HousePrecheckCheck an address

155 University AveToronto · zoning, lot size and permit records

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2333)26.2 × 60.1 m1,516 m²on University Avecorner, also on Pearl Stbacks onto Ln W York N Pearl

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 264391 (Interior alterations to an existing office - Unit 600, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 14 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: QueenThe City plans more homes around the station: good for transit, and more building over time.
N20 m
26.2 m frontage60.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 12 building permits open, the oldest since 2010

    Needs a closer look

    Still open in the City's records: 23 216418 (proposed install mag locks, 2023, status Permit Issued); 23 190724 (Proposed new door opening and pavers on the roof of an existing office building, 2023, status Permit Issued); 18 185983 (Replacement of the existing fire alarm control panel. New panel to be completely new an..., 2018, status Permit Issued); and 9 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 264391 (Interior alterations to an existing office - Unit 600, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 14 development applications open within 300 m

    Good to know

    14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

145 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 264391Permit Issued

    Interior alterations to an existing office - Unit 600

    Nov 5, 2026 · 155 UNIVERSITY AVE
  • Building permit26 148071Cancelled

    Revision 01: Revision to permit, refer to attached addendumDEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.

    Jun 16, 2026 · 155 UNIVERSITY AVE
  • Building permit26 179796Closed

    Proposal to replace faulty existing 1-1/2" RP backflow device with a new 1-1/2" RP backflow

    Jun 15, 2026 · 155 UNIVERSITY AVE
  • Building permit25 246491Closed

    Revision 01: Proposal to revise layout. Proposal for renovations for ACS Infrastructure.

    Mar 23, 2026 · 155 UNIVERSITY AVE
  • Building permit24 230953Closed

    Rev 02: revision to add Fire Protection Plan and Electrical drawings to permit. As-build Spirnkler drawing provided as reference , no changes to sprinklersRevision 01: We are applying for the electrical permit on the already issued interior alteration office permit. Original permit was issued for the mechanical (24 230953 PLB 00 PS) and architectural scope of work. Also, sprinkler as built drawings.Proposal for Interior alteration to the existing office space at the 18th floor of unit 1800. Removal of partition walls and installation of some new partition wall.

    Oct 1, 2025 · 155 UNIVERSITY AVE
  • Building permit25 216713Closed

    PROPOSAL FOR INTERIOR ALTERATION OF EXISTING OFFICE FOR NEW TENANT FIT OUT.

    Sep 3, 2025 · 155 UNIVERSITY AVE
  • Building permit25 191857Closed

    Installation of new roof anchors, west side of roof to improve swing stage and bosun's chair window cleaning and exterior cladding maintenance access.

    Aug 7, 2025 · 155 UNIVERSITY AVE
  • Building permit25 127769Closed

    PROPOSED INTERIOR ALTERATIONS BY DEMOLISHING INTERIOR WALL PARTITIONS. BUILDING NEW WALLS FOR NEW OFFICES AND KITCHEN.

    Mar 26, 2025 · 155 UNIVERSITY AVE
Show 137 older records
  • Building permit25 100617Closed

    Demolish interior wall partition, building new walls for new offices and kitchen. Unit 1610.

    Jan 10, 2025 · 155 UNIVERSITY AVE
  • Building permit24 228246Closed

    PROPOSED DEMOLISHING INTERIOR WALL PARTITION IN BOARDROOM. BUILDING NEW WALL N STORAGE AREA TO MAKE TWO STORAGE AREAS.

    Nov 1, 2024 · 155 UNIVERSITY AVE
  • Building permit24 186459Closed

    Demolish interior wall partitions, replacing existing light fixtures with new fixtures, replace existing electrical outlets, install new glazing partition and install new furniture to space - Suite 750

    Jul 26, 2024 · 155 UNIVERSITY AVE
  • Building permit24 171573Closed

    Washroom re-fresh to existing washroom - 16th floor

    Jul 26, 2024 · 155 UNIVERSITY AVE
  • Building permit24 183442Cancelled

    Proposal for Office Fitout including new partition walls, redistribution of HVAC, plumbing, fire protection and electrical services

    Jul 24, 2024 · 155 UNIVERSITY AVE
  • Building permit24 166724Closed

    Proposed interior alterations to an existing office unit 1210 new glazed partition and demolishing interior partitions.

    Jun 20, 2024 · 155 UNIVERSITY AVE
  • Building permit24 161934Closed

    Proposed minor interior alterations to existing office.

    Jun 12, 2024 · 155 UNIVERSITY AVE
  • Building permit24 138921Closed

    Proposed interior alterations for offices at suite 720.

    May 2, 2024 · 155 UNIVERSITY AVE
  • Building permit23 212562Closed

    Revision 02 - to office wallREVISION 01 TO PERMIT 23 212562 BLD 00. Revised interior office wall typeINTERIOR ALTERATIONS FOR OFFICES AT SUITE 500.Proposal for interior alterations to the existing 5th floor level (suite 500) for an office tenant - 'GWL' model suite.

    Dec 15, 2023 · 155 UNIVERSITY AVE
  • Building permit23 216418Permit Issued

    proposed install mag locks

    Oct 24, 2023 · 155 UNIVERSITY AVE
  • Building permit23 190724Permit Issued

    Proposed new door opening and pavers on the roof of an existing office building.

    Oct 24, 2023 · 155 UNIVERSITY AVE
  • Building permit23 182750Closed

    Proposal for interior alterations to existing office unit 800 located on the entire 8th floor level for office tenant - 'AMO - Association of Municipalities Ontario'.

    Sep 8, 2023 · 155 UNIVERSITY AVE
  • Building permit23 144533Closed

    Proposal for interior alterations (demolition) to return an existing office on the 8th floor level to base building conditions.

    Jun 8, 2023 · 155 UNIVERSITY AVE
  • Building permit22 229562Closed

    Office fit-out including new partition walls, redistribution of HVAC and plumbing

    Feb 3, 2023 · 155 UNIVERSITY AVE
  • Building permit22 232410Closed

    interior alterations - Unit 720

    Dec 6, 2022 · 155 UNIVERSITY AVE
  • Building permit22 126522Closed

    Proposal for interior alterations to an existing office space (unit 400).

    Apr 22, 2022 · 155 UNIVERSITY AVE
  • Building permit22 128863Closed

    Proposal for interior alteration.(Unit 1500)

    Apr 4, 2022 · 155 UNIVERSITY AVE
  • Building permit21 227268Closed

    Proposal for interior alterations to an existing office unit 200.

    Dec 3, 2021 · 155 UNIVERSITY AVE
  • Building permit21 235648Closed

    Proposal for interior alterations to office unit 1910

    Nov 17, 2021 · 155 UNIVERSITY AVE
  • Building permit21 216201Closed

    Proposal for plumbing standalone

    Oct 8, 2021 · 155 UNIVERSITY AVE
  • Building permit21 212656Closed

    Proposal for interior alterations for office unit 400

    Sep 28, 2021 · 155 UNIVERSITY AVE
  • Building permit20 198082Closed

    Proposal for base building washroom re-fresh on the 2nd floor of the existing office building.

    Oct 27, 2020 · 155 UNIVERSITY AVE
  • Building permit20 149735Closed

    Proposal for interior alterations to floors 10 and 11 - 'Canada Life'

    Jun 26, 2020 · 155 UNIVERSITY AVE
  • Building permit19 144185Closed

    Proposal to replace the generator on rooftop space with new platform.

    Jun 5, 2019 · 155 UNIVERSITY AVE
  • Building permit18 241101Closed

    Interior alterations to existing office space on the 7th floor. Suite 700.

    Oct 22, 2018 · 155 UNIVERSITY AVE
  • Building permit18 194348Closed

    Proposal to re-balance HVAC in men's and women's washroom on the 7th floor of existing office building.

    Sep 7, 2018 · 155 UNIVERSITY AVE
  • Building permit18 194327Closed

    Proposal to replace plumbing fixtures in men's and women's washroom on the 7th floor of existing office building.

    Sep 7, 2018 · 155 UNIVERSITY AVE
  • Building permit18 185983Permit Issued

    Replacement of the existing fire alarm control panel. New panel to be completely new and will have capacity to add visual fire alarm devices (strobes) in public areas throughout the building.

    Jul 31, 2018 · 155 UNIVERSITY AVE
  • Building permit17 213989Permit Issued

    Proposal for exterior deck construction on the 20th floor of an existing office building.

    Jun 13, 2018 · 155 UNIVERSITY AVE
  • Building permit18 140510Closed

    Proposal for interior alteration, tenant fit up to existing office building . Suit 303

    Apr 23, 2018 · 155 UNIVERSITY AVE
  • Building permit18 102927Closed

    Proposed interior alterations to expand existing tenant suite.

    Jan 26, 2018 · 155 UNIVERSITY AVE
  • Building permit18 102941Closed

    Proposed maglock installation.

    Jan 10, 2018 · 155 UNIVERSITY AVE
  • Building permit17 251844Closed

    HVAC - PROPOSED: 17th Floor - Interior alterations/renovations to corridor and washroom ( HVAC & Plumbing)

    Nov 30, 2017 · 155 UNIVERSITY AVE
  • Building permit17 257073Closed

    Interior Alterations office to office to Unit 1610

    Nov 16, 2017 · 155 UNIVERSITY AVE
  • Building permit17 223155Closed

    Proposed interior alterations to existing office unit #300.

    Sep 26, 2017 · 155 UNIVERSITY AVE
  • Building permit17 216586Closed

    Proposal for interior alterations to existing office building. Unit 1600. Tenant is "Fujistsu Canada Inc"

    Sep 13, 2017 · 155 UNIVERSITY AVE
  • Building permit17 176851Closed

    Proposal to do interior alterations in unit 900 - 3 new offices

    Jun 21, 2017 · 155 UNIVERSITY AVE
  • Building permit17 117402Cancelled

    install 1 new maglock

    Mar 15, 2017 · 155 UNIVERSITY AVE
  • Building permit17 107150Closed

    Proposal to replace an existing single - cell cooling tower on the north/east corner of the roof of the 21 storey office building.

    Feb 6, 2017 · 155 UNIVERSITY AVE
  • Building permit17 104816Closed

    Interior alterations to existing office.

    Jan 23, 2017 · 155 UNIVERSITY AVE
  • Building permit16 169663Closed

    Proposal for interior alterations to units/floors 1900-2000-2100 in existing office - tenant is "Maropost"

    Jul 28, 2016 · 155 UNIVERSITY AVE
  • Building permit16 170963Inspection

    Applicant proposed demolition of an office on the 18th floor of the existing building.

    Jul 14, 2016 · 155 UNIVERSITY AVE
  • Building permit16 167746Closed

    Interior alterations to existing office on the 6th floor. Suite 600. Tenant - "ONTARIO PHARMACISTS ASSOCIATION".

    Jul 12, 2016 · 155 UNIVERSITY AVE
  • Building permit16 148824Closed

    Plumbing - Interior alterations to 15th floor

    Jul 7, 2016 · 155 UNIVERSITY AVE
  • Building permit16 111686Closed

    Revision #1: INTERIOR ALTERATIONS - changes to the reflected ceiling plan drawings only ID10-103A.01, ID11-103A.01, ID10-103B.01, ID11-103B.01. Entire drawing changed to utilize existing t-bar ceiling in lieu of open ceiling as per proposed original permit set.Interior alterations to existing office space on floors 10 and 11. Tenant - "Great West Life Market Stategy and Innovation". Note: See active Interior Demo permit 16 106050 BLD.

    Jun 21, 2016 · 155 UNIVERSITY AVE
  • Building permit16 156496Inspection

    INSTALL MAGLOCKS ON FLOORS 10, 11

    Jun 20, 2016 · 155 UNIVERSITY AVE
  • Building permit16 144196Closed

    Proposal for interior alterations to existing office space on the 3rd floor - Unit 302

    May 6, 2016 · 155 UNIVERSITY AVE
  • Building permit16 118091Closed

    5th floor - interior alterations to existing office space -partitioning to create four small offices, one boardroom, two meeting rooms, and one quiet room/reading area.

    Mar 11, 2016 · 155 UNIVERSITY AVE
  • Building permit16 111755Cancelled

    Proposal for interior alterations for the installation of a vertical convenience lift between floors 19, 20 and 21.

    Feb 18, 2016 · 155 UNIVERSITY AVE
  • Building permit16 106050Permit Issued

    Interior demolition to existing office space on floors 10 & 11.

    Feb 18, 2016 · 155 UNIVERSITY AVE
  • Building permit15 244437Closed

    HVAC - Proposal for interior alterations to existing office space on the 14th floor - Unit 1450, Great West Life

    Nov 30, 2015 · 155 UNIVERSITY AVE
  • Building permit15 237439Closed

    Install one new Electromagnetic Locks to a existing office

    Nov 5, 2015 · 155 UNIVERSITY AVE
  • Building permit15 206267Closed

    Interior alterations to the 9th floor of the existing office building.

    Sep 10, 2015 · 155 UNIVERSITY AVE
  • Building permit15 169889Cancelled

    Interior alterations to Unit 1610, to create a Model Suite for leasing purposes.

    Jul 7, 2015 · 155 UNIVERSITY AVE
  • Building permit15 161060Closed

    Proposal to return suite 302 in existing office building to base building condition.

    Jun 17, 2015 · 155 UNIVERSITY AVE
  • Building permit15 156121Closed

    Proposal to return suite 301 in existing office building to base building condition.

    May 26, 2015 · 155 UNIVERSITY AVE
  • Building permit15 149763Closed

    To complete interior alterations to Suite 1805 located on the 18th floor of the existing office building for "VERITAAQ". Included is realted HVAC and PLB work

    May 11, 2015 · 155 UNIVERSITY AVE
  • Zoning review15 119683 LPRClosed
    Feb 20, 2015 · 155 UNIVERSITY AVE
  • Building permit14 215460Closed

    To install a mag lock on the 8th floor at elevator lobby

    Sep 15, 2014 · 155 UNIVERSITY AVE
  • Building permit14 179628Closed

    To complete interior alterations to the 8th floor of the existing office building.

    Jul 10, 2014 · 155 UNIVERSITY AVE
  • Building permit14 152076Closed

    To complete interior alterations to Unit 500 on the fifth floor of the existing office building.

    May 28, 2014 · 155 UNIVERSITY AVE
  • Building permit14 154178Closed

    Proposal for interior alterations to existing office space on the 4th floor - Aequitas Innovations Inc.

    May 26, 2014 · 155 UNIVERSITY AVE
  • Building permit14 123153Closed

    Proposal for interior alterations to the ground floor of existing building for "Pizzeria Libretto" restaurant with 98 seats. Proposal to include for HVAC and PLB.

    Mar 27, 2014 · 155 UNIVERSITY AVE
  • Building permit14 127928Closed

    Proposal to construct interior alteration to suite 720 in the existing office building.

    Mar 17, 2014 · 155 UNIVERSITY AVE
  • Building permit14 109987Closed

    To complete interior alterations to suite 780 located on the 7th floor of the existing office building.

    Jan 30, 2014 · 155 UNIVERSITY AVE
  • Building permit13 279010Closed

    Proposed interior alterations to existing office space (269m2) on sixth floor for Quintell Solutions Inc.

    Jan 14, 2014 · 155 UNIVERSITY AVE
  • Building permit14 102467Closed

    Proposed base building mechanical upgrades only

    Jan 10, 2014 · 155 UNIVERSITY AVE
  • Building permit14 102451Cancelled

    Proposed base building mechanical upgrades only

    Jan 9, 2014 · 155 UNIVERSITY AVE
  • Building permit13 132456Closed

    Proposal for interior (155m2) and exterior (277m2) alterations to ground floor and podium in existing multiple unit building.

    May 31, 2013 · 155 UNIVERSITY AVE
  • Building permit13 174664Inspection

    proposal for interior alterations to the 18th floor (unit # 1805) of existing office building

    May 30, 2013 · 155 UNIVERSITY AVE
  • Building permit13 174624Inspection

    Proposal for interior alterations on the 14th floor of existing office building

    May 30, 2013 · 155 UNIVERSITY AVE
  • Building permit13 152020Closed

    Proposal for interior alterations to the 19, 20, & 21st floors of existing office building.

    May 14, 2013 · 155 UNIVERSITY AVE
  • Building permit12 264818Inspection

    Proposal for interior alterations to 7th floor - Suite 750.

    Oct 31, 2012 · 155 UNIVERSITY AVE
  • Building permit12 259606Closed

    Plumbing - Proposal for interior alterations on 19th floor office. (20m2)

    Oct 16, 2012 · 155 UNIVERSITY AVE
  • Building permit12 103137Closed

    permit for interior alterations to exisitng office space - floor 15 - suite 1500 - Fujitsu Canada

    Jan 18, 2012 · 155 UNIVERSITY AVE
  • Building permit11 141088Closed - Dormant

    Proposal for interior alterations to 8th floor for existing office tenant "Infrastructure Technology Services" (47m2).

    Mar 11, 2011 · 155 UNIVERSITY AVE
  • Building permit11 117294Closed

    permit to install 22 floor drains in existing office space - floors 2,3,4,6,12,14,16,17,19,15,18. PHASE 2. PLEASE SEE 11 111399 PSA for PHASE 1.

    Feb 17, 2011 · 155 UNIVERSITY AVE
  • Building permit11 111399Closed

    permit to install 10 floor drains in existing office space - floors 5,8,9,10,11.

    Jan 25, 2011 · 155 UNIVERSITY AVE
  • Building permit10 297240Closed

    Interior alterations to existing office space on the 12th floor.

    Nov 23, 2010 · 155 UNIVERSITY AVE
  • Building permit10 275463Closed

    Interior alterations to the 17th floor for a new office layout, the tenant is "MCDONALD & PARTNERS LLP". The work will be taking place at the south portion. This proposal includes plumbing and HVAC.

    Oct 18, 2010 · 155 UNIVERSITY AVE
  • Building permit10 236901Permit Issued

    Proposal for interior alterations to existing office space on the 3rd floor, unit #301.

    Aug 23, 2010 · 155 UNIVERSITY AVE
  • Building permit10 222182Closed

    Interior alterations on the 12th floor, suite #1240 for "CUCO RESOURCES LIMITED". This is for an interior office layout change and includes a sink and a shower.

    Jul 29, 2010 · 155 UNIVERSITY AVE
  • Building permit10 150075Closed

    Interior alterations to existing office space on the 14th floor. Suite 1410.

    Apr 27, 2010 · 155 UNIVERSITY AVE
  • Building permit10 117612Inspection

    Interior alterations to existing office on the 16th floor.

    Mar 1, 2010 · 155 UNIVERSITY AVE
  • Building permit09 162576Closed - Dormant

    Proposal to install two back flow prevention devices

    Sep 3, 2009 · 155 UNIVERSITY AVE
  • Building permit09 153501Closed - Dormant

    HVAC - Proposal for interior alterations to existing office space on the 17th floor. Tenant is Paterson, Grant and Watson Ltd.

    Aug 13, 2009 · 155 UNIVERSITY AVE
  • Building permit09 125043Closed

    Interior alterations to portion of 12th floor within suite.

    Apr 22, 2009 · 155 UNIVERSITY AVE
  • Building permit09 120746Closed

    Proposal for interior alterations on 12th floor office, suite 1210, for existing tenant "DKG Group" (5m2).

    Apr 2, 2009 · 155 UNIVERSITY AVE
  • Building permit09 110905Closed

    Interior alterations to existing office space - floor 12 suite 1240 - First uranium

    Feb 27, 2009 · 155 UNIVERSITY AVE
  • Building permit08 204827Closed

    Interior alterations to existing office - interior alterations to demolish office partition wall and make space for work station. 17th- LOOMIN & DUNN

    Oct 2, 2008 · 155 UNIVERSITY AVE
  • Building permit07 285338Closed

    Interior alterations to existing office suite on 4th floor.

    Dec 13, 2007 · 155 UNIVERSITY AVE
  • Building permit07 274953Closed

    Interior alterations to portion of existing Office on 5th floor. Single tenant floor

    Nov 7, 2007 · 155 UNIVERSITY AVE
  • Building permit06 112355Closed

    Interior alterations to part of 7th floor

    Mar 7, 2006 · 155 UNIVERSITY AVE
  • Building permit05 192423Closed

    Interior alterations to a portition of the second floor

    Oct 25, 2005 · 155 UNIVERSITY AVE
  • Building permit05 142042Closed

    2nd floor interior alterations to existing office building.

    Jun 15, 2005 · 155 UNIVERSITY AVE
  • Building permit04 107392Closed

    Install partitions on 10th floor

    Feb 5, 2004 · 155 UNIVERSITY AVE
  • Building permit03 159072Closed

    Install water cooled air conditioning unit for computer room on the 8th floor.

    Jul 31, 2003 · 155 UNIVERSITY AVE
  • Building permit03 112883Closed

    Install 2 mag locks at 5th floor elevator lobby

    Mar 6, 2003 · 155 UNIVERSITY AVE
  • Building permit03 109160Closed

    install partitions on portion of 5th floor

    Feb 20, 2003 · 155 UNIVERSITY AVE
  • Building permit02 197631Closed

    install air conditioning unit on 8th floor computer room

    Jan 31, 2003 · 155 UNIVERSITY AVE
  • Building permit02 188847Closed

    Interior alterations to portion of 18th floor, ( offices of Blouin, Dunn, LLP)

    Nov 14, 2002 · 155 UNIVERSITY AVE
  • Building permit02 160442Closed

    make interior alterations to portion of 18th floor, suite 1805 TENANT: iserv ontario

    Aug 8, 2002 · 155 UNIVERSITY AVE
  • Building permit02 105561Closed

    Create a group telecommunication room(pop) @ P2 level.

    Jan 24, 2002 · 155 UNIVERSITY AVE
  • Building permit01 178531Closed

    Provide interior alterations to an office for a demising wall on the 15th floor

    Sep 20, 2001 · 155 UNIVERSITY AVE
  • Building permit01 162264Closed

    install on 19th floor: 1 k.s., 1 h.w.t. in existing office space. Tenant: Insurance Brokers Association of Canada cost included in 01-140665 edc

    Jul 25, 2001 · 155 UNIVERSITY AVE
  • Building permit01 119757Closed

    Alter HVAC system and related duct work on 17th floor. Tenant: Beacon Group cost included in 01 110015

    Jun 27, 2001 · 155 UNIVERSITY AVE
  • Building permit01 145500Closed

    install partitions on portion of 10th floor. tenant: I Serve. Ontario

    Jun 14, 2001 · 155 UNIVERSITY AVE
  • Building permit01 142174Closed

    alter hvac system portion of 19th fl - cost included in bp 01-140665 Tenant: Insurance Brokers Association of Canada

    Jun 14, 2001 · 155 UNIVERSITY AVE
  • Building permit01 140665Closed

    Interior alterations to the 19th floor (partial) for office space. Tenant: Insurance Brokers Association of Canada

    May 31, 2001 · 155 UNIVERSITY AVE
  • Building permit01 119756Closed

    Replace wood entrance doors with glass doors (entrance doors to suite 1710 on 17th floor for office use. (in association with 01 110015) Tenant: Beacon Group

    May 7, 2001 · 155 UNIVERSITY AVE
  • Building permit01 110015Closed

    interior alterations partitions & ceiling ste 1710 tenant: beacon group advisors

    May 7, 2001 · 155 UNIVERSITY AVE
  • Building permit00 358757Closed

    Partition alterations on the 6th floor. Tenant: Johnston Smith International

    Nov 30, 2000 · 155 UNIVERSITY AVE
  • Building permit00 354283Closed

    make interior altertions to portion of 2nd through 10th floor existing office by opening portion of firewall in stairwall for installation of electrical conduits. edc Tenant: Managment Board Secretariat (Iserve division)

    Nov 17, 2000 · 155 UNIVERSITY AVE
  • Building permit00 348253Closed

    Alter existing h.v.a.c. system on portion of the 2nd floor. Tenant: Adelaide Capital Corporation

    Oct 30, 2000 · 155 UNIVERSITY AVE
  • Building permit00 348249Closed

    Install partitions on portion of the 2nd floor. Tenant: Adelaide Capital Corporation FASTRACK

    Oct 26, 2000 · 155 UNIVERSITY AVE
  • Building permit00 157233Closed

    Install HVAC on 17th floor offices. Tenant: RIS Management Cost included in BP 00157225

    Jun 27, 2000 · 155 UNIVERSITY AVE
  • Building permit00 157237Closed

    Install fixtures, 1-1 comp kit sink on portionof 17th fl. (no plans) Tenant: RIS Management Cost included in BP 00157225

    Jun 21, 2000 · 155 UNIVERSITY AVE
  • Building permit00 157225Closed

    Make interior alterations to 17th floor. Tenant: RIS Management

    Jun 21, 2000 · 155 UNIVERSITY AVE
  • Building permit00 126349Closed

    Install water line to 2-cool air condition units C/W .B.F.P.) on 10th floor (see letter from Public Works re approval) edc)Note separate H.V.A.C.Permit Required) A.P.)

    Feb 15, 2000 · 155 UNIVERSITY AVE
  • Building permit99 115977Closed

    make interior alterations to portion of 2nd floor existing office for new tenant.. tenant: nova bancorp group

    Dec 16, 1999 · 155 UNIVERSITY AVE
  • Building permit99 013666Closed

    H.V.A.C. ALTER DUCTWORK ON PORTION OF 15TH FLOOR EXISTING OFFICE. REFER TO APPLICATION NUMBER: 422761 TENANT: MARINBRIDGE INTERNATIONAL COST INCLUDED EDC

    Mar 2, 1999 · 155 UNIVERSITY AVE
  • Building permit97 025586Closed

    ALTER HVAC SYSTEM ON 6TH FLOOR COST INCLUDED WITH APPL.407419 SS

    Jan 28, 1998 · 155 UNIVERSITY AVE
  • Building permit98 012005Closed

    ALTER EXISTING H.V.A.C. SYSTEM ON PORTION OF THE 19TH FLOOR. TENANT: F.R.G. ENTERPRISES REFER TO APPLICATION NUMBER: 407585

    Jan 7, 1998 · 155 UNIVERSITY AVE
  • Building permit97 016106Closed

    ERECT PARTITIONS ON PORTION OF 19TH FLOOR TENANT:NORTHFIELD MINERALS SS

    May 12, 1997 · 155 UNIVERSITY AVE
  • Building permit97 016107Closed

    MAKE ALTERATIONS TO CREATE PUBLIC CORRIDOR SYSTEM ON 19TH FLOOR SS

    May 8, 1997 · 155 UNIVERSITY AVE
  • Building permit97 015863Closed

    INSTALL H.V.A.C. SYSTEM ON PORTION OF 1ST FLOOR, 'STARBUCKS COFFEE' LG

    May 5, 1997 · 155 UNIVERSITY AVE
  • Zoning review97 026230 LTOClosed
    Apr 2, 1997 · 155 UNIVERSITY AVE
  • Building permit97 013656Closed

    ALTER EXISTING H.V.A.C. SYSTEM ON PORTION OF THE 3RD FLOOR OFFICE (STE. 303 & 305). COST INCL. 395455 /LM

    Feb 28, 1997 · 155 UNIVERSITY AVE
  • Building permit97 013650Closed

    ALTER EXISTING H.V.A.C. SYSTEM ON PORTION OF THE 5TH FLOOR OFFICE (STE. 501 & 502). COST INCL. 395448 /LM

    Feb 28, 1997 · 155 UNIVERSITY AVE
  • Building permit96 021809Closed

    MAKE INTERIOR ALTERATIONS TO PORTION OF GROUND FLOOR FOR NEW RESTAURANT (UNDER 30 SEATS). TENANT: STARBUCKS COFFEE" HEALTH DEPARTMENT APPROVAL REQUIRED EDC (MR. PETER AU IS FAMILIAR)

    Nov 7, 1996 · 155 UNIVERSITY AVE
  • Building permit96 016812Closed

    INSTALL H.V.A.C. SYSTEM ON PORTION OF 14TH FLOOR COST INCL. UNDER FILE 386240(B) LG 'PPM REAL ESTATE MANAGERS (CANADA) LIMITED"

    Sep 25, 1996 · 155 UNIVERSITY AVE
  • Building permit96 019020Closed

    INSTALL AIR CONDITIONING UNIT ON PENTHOUSE. LG

    Aug 2, 1996 · 155 UNIVERSITY AVE
  • Building permit96 015491Closed

    ALTER HVAC SYETM ON 12TH FL IN CONNECTION WITH APPL.384919 COST INCLUDED WITH 384919 SS

    Apr 29, 1996 · 155 UNIVERSITY AVE
  • Building permit96 015487Closed

    ALTER HVAC SYSTEM ON 12TH FL IN CONNECTION WITH APPL.384912 COST INCLUDED WITH 384912 SS

    Apr 29, 1996 · 155 UNIVERSITY AVE
  • Building permit96 013974Closed

    ALTER HVAC SYSTEM ON PORTION OF THE 14TH FLOOR. TENANT: STE#1420-30 MEDGATE-CHEETA COST INCLUDED UNDER APPL#383402. DR

    Mar 25, 1996 · 155 UNIVERSITY AVE
  • Building permit96 013977Closed

    HVAC ALTERATIONS ON 14TH FLOOR. COST INCL" 383405 BP

    Mar 22, 1996 · 155 UNIVERSITY AVE
  • Building permit96 013971Closed

    ALTER HVAC SYSTEM ON PORTION OF 14TH FLOOR. TENANT: STE#1410 PETERS AND HARWOOD COST INCLUDED UNDER APPL#383399 DR

    Mar 18, 1996 · 155 UNIVERSITY AVE

Check before you build

  • Site-specific exception 900.11.10(2333)

    Needs a closer look

    1 site-specific rule and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page. 1 part is limited to an area drawn on a by-law diagram; check whether this lot is in it.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2333)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2).

  2. Older by-law A

    Section 12(1) 333 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(1) 397 of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12(2) 132 of former City of Toronto By-law 438-86

  5. Older by-law D

    Section 12(2) 208 of former City of Toronto By-law 438-86

  6. Older by-law E

    Section 12(2) 276 of former City of Toronto By-law 438-86

  7. Older by-law X

    On 155 University Ave., former City of Toronto by-law 283-85

  8. Older by-law Y · diagram area

    On the even numbered addresses 180 to 188 University Ave., 192 and 194 Adelaide St. W., City of Toronto by-law 469-06

21 parts for other addresses
  • F On 77 Adelaide St. W., former City of Toronto by-law 131-78
  • G On 105 Adelaide St. W., 77 Adelaide St. W., 120 King St. W., 130 King St. W., former City of Toronto by-laws 47-80 and 121-80
  • H On 141 Bay St., 45 Bay St., 40 Bay St., 55 Bremner Blvd., 222 Bremner Blvd., 280 Bremner Blvd., the odd numbered addresses of 61-71 Front St. W., 18 Yonge St., …
  • I On 220 Bay St., former City of Toronto by-law 475-91
  • J On 222 Bay St., the odd numbered addresses of 55-77 King St. W., 100 Wellington St. W., former City of Toronto by-law 207-88
  • K On or between the even numbered addresses of 390-394 Bay St., 65 Queen St. W., former City of Toronto by-law 119-68
  • L On 320 Bay St., former City of Toronto by-law 56-87
  • M On 121 King St W., Section 12(2) 135 of former City of Toronto By-law 438-86
  • N On 145R King St. W., the odd numbered addresses of 95-107 Wellington St. W., 70 York St., former City of Toronto by-law 442-88
  • O On 150 King St. W., 75 Simcoe St., former City of Toronto by-law 416-81
  • P On 150 King St W., Section 12(2) 121 of former City of Toronto By-law 438-86
  • Q On 200 King St. W., 71 Simcoe St., 73 Simcoe St., former City of Toronto by-law 417-81
  • R On 200 King St W., Section 12(2) 123 of former City of Toronto By-law 438-86
  • S On the even numbered addresses of 118A-120 Pearl St., 180 University Ave., former City of Toronto by-law 287-90 and Section 12(2) 235 of former City of Toronto …
  • T On 73 Richmond St. W. and 66 Temperance St., City of Toronto by-law 149-02
  • U On the lands municipally known as 75 Simcoe St. in 1981, Section 12(2) 120 and 12(2) 122 of former City of Toronto By-law 438-86
  • V On 1 University Ave., former City of Toronto by-laws 27-83 and 129-83
  • W On 33 University Ave., Section 12(2) 136 of former City of Toronto By-law 438-86
  • Z On 79 Wellington St. W., 85 Wellington St. W., former City of Toronto by-law 318-83
  • AA On the odd numbered addresses of 95-107 Wellington St. W., former City of Toronto by-laws 30-83 and 592-84
  • AB On the even numbered addresses of 150-166 York St., former City of Toronto by-laws 335-80, 522-80, and 107-81.
By-law 569-2013, Chapter 900

Lot facts

Area
1,516 m²
Frontage
26.2 m
Depth
60.1 m
Street
University Ave
Corner lot
Yes, also on Pearl St60.1 m along it
Public lane
Ln W York N Pearl, 96.6 m along it
House footprint
1,016 m²
Back yard
5.6 mhouse to rear lot line
Side yards
1.2 m and 4.7 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
76 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 12.0 (c8.0; r11.7) SS1 (x2333) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: linden (8 cm), maple (6 cm), maple (6 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%16 of 16 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
22

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.

    121 KING ST W · Jul 8, 2026 · 169 m away
  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 475 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 105-2022 (OLT)) for a 47-storey mixed-use building (containing 432 residential dwelling units, retail use on the ground level, and office use on second, third and fourth levels), by reducing the required number of vehicular parking spaces for the residents of this building.

    263 ADELAIDE ST W · Jan 28, 2026 · 401 m away
  • Minor varianceApproved

    To alter the existing 17-storey mixed-use building by constructing a side (east) one-storey addition (patio enclosure for the existing outdoor dining area of Local Public Eatery), abutting Adelaide Street West, and York Street.

    141 ADELAIDE ST W · Jan 14, 2026 · 54 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1219-2023(OLT) for a 61-storey mixed-use building, by increasing the building height to 67-storeys (223 m), the maximum gross floor area (residential and overall), a wind damper enclosure projection beyond the maximum building height, as well as to reduce the minimum non-residential gross floor area (remove the office uses), and reduce the number of loading spaces. There will be a total of 1,003 residential dwelling units on this lot (including 46 affordable units), subject to review under the related Site Plan Control Application (File 20 22 119164 STE 10 SA).

    100 SIMCOE ST · Sep 10, 2025 · 168 m away

Latest activity nearby

  • Building permit

    Proposed interior demolition back to base, including mechanical and sprinkler work.

    130 KING ST W · Nov 24, 2026 · 108 m away
  • Building permit

    Proposed interior alterations to convert existing storage room to new washroom in existing office suite.

    150 YORK ST · Nov 24, 2026 · 111 m away
  • Building permit

    Proposed Interior build-out and alterations to an existing offices.

    150 KING ST W · Nov 24, 2026 · 53 m away
  • Building permit

    Rev 01 - Addition of the sink sewage sump pump in the meeting lounge 1713interior tenant fit-out including demolition, floor preparation, millwork installations, new doors and glazing, drywall partitions and ceilings, flooring and painting, appliance installation, and associated mechanical and electrical work

    121 KING ST W · Nov 24, 2026 · 169 m away
  • Zoning review

    Closed

    136 SIMCOE ST · Nov 23, 2026 · 219 m away
  • Building permit

    Proposal for interior alterations in existing vacant retail unit for new coffee shop.

    154 UNIVERSITY AVE · Nov 23, 2026 · 79 m away
  • Building permit

    Proposal for interior alteration of a retail unit

    77 KING ST W · Nov 23, 2026 · 228 m away
  • Building permit

    Interior alterations to unit 500

    111 RICHMOND ST W · Nov 23, 2026 · 215 m away
  • Building permit

    Proposal for localized loading dock slab concrete repairs and waterproofing replacement

    180 WELLINGTON ST W · Nov 20, 2026 · 241 m away
  • Building permit

    Proposed Fire/Security upgrades for 5 Fire Alarm Control Panels/Nodes by replacing CPU's and LCD's in existing Edwards Fire Alarm Panels ETS3.

    55 UNIVERSITY AVE · Nov 19, 2026 · 185 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
St Andrew Station2 min walk
Nearest TTC stop
St Andrew Station - Northbound Platform1 min walk
Nearest cycling route
University AveCycle Track, 1 min walk
Nearest traffic count
27,446 vehicles in 14 hUniversity Ave / Adelaide St W, 80 m away, Jun 3, 2025
Serious collisions within 500 m
102021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 4 with cyclists
Parks
Simcoe Park7 min walk
Cloud Gardens8 min walk
St. Patricks Square8 min walk

Schools within 1 km

  • OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 9 min walk
  • OCAD UNIVERSITY - STUDENT CENTRE University 9 min walk
  • VICTORIA STREET LINC English Public 10 min walk
  • OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 11 min walk
  • OCAD UNIVERSITY - THE LEARNING ZONE University 11 min walk
  • OCAD UNIVERSITY - MAIN BUILDING 416 977-6000 University 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.