HousePrecheckCheck an address

151 Carstowe RdToronto · zoning, lot size and permit records

Open space · ON173.9 × 4.6 m795 m²on Carstowe Rd

Not a home

Carstowe Road - Prop D - Se

The City of Toronto's real estate inventory lists Carstowe Road - Prop D - Se here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
N50 m
173.9 m frontage4.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    795 m²
    Frontage
    173.9 m
    Depth
    4.6 m
    Street
    Carstowe Rd
    Corner lot
    No
    Public lane
    None
    Max height
    —
    Max lot coverage
    —
    • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
    • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source
    • 23 City trees in front of this lot. The City's street tree inventory lists 23 trees at this address: linden, littleleaf (52 cm), linden, littleleaf (50 cm), linden, littleleaf (50 cm). Diameter is the trunk at breast height. Source

    Around this lot

    Minor variances approved
    100%40 of 40 decisions
    Garden suite permits
    1
    Laneway suite permits
    0
    Multiplex permits
    9
    Development applications
    1

    Within 300 m, last 10 years. 10 suite and multiplex permits: more than at 75% of Toronto houses (median 3). 40 variance decisions: more than at 75% of Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      Proposal to construct a lower rear deck.

      85 DOUGLAS DR · Nov 23, 2026 · 213 m away
    • Building permit

      rear deck with stairs, rear basement walkout, Interior alteration and renovation

      112 DOUGLAS DR · Oct 30, 2026 · 197 m away
    • Building permit

      Proposal to construct new the and 5th floor additions, a 5 storey side addition, and interior alterations to convert existing residential dwelling to a commercial building.Please confirm the requirement of sprinkler and standpipe system.

      398 SUMMERHILL AVE · Oct 27, 2026 · 202 m away
    • Minor varianceApproved

      To permit a restaurant and a take-out restaurant use on the lower level (basement) and upper level (first storey) storey of the existing semi-detached three-storey mixed-use building (fourth storey is mechanical space). The existing commercial and office space on the second storey, the residential dwelling unit on the third storey and the mechanical space on the fourth storey will be maintained and unaltered.

      398 SUMMERHILL AVE · Oct 21, 2026 · 202 m away
    • Zoning review

      Closed

      119 ROSEDALE HEIGHTS DR · Oct 15, 2026 · 193 m away
    • Building permit

      1 PROJECTING SIGN**INTERIOR COUTURE**

      418 SUMMERHILL AVE · Oct 5, 2026 · 269 m away
    • Building permit

      1 PROJECTING SIGN**INTERIOR COUTURE**

      418 SUMMERHILL AVE · Sep 18, 2026 · 269 m away
    • Building permit

      INTERIOR ALTERATIONS AND PARTIAL UNDERPINNING TO EXISTING SINGLE FAMILY DETACHED HOUSE

      41 ROSEDALE HEIGHTS DR · Aug 31, 2026 · 202 m away
    • Minor variancePending

      Cancelled

      396 SUMMERHILL AVE · Aug 20, 2026 · 193 m away
    • Building permit

      To erect and dispaly one projecting non illuminated sign.***INTERIOR COUTURE***

      418 SUMMERHILL AVE · Aug 20, 2026 · 269 m away

    Neighbourhood: Rosedale-Moore Park

    About the area around the lot, not the lot itself.

    Nearest station
    Summerhill Station17 min walk
    Nearest TTC stop
    Summerhill Ave at Maclennan Ave2 min walk
    Nearest cycling route
    Maclennan TrlMulti-Use Trail, 1 min walk
    Nearest traffic count
    2,074 vehicles in 8 hSummerhill Ave / Maclennan Ave, 110 m away, May 31, 2023
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Carstowe Road Lands1 min walk
    Rosedale Park4 min walk
    Whitehall Parkette5 min walk

    Schools within 1 km

    • WHITNEY JR PUBLIC SCHOOL English Public 3 min walk
    • OUR LADY OF PERPETUAL HELP CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
    • GRADALE ACADEMY ELEMENTARY SCHOOL Private 10 min walk
    • ROSEDALE JR PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureRosedale-Moore ParkMedian neighbourhood
    Median household income (2020)$122,000$84,500
    Households that own their home58%54%
    Population (2021)20,08016,813
    Homes built in 1960 or before46%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleRosedale-Moore ParkCity median
    Assault1080.4636.3
    Robbery86.869.5
    Auto theft199.6192.6
    Theft over $5,00065.146.1
    Break and enter455.6172.8
    Theft from vehicles182.2188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.