Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 155 Dundas St E
155 Dundas St E is on a 15.8 m by 26.8 m lot on Dundas St E in Downtown Yonge East. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.
The City has 24 records on this lot since 1989. That is more than at 99% of Toronto houses. In 2019, a building permit was filed: "**development signs**to erect and display two non-illuminated ground signs, one on the easterly frontage along jarvis st and the other on the northerly…". Status: closed. In 2016, a building permit was filed: "In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated overhangings structure sign displaying static copy…". Status: closed. In 2016, a building permit was filed: "Revision to remove vestibule". Status: closed. Nothing on file is open right now.
Within 300 m, 10 development applications are open (the tallest up to 60 storeys). Within 300 m, the Committee of Adjustment decided 25 minor variance applications in the last 10 years and approved 96%. TMU station is a 7-minute walk.
Summary
What the City's records show on this house
- Zoning not in By-law 569-2013Moderate
- 10 development applications open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
24 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2019-10-11 | Building permit12 160381 | **DEVELOPMENT SIGNS**To erect and display two non-illuminated ground signs, one on the easterly frontage along Jarvis St and the other on the northerly frontage along Dundas St. E, in conjunction with a condo development.**Great Gulf Homes** | Closed | |
| 2016-12-21 | Building permit16 172272 | In conjunction with a multi-storey building on the premises, proposal to erect and display one illuminated overhangings structure sign displaying static copy on the first storey north elevation. The proposed sign is 0.44 metres vertically by 3.52 metres horizontally at a height of 3.3 metres above grade.**BRUSH DENTAL** | Closed | |
| 2016-11-09 | Building permit16 213505 | Revision to remove vestibule. | Closed | |
| 2016-09-20 | Building permit16 225824 | Move existing wall (which is currently a stud wall and glass partition with sliding glass door) between Bedroom and Den to make Den larger to convert Den to a 2nd bedroom - new wall will be solid with a non-operating window for natural light. Master bedroom door frame to be moved slightly to accomadate location of moved partition wall; Door added in hallway leading into existing ensuite bathroom. | Cancelled | |
| 2016-06-11 | Building permit16 165874 | In conjunction with a multistorey building on the premises, proposal to erect and display one illuminated overhanging structure sign containing static copy. The overhangings structure sign is located on the west elevation. The proposed sign is 0.45 metres vertically by 3.52 metres horizontally at a height of 2.95 metres above grade. **PITA LAND** | Closed | |
| 2016-04-14 | Building permit16 130251 | Proposal for interior alterations on the ground floor for a restaurant with 26 seats, Unit 1, "Pita Land" | Closed | |
| 2016-02-18 | Building permit16 106726 | Permit to install (1) Maglock on Ground Floor. | Closed | |
| 2015-11-04 | Zoning review12 111034 PSP | No description on file | Closed | |
| 2015-05-05 | Building permit12 115962 | Revision to add 3 additional residential units on level 2. | Closed | |
| 2015-01-28 | Development application15 109611 STE 27 CD | Proposal for draft plan of condominum for a 43 storey mixed use building with 287 residential units and five levels of underground parking | Closed | |
| 2014-05-27 | Minor varianceA0969/13TEY | To alter a previously approved re-zoning application which permitted the re-development of the site with a 43 storey residential building (384 units) and a 7 storey mixed use base and 5 level underground parking to a 45 storey residential building (402 units) and a 7 storey mixed-use base and 5 level underground parking. | Withdrawn | |
| 2014-05-16 | Building permit14 149043 | Sprinklers in relations to Proposal to construction a new mixed use building with retail at grade. It will have 384 residential units with 5 levels of below grade parking. The building is proposed to be a 43 storey building including a 6 storey podium - 12-115962 BLD 00 NB | Closed | |
| 2013-11-05 | Zoning review13 261320 ZPR | No description on file | Closed | |
| 2012-01-10 | Development application12 104231 STE 27 SA | Site plan approval application for the construction of a new mixed use building with retail at grade. It will have 384 residential units with 5 levels of below grade parking. The building is proposed to be a 43 storey building including a 6 storey podium. - 72 Parking Spaces | Closed | |
| 2011-08-31 | Zoning review11 150623 PRZ | No description on file | Closed | |
| 2011-05-04 | Building permit11 150675 | Proposal to demo existing 2 sty commercial building (for future condo). Also see demo permit for 163 (157) Dundas St E. | Closed | |
| 2011-03-14 | Development application11 144529 STE 27 OZ | A rezoning application for the construction of a new mixed use building with retail at grade. It will have 384 residential units with 5 levels of below grade parking. The building is proposed to be a 43storey building including a 10 storey podium. | Closed | |
| 2003-09-02 | Zoning review03 170895 LTO | No description on file | Closed | |
| 2002-12-19 | Zoning review02 196862 LTO | No description on file | Closed | |
| 2001-04-25 | Zoning review01 012567 LTO | No description on file | Closed | |
| 2001-03-27 | Zoning review01 012464 LTO | No description on file | Closed | |
| 2001-03-16 | Building permit01 118800 | Install fixtures on ground floor for restaurant (23 seats); 1 2-compt ks and 1 dishwasher. | Closed | |
| 2001-01-10 | Zoning review01 012061 LTO | No description on file | Closed | |
| 1989-03-02 | Zoning review89 029835 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 159 m²
- Back yard
- 0 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 10 development applications open within 300 m, up to 60 storeys
- 15 suite and multiplex permits within 300 m in 10 years
- 25 minor variance decisions within 300 m, 96% approved
What this part means for this house, in plain EnglishUnlock
10 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Assault: 3.7 times the Toronto median
- Theft over $5,000: 2.2 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
- Robbery: 2.1 times the Toronto median
- Break and enter: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Downtown Yonge East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station7 min walk
- Dundas St East at Jarvis StNearest TTC stop1 min walk
- Shuter StNearest cycling route3 min walk
- Ecole Elementaire Gabrielle RoySchool4 min walk
- Toronto Metropolitan University - School of Interior DesignSchool4 min walk
- St Michael's Choir School - SecondarySchool4 min walk
- St Michael's Choir School - ElementarySchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32360.8
- Robberycity median 69.5143.3
- Shootingscity median 10.511.9
- Auto theftcity median 192.675.6
- Theft over $5,000city median 46.199.5
- Break and entercity median 172.8274.7
- Theft from vehiclescity median 188.1390.1
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist