Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Cultural Heritage Evaluation Report required
Needs a closer lookThis property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.
What it means. Plans to tear down or rebuild will need a heritage evaluation first.
How to confirm. Heritage Planning at the City confirms the status. Details
Official Plan Amendment 720Building permit open since 2018
Needs a closer lookStill open in the City's records: 18 175457 (Proposal to construct a foundation for auxiliary equipment to be mounted on existing pa..., 2018, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)5 development applications open within 300 m
Good to know5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 55 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
13 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 178667 GRA 00 IVNotice Issued
Notice Issued Graffiti
Jun 1, 2026 · 153 DUFFERIN ST - By-law investigation26 174871 GRA 00 IRNotice Issued
Graffiti
Jun 1, 2026 · 153 DUFFERIN ST - By-law investigation25 248422 SIN 00 IRClosed
Signs
Nov 3, 2025 · 153 DUFFERIN ST - Zoning review21 138588 ZZUClosedApr 10, 2021 · 153 DUFFERIN ST
- Zoning review18 240163 LPRClosedOct 10, 2018 · 153 DUFFERIN ST
- Building permit18 209586Closed
Proposal to erect and display one illuminated third party electronic ground sign, containing one sign face measuring 4.88 metres vertically by 17.07 metres horizontally and at an overall height of 19.15 metres above grade at the easterly portion of the property adjacent to the existing warehouse building. The single face on the sign is proposed to display electronic static copy located at the east frontage of the premises. Also contemplated is the removal of an existing third party roof sign at the subject premises and extending the expiration provisions for third party signs from 5 years to 10 years.**OUTFRONT MEDIA** **Dominelli**
Sep 27, 2018 · 153 DUFFERIN ST - Building permit18 175457Inspection
Proposal to construct a foundation for auxiliary equipment to be mounted on existing parking lot of industrial property.
Jun 19, 2018 · 153 DUFFERIN ST - Zoning review17 102686 ZPRClosedJan 10, 2017 · 153 DUFFERIN ST
Show 5 older records
- Zoning review16 269753 ZBAClosedDec 21, 2016 · 153 DUFFERIN ST
- Zoning review11 232938 ZPUClosedJul 6, 2011 · 153 DUFFERIN ST
- Building permit09 145219Closed
Proposal to construct 3 sets of exterior temp stairs on south elevation, new guards on existing entrance ramp on south elevation, interior temperary structural support for roof & skylight, and establish occupant load of 560 people for Luminato Event. June 4-15/09 inclusive.
Jun 5, 2009 · 153 DUFFERIN ST - Zoning review01 142391 000ClosedMay 30, 2001 · 153 DUFFERIN ST
- Building permit87 025109Closed
DEMOLISH A PORTION OF THE WOOD PRODUCT FACTORY ALONG MOWAT AVE AT REAR. P.S. APPROX. 6,700SQ'
Sep 17, 1987 · 153 DUFFERIN ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 6,862 m²
- Frontage
- 78.7 m
- Depth
- 98.3 m
- Street
- Dufferin St
- Corner lot
- Yes, also on Springhurst Ave98.3 m along it
- Public lane
- None
- House footprint
- 2,951 m²roof up to 22.9 m
- Back yard
- 48.3 mhouse to rear lot line
- Side yards
- 0 m and 3.8 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 89%8 of 9 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 12
- Development applications
- 7
Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA).
47 FRASER AVE · Mar 5, 2025 · 255 m away - Minor varianceApproved
To alter the existing non-residential buildings by increasing the Floor Space Index for commercial/office use, and to reduce the number of parking spaces. This site is currently undergoing two Site Plan Control applications (under File Numbers 21 250 999 STE 10 SA and 21 25 1000 STE 10 SA).
41 FRASER AVE · Mar 5, 2025 · 247 m away - Minor varianceApproved
To alter the existing four-storey, non-residential building (including office/workshop and studio/retail and service shop/commercial school uses) by increasing the permitted floor space index and reducing the number of parking spaces to zero.
135 LIBERTY ST · Sep 25, 2024 · 311 m away - Minor varianceApproved
To convert the existing 5-storey building from 56 units to 60 units by converting a portion of the underground garage into residential suites and amenity space.
47 SPENCER AVE · Feb 15, 2023 · 343 m away - Minor varianceApproved
To construct a one-storey ancillary building (detached garage) in the rear yard.
1 THORBURN AVE · Jan 25, 2023 · 83 m away
Latest activity nearby
- Zoning review
Application Acceptable
41 FRASER AVE · Nov 26, 2026 · 247 m away - Building permit
Revision to the following areas - P3 shaft wall added to drawing A010 attached..P2 wall on the north side of the Mechanical Room has been replaced with P3 shaft wall, see drawing A201, attached Details added for the rating of the existing steel beams above the Mechanical room with cementitious fire spray, refer to drawing A602, attached.Addition of entry vestibule. Refer to schedule drawing A011-2, vestibule drawings A012-2, and plans on A201Proposed interior alteration of an existing space into a reception area.
15 FRASER AVE · Nov 24, 2026 · 181 m away - Zoning review
Not Started
42 FRASER AVE · Nov 10, 2026 · 198 m away - Building permit
Proposal for loading dock replacement
41 FRASER AVE · Nov 9, 2026 · 247 m away - Building permit
REV 01: Fire protection planProposal for interior alterations
2-20 FRASER AVE · Nov 5, 2026 · 133 m away - Building permit
Interior cosmetic upgrades including in-suite laundry addition for Unit 309.No changes to existing HVAC - no HVA permit required.
99 TYNDALL AVE · Oct 9, 2026 · 260 m away - Zoning review
Closed
219 DUFFERIN ST · Sep 18, 2026 · 197 m away - Building permit
PROPOSAL FOR URINAL REPLACEMENT.
190 LIBERTY ST · Jun 25, 2026 · 282 m away - Building permit
Proposal to demolish the existing 2 storey SFD-semi dwelling.See also 21 205245 STE 04 SA.
24 TEMPLE AVE · May 26, 2026 · 219 m away - Building permit
Deferred Fees from folder 23 225762 (RSN-5362738) ZoningProcess RSN 76329544
8 TEMPLE AVE · May 22, 2026 · 191 m away
Neighbourhood: South Parkdale
About the area around the lot, not the lot itself.
- Nearest station
- Exhibition GO Station9 min walk
- Nearest TTC stop
- Dufferin St at Springhurst Ave1 min walk
- Nearest cycling route
- Dufferin StSharrows, 3 min walk
- Nearest traffic count
- 15,434 vehicles in 14 hSpringhurst Ave / Dufferin St, 60 m away, Jun 9, 2026
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
- Parks
- Lamport Stadium Park5 min walk
- Dufferin - King Park5 min walk
- Spencer - Cowan Parkette7 min walk
Schools within 1 km
- DR RITA COX - KINA MINAGOK PUBLIC SCHOOL English Public 14 min walk
- HOLY FAMILY CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | South Parkdale | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $57,200 | $84,500 |
| Households that own their home | 15% | 54% |
| Population (2021) | 20,495 | 16,813 |
| Homes built in 1960 or before | 37% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Parkdale | City median |
|---|---|---|
| Assault | 1140.3 | 636.3 |
| Robbery | 68.6 | 69.5 |
| Homicide | 3.8 | 5.3 |
| Shootings | 7.6 | 10.5 |
| Auto theft | 72.5 | 192.6 |
| Theft over $5,000 | 45.8 | 46.1 |
| Break and enter | 240.3 | 172.8 |
| Theft from vehicles | 205.9 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.