HousePrecheckCheck an address

152 Brock AveToronto · zoning, lot size and permit records

Employment · EL 2.04.6 × 30.1 m138 m²on Brock Avecorner, also on Middleton St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
N10 m
4.6 m frontage30.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    1 records on file: more than at 53% of Toronto houses (median 0).

    • Building permit14 244613Closed

      Plumbing - Proposal to demolish rear addition and do interior alterations to the ground floor (including new rear opening) & basement of existing single family townhouse. No other exterior work proposed.

      Mar 13, 2015 · 152 BROCK AVE

    Lot facts

    Area
    138 m²
    Frontage
    4.6 m
    Depth
    30.1 m
    Street
    Brock Ave
    Corner lot
    Yes, also on Middleton St30.1 m along it
    Public lane
    None
    House footprint
    59 m²roof up to 10.8 m
    Back yard
    14.4 mhouse to rear lot line
    Side yards
    0 m and 0 mhouse to side lot lines; 0 is a shared wall
    Buildings on the lot
    1house, garage, sheds
    Max height
    14 m
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone EL 2.0 (Employment Light Industrial). Chapter 60, section 60.10 of the by-law. Source
    • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: smoketree, american (8 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    96%26 of 27 decisions
    Garden suite permits
    0
    Laneway suite permits
    4
    Multiplex permits
    11
    Development applications
    1

    Within 300 m, last 10 years. 15 suite and multiplex permits: more than at 83% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

    Latest activity nearby

    • Building permitsecondary suite

      Proposed interior alterations to the existing residential dwelling at 42 Florence Street, Toronto, to construct a new main-floor powder room equipped with one toilet and one vanity sink, including associated plumbing, drainage, and related interior finishing work as required.

      42 FLORENCE ST · Nov 24, 2026 · 180 m away
    • Building permitmultiplex

      Proposal for creating a third dwelling unit in the basement.

      32 FRANKISH AVE · Nov 19, 2026 · 171 m away
    • Building permit

      Proposal for interior alterations and basement underpinning.

      220 BROCK AVE · Nov 16, 2026 · 219 m away
    • Building permitsecondary suite

      Proposal for a new accessory structure.

      15 WYNDHAM ST · Nov 3, 2026 · 169 m away
    • Zoning review

      Notice Sent

      3 DELANEY CRES · Oct 20, 2026 · 31 m away
    • Building permitsecondary suite

      Proposed second dwelling unit in the basement of an existing semi-detached dwelling and enlarge two existing basement windows on the east elevation. No structural changes.

      15 WYNDHAM ST · Oct 16, 2026 · 169 m away
    • Building permitsecondary suite

      Proposal for interior altertion to existing rear 1-storey

      20 MARSHALL ST · Sep 28, 2026 · 256 m away
    • Minor varianceApproved

      To construct a one-storey ancillary building (art workshop), including a green roof, in the rear yard (abutting Mechanic Avenue).

      15 WYNDHAM ST · Sep 23, 2026 · 169 m away
    • Building permitsecondary suite

      Proposal for a new basement apartment proposed in existing semi-detached SFD. Proposed exterior changes to 2 windows.

      15 WYNDHAM ST · Sep 17, 2026 · 169 m away
    • Building permitlaneway suite

      PROPOSED RESIDENTIAL SINGLE FAMILY LANEWAY SUITE

      31 SHIRLEY ST · Sep 16, 2026 · 261 m away

    Neighbourhood: Little Portugal

    About the area around the lot, not the lot itself.

    Nearest station
    Lansdowne Station26 min walk
    Nearest TTC stop
    Dufferin St at Gordon St5 min walk
    Nearest cycling route
    Brock AveSharrows, 1 min walk
    Nearest traffic count
    2,283 vehicles in 8 hBrock Ave / Delaney Cres, 40 m away, Mar 23, 2017
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
    Parks
    McCormick Park1 min walk
    West Lodge Park4 min walk
    Pat Capponi Parkette5 min walk

    Schools within 1 km

    • SHIRLEY ST JR & CITY VIEW ALTERNATIVE English Public 5 min walk
    • PARKDALE JR & SR PUBLIC SCHOOL English Public 6 min walk
    • ALEXANDER MUIR GLADSTONE AVE & THE GROVE English Public 7 min walk
    • ST HELEN CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
    • PARKDALE COLLEGIATE INSTITUTE English Public 12 min walk
    • BROCK JR PUBLIC SCHOOL English Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureLittle PortugalMedian neighbourhood
    Median household income (2020)$86,000$84,500
    Households that own their home43%54%
    Population (2021)15,48516,813
    Homes built in 1960 or before40%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleLittle PortugalCity median
    Assault726.9636.3
    Robbery32.869.5
    Shootings10.910.5
    Auto theft120.2192.6
    Theft over $5,00049.246.1
    Break and enter180.4172.8
    Theft from vehicles191.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.