HousePrecheckCheck an address

155 Transway CresToronto · zoning, lot size and permit records

Commercial residential · CR 0.4 (c0.4; r0.0) SS3 (x572)≈ 122.4 × 178.5 m15,824 m²on Transway Cres

Not a home

Kennedy South Commuter Parking Lot

The City of Toronto's real estate inventory lists Kennedy South Commuter Parking Lot here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Permits or applications open on this parcelStill open in the City's records: 22 209101 (Construct new bus bays in the south parking lot of Kennedy station as well as relocatin..., 2023, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
  • Major Transit Station Area: Kennedy (Subway)The City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 122.4 m frontage≈ 178.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2023

    Needs a closer look

    Still open in the City's records: 22 209101 (Construct new bus bays in the south parking lot of Kennedy station as well as relocatin..., 2023, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit22 209101Permit Issued

    Construct new bus bays in the south parking lot of Kennedy station as well as relocating catch basins as well as new site service connections

    Mar 17, 2023 · 155 TRANSWAY CRES

Check before you build

  • Site-specific exception 900.11.10(572)

    Needs a closer look

    6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(572)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite land use permissions for this zone, a vehicle fuel station and a vehicle service station are not permitted uses

  2. Rule B

    The permitted maximum gross floor area , not including the area of basements , is 40 percent of the lot area

  3. Rule C

    The minimum building setback from a lot line that abuts a street is: (i) the greater of 23.0 metres from the original centre line of Eglinton Avenue, or 5.0 metres from a lot line abutting Eglinton Avenue; and (ii) 3.0 metres from a lot line abutting any street other than Eglinton Avenue

  4. Rule D

    The minimum building setback is 7.5 metres from a rear lot line

  5. Rule E

    The requirements of (B), (C) and (D) above, do not apply to a transportation use

  6. Rule F

    Clauses 40.10.40.70 and 40.10.40.80 and regulations 40.10.30.40(1) and 40.10.40.10(5) do not apply to a transportation use . Prevailing By-laws and Prevailing Sections: (None Apply)

  7. Older by-law A

    Despite land use permissions for this zone, a vehicle fuel station and a vehicle service station are not permitted uses

  8. Older by-law B

    The permitted maximum gross floor area , not including the area of basements , is 40 percent of the lot area

  9. Older by-law C

    The minimum building setback from a lot line that abuts a street is: (i) the greater of 23.0 metres from the original centre line of Eglinton Avenue, or 5.0 metres from a lot line abutting Eglinton Avenue; and (ii) 3.0 metres from a lot line abutting any street other than Eglinton Avenue

  10. Older by-law D

    The minimum building setback is 7.5 metres from a rear lot line

  11. Older by-law E

    The requirements of (B), (C) and (D) above, do not apply to a transportation use

  12. Older by-law F

    Clauses 40.10.40.70 and 40.10.40.80 and regulations 40.10.30.40(1) and 40.10.40.10(5) do not apply to a transportation use . Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
15,824 m²
Frontage
122.4 mestimated, irregular lot
Depth
178.5 mestimated, irregular lot
Street
Transway Cres
Corner lot
No
Public lane
None
Max height
11 m
Max lot coverage
33%
  • Major Transit Station Area: Kennedy (Subway). The lot is inside the Kennedy (Subway) Major Transit Station Area approved by the Province (Site and Area Specific Policy 647). Source
  • Zone CR 0.4 (c0.4; r0.0) SS3 (x572) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%3 of 3 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing mixed-use building by constructing interior alterations to convert ground floor retail space into 4 residential units.

    2495 EGLINTON AVE E · Feb 11, 2026 · 367 m away

Latest activity nearby

  • Building permit

    Proposed interior alterations to construct a new Tim Horton's restaurant within Kennedy TTC Station.

    2439 EGLINTON AVE E · Sep 25, 2026 · 143 m away
  • Zoning review

    Notice Sent

    138 BENJAMIN BLVD · Aug 12, 2026 · 189 m away
  • Building permitsecondary suite

    Revision 01 to create basement secondary unitProposal for interior alterations to basement and main floor.

    61 CHEVRON CRES · Jul 20, 2026 · 248 m away
  • Building permit

    Proposed replacement of the fire alarm system

    2467 EGLINTON AVE E · Jul 7, 2026 · 146 m away
  • Building permit

    PROPOSED REPAIR TO SEMI-DETACHED SFD DUE TO FIRE DAMAGE.

    61 CHEVRON CRES · Jun 25, 2026 · 248 m away
  • Building permit

    PROPOSED PORCH IN FRONT YARD

    58 SAUGEEN CRES · May 25, 2026 · 280 m away
  • Building permit

    Part Permit - Construct a new forty (40) storey apartment building containing 417 of non-profit market co-op and affordable co-op units, with a two storey podium

    2444 EGLINTON AVE E · May 19, 2026 · 218 m away
  • Building permit

    Proposal for porch in front yard.

    58 SAUGEEN CRES · May 7, 2026 · 280 m away
  • Building permitsecondary suite

    Proposed interior alteration to legalize basement unit.

    135 BENJAMIN BLVD · Apr 30, 2026 · 233 m away
  • Building permitdemolition

    Demolition of Existing 1 storey industrial building with 1 basement level (re: two new apartment buildings containing non-profit market co-op and affordable co-op units.)

    2444 EGLINTON AVE E · Feb 25, 2026 · 218 m away

Neighbourhood: Kennedy Park

About the area around the lot, not the lot itself.

Nearest station
Kennedy Station1 min walk
Nearest TTC stop
Kennedy Station - Platform B1 min walk
Nearest cycling route
Gatineau Hydro Corridor TrlMulti-Use Trail, 3 min walk
Nearest traffic count
3,320 vehicles in 8 hEglinton Ave E / Transway Cres, 140 m away, Jul 12, 2001
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 0 with cyclists
Parks
Corvette Park8 min walk
Treverton Park8 min walk
Farlinger Ravine10 min walk

Schools within 1 km

  • SALAHEDDIN ISLAMIC SCHOOL Private 4 min walk
  • A PLUS ACADEMY OF ADVANCEMENT Private 5 min walk
  • ST MARIA GORETTI CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
  • CORVETTE JR PUBLIC SCHOOL English Public 10 min walk
  • S/E YEAR ROUND ALTERNATIVE & SCARBOROUGH CENTRE English Public 11 min walk
  • ST JOAN OF ARC CATHOLIC ACADEMY English Separate 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKennedy ParkMedian neighbourhood
Median household income (2020)$69,000$84,500
Households that own their home52%54%
Population (2021)17,11016,813
Homes built in 1960 or before34%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKennedy ParkCity median
Assault1521.5636.3
Robbery121.569.5
Homicide5.35.3
Shootings15.810.5
Auto theft211.3192.6
Theft over $5,00084.546.1
Break and enter158.5172.8
Theft from vehicles401.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.