HousePrecheckCheck an address

152 Vanderhoof AveToronto · zoning, lot size and permit records

Also 11 Brian Peck Cres, 1 Brian Peck Cres, 5 Brian Peck Cres, 9 Brian Peck Cres

51.1 × 70.2 m3,180 m²on Brian Peck Crescorner, also on Vanderhoof Ave

Not a home

A commercial or mixed-use building

5 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 1 development application open within 300 m, up to 1 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N20 m
51.1 m frontage70.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (18% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (10% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (28% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit21 195871Closed

    Proposal for repair after vehicle impact -unit 101

    Sep 7, 2021 · 152 VANDERHOOF AVE
  • Zoning review08 112668 PLOClosed
    Feb 20, 2008 · 152 VANDERHOOF AVE
  • Zoning review07 117345 PLOClosed
    Mar 21, 2007 · 152 VANDERHOOF AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,180 m²
Frontage
51.1 m
Depth
70.2 m
Street
Brian Peck Cres
Corner lot
Yes, also on Vanderhoof Ave70.2 m along it
Public lane
None
House footprint
727 m²roof up to 12.9 m
Back yard
12.7 mhouse to rear lot line
Side yards
2.6 m and 9.3 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%4 of 4 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      The proposal consists of alterations to extend the basement portion of the dwelling, which is currently under construction.

      80 RYKERT CRES · Oct 29, 2026 · 495 m away
    • Minor varianceApproved

      The proposal is to permit the existing industrial building at 55 Research Road, no changes are proposed to the existing building. Due to the proposed technical severance, the application is to permit a reduced east side yard setback that is created as a result of the re-established lot line between 55 Research Road and 176 Wicksteed Avenue-57 Research Road. Cross-reference File No. B0040/24NY (Delegated Consent).

      55 RESEARCH RD · Apr 3, 2025 · 164 m away
    • Minor varianceApproved

      To construct a new semi-detached garage in the rear yard.

      40 THURSFIELD CRES · Sep 12, 2024 · 388 m away
    • Minor varianceApproved

      To construct a new semi-detached garage in the rear yard.

      42 THURSFIELD CRES · Sep 12, 2024 · 378 m away
    • Minor varianceApproved

      The current application ( new prospective tenant) is proposing an increase in the number of permitted storeys from 6-storeys to 7-storeys, while the overall height of the building (32.025m) will continue to maintain an overall metric height that is below 33.5m.

      154 WICKSTEED AVE · Jun 6, 2024 · 288 m away

    Latest activity nearby

    • Building permit

      Proposal for replacement of existing backflow preventer

      174 WICKSTEED AVE · Nov 6, 2026 · 199 m away
    • Building permit

      The work includes mobilization of crews and site setup with safety measures; structural inspection of existing rebar; layout of the new foundation; GPR scanning to locate utilities; identification and protection of existing column ties; saw cutting of the slab with dust control; removal and disposal of concrete; excavation and auger drilling to specified depths; and installation of reinforcing steel for new pads and piers, all in accordance with approved drawings and applicable codes.

      179 WICKSTEED AVE · Jul 10, 2026 · 280 m away
    • Building permit

      Proposal to replace existing exterior door and frame with structural changes to the existing opening. New door to match or exceed the thermal and fire rating of the existing unit.

      179 WICKSTEED AVE · Jun 5, 2026 · 280 m away
    • Zoning review

      Closed

      135 VANDERHOOF AVE · May 11, 2026 · 205 m away
    • Zoning review

      Application On Hold

      130 RYKERT CRES · Feb 2, 2026 · 298 m away
    • Development application

      Site Plan Control Application proposes to develop the site with a 1 storey mezzanine industrial building for two tenants. 4 loading bays and 44 parking spaces are proposed.

      135 VANDERHOOF AVE · Jan 27, 2026 · 190 m away · City file
    • Building permit

      2 wall signs**INTERIOR CARE IMPRESSIVE CLEAN**

      174 WICKSTEED AVE · Oct 9, 2025 · 199 m away
    • Building permit

      Proposed backwater valve install

      78 THURSFIELD CRES · Sep 8, 2025 · 284 m away
    • Building permit

      2 Wall Signs

      174 WICKSTEED AVE · Sep 5, 2025 · 199 m away
    • Building permit

      2 Wall Signs

      174 WICKSTEED AVE · Aug 8, 2025 · 199 m away

    Neighbourhood: Thorncliffe Park

    About the area around the lot, not the lot itself.

    Nearest station
    Sunnybrook Park Station8 min walk
    Nearest TTC stop
    Vanderhoof Ave at Brian Peck Cres1 min walk
    Nearest cycling route
    Eglinton Ave EBike Lane, 3 min walk
    Nearest traffic count
    1,782 vehicles in 8 hResearch Rd / Vanderhoof Ave / Leslie St, 270 m away, Jun 20, 2005
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Leonard Linton Park1 min walk
    E.T. Seton Park1 min walk
    Serena Gundy Park3 min walk

    Schools within 1 km

    • MARIA MONTESSORI SCHOOL Private 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureThorncliffe ParkMedian neighbourhood
    Median household income (2020)$67,000$84,500
    Households that own their home14%54%
    Population (2021)20,40016,813
    Homes built in 1960 or before21%29%
    Homes needing major repairs9%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleThorncliffe ParkCity median
    Assault638636.3
    Robbery83.969.5
    Auto theft377.7192.6
    Theft over $5,00054.646.1
    Break and enter104.9172.8
    Theft from vehicles226.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.