$101,000$84,500
Households that own their home54%54%
Population (2021)13,17016,813
Homes built in 1960 or before14%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWest Queen WestCity median
Assault588.7636.3
Robbery51.869.5
Shootings6.510.5
Auto theft84.1192.6
Theft over $5,00019.446.1
Break and enter258.8172.8
Theft from vehicles181.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.