HousePrecheckCheck an address

154-160 Milvan DrToronto · zoning, lot size and permit records

Employment · EL 1.080.1 × 99.0 m7,930 m²on Milvan Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 26 145998 (Upgrade existing fire protection system to meet storage requirements, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
80.1 m frontage99.0 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit26 145998Inspection

    Upgrade existing fire protection system to meet storage requirements

    May 19, 2026 · 154-160 MILVAN DR
  • Building permit21 171421Inspection

    Proposed Interior Alterations to do water damage restoration unit 154

    Sep 24, 2021 · 154-160 MILVAN DR
  • Building permit14 115689Closed

    Backflow Prevention Devices (Water only) installation.

    Apr 7, 2014 · 154-160 MILVAN DR
  • Building permit10 171361Closed

    Proposed construction to underpin a portion existing foundation wall and repair a portion of existing concrete slab within an existing manufaturing unit.

    May 26, 2010 · 154-160 MILVAN DR

Lot facts

Area
7,930 m²
Frontage
80.1 m
Depth
99 m
Street
Milvan Dr
Corner lot
No
Public lane
None
House footprint
3,736 m²roof up to 7.4 m
Back yard
36.7 mhouse to rear lot line
Side yards
4.6 m and 4.7 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone EL 1.0 (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
0

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To maintain the existing one-storey east side addition.

    12 MILLPORT DR · Mar 7, 2019 · 495 m away
  • Minor varianceApproved

    To convert the existing building into a cultral community centre and a place of worship with children after school drop off programs.

    172 MILVAN DR · Apr 20, 2017 · 57 m away

Latest activity nearby

  • Building permitsecondary suite

    Proposal for interior alterations for a new basement secondary suite.

    94 GOLDSBORO RD · Jun 18, 2026 · 299 m away
  • Building permit

    Upgrade existing fire protection system to meet storage requirements

    154-160 MILVAN DR · May 19, 2026 · 39 m away
  • Building permit

    Install back water valve

    131 NAVENBY CRES · Feb 6, 2026 · 164 m away
  • Zoning review

    Closed

    181 MILVAN DR · Dec 18, 2025 · 256 m away
  • Building permit

    Proposaal for replace/repair building components damaged from roof collapse.

    190 MILVAN DR · May 27, 2025 · 273 m away
  • Building permitmultiplex

    Convert the existing two unit semi-detached dwelling to three dwelling units and a basement walkout. A total of two dwelling units in the basement.

    61 NAVENBY CRES · Jan 28, 2025 · 225 m away
  • Zoning review

    Application On Hold

    139-143 MILVAN DR · Oct 25, 2024 · 139 m away
  • Building permit

    Proposal for interior alterations to convert the existing industrial building into a place of worship with a community centre. See also 15 208188 ZZC, 17 123581 MV and 24 132051 WNP.

    172 MILVAN DR · Apr 30, 2024 · 57 m away
  • Building permitsecondary suite

    Proposal for 2nd suite in basement

    20 NAVENBY CRES · Apr 24, 2024 · 296 m away
  • Minor varianceApproved

    To create a secondary suite within the existing dwelling.

    20 NAVENBY CRES · Mar 28, 2024 · 296 m away

Neighbourhood: Humber Summit

About the area around the lot, not the lot itself.

Nearest station
Pearldale Station18 min walk
Nearest TTC stop
135 Milvan Dr2 min walk
Nearest traffic count
7,639 vehicles in 8 hMillwick Dr / Milvan Dr (North), 380 m away, Feb 14, 2012
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Gracedale Park9 min walk
Whitfield Parkette9 min walk
Islington Park10 min walk

Schools within 1 km

  • ST ROCH CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • GRACEDALE PUBLIC SCHOOL English Public 8 min walk
  • HUMBER SUMMIT MDL SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber SummitMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home72%54%
Population (2021)12,18516,813
Homes built in 1960 or before16%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber SummitCity median
Assault1031.8636.3
Robbery191.169.5
Shootings30.610.5
Auto theft672.6192.6
Theft over $5,000191.146.1
Break and enter397.4172.8
Theft from vehicles282.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.