HousePrecheckCheck an address

1500 Weston RdToronto · zoning, lot size and permit records

Also 10 Sidney Belsey Cres, 12 Sidney Belsey Cres, 14 Sidney Belsey Cres, 1502 Weston Rd, 1504 Weston Rd and 14 more

Residential multiple · RM (f12.0; u4; d0.8) (x252)≈ 51.1 × 70.3 m2,398 m²on Sidney Belsey Crescorner, also on Weston Rd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 09 162695 (Proposed construction of a new (3) storey townhouse block (Building A) consisting of (6..., 2010, status Inspection); 09 162739 (Proposed construction of a new (2) and (3) storey townhouse block (Building C) consisti..., 2009, status Inspection); 09 162724 (Proposed construction of a new (2) and (3) storey townhouse block (Building B) consisti..., 2009, status Inspection); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 51.1 m frontage≈ 70.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 09 162695 (Proposed construction of a new (3) storey townhouse block (Building A) consisting of (6..., 2010, status Inspection); 09 162739 (Proposed construction of a new (2) and (3) storey townhouse block (Building C) consisti..., 2009, status Inspection); 09 162724 (Proposed construction of a new (2) and (3) storey townhouse block (Building B) consisti..., 2009, status Inspection); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit09 162695Inspectionnew building, new house

    Proposed construction of a new (3) storey townhouse block (Building A) consisting of (6) dwelling units.

    Jul 7, 2010 · 1500 WESTON RD
  • Building permit09 162739Inspectionnew building, new house

    Proposed construction of a new (2) and (3) storey townhouse block (Building C) consisting of (8) single family dwelling units.

    Dec 1, 2009 · 1500 WESTON RD
  • Building permit09 162724Inspectionnew building, new house

    Proposed construction of a new (2) and (3) storey townhouse block (Building B) consisting of (6) dwelling units.

    Dec 1, 2009 · 1500 WESTON RD
  • Building permit09 166323Inspection

    Site servicing (Storm, sanitary sewers and water service.) for townhouse complex for building A-09-162695, building B-09-162724 and building C-09162739

    Sep 28, 2009 · 1500 WESTON RD
  • Zoning review08 219508 PSPClosed
    Nov 6, 2008 · 1500 WESTON RD
  • Zoning review06 163165 PSPClosed
    Aug 2, 2006 · 1500 WESTON RD
  • Zoning review06 113688 PSPClosed
    Mar 2, 2006 · 1500 WESTON RD
  • Zoning review05 170474 PLOClosed
    Aug 12, 2005 · 1500 WESTON RD

Check before you build

  • Site-specific exception 900.6.10(252)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(252)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum lot frontage is 8.0 metres for a detached house .

  2. Older by-law A

    On the lands municipally known in the year 2009 as 1500 Weston Road, City of Toronto By-law 1268-2009(OMB)

2 parts for other addresses
  • B On the lands municipally known as 601, 603 and 605 Oakwood Avenue, City of Toronto By-law 593-2008.
  • C On 441 Jane Street, City of Toronto by-law 106-2015.
By-law 569-2013, Chapter 900

Lot facts

Area
2,398 m²
Frontage
51.1 mestimated, irregular lot
Depth
70.3 mestimated, irregular lot
Street
Sidney Belsey Cres
Corner lot
Yes, also on Weston Rd70.3 m along it
Public lane
None
Max height
11 m
Max lot coverage
—
  • Mount Dennis Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Minimum frontage 12 m. Frontage is about 51.1 m (estimated, irregular lot): meets the zone minimum. Source
  • Zone RM (f12.0; u4; d0.8) (x252) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: maple, freeman autumn blaze (18 cm), maple, freeman armstrong (13 cm), maple, freeman autumn blaze (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
86%6 of 7 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
2

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a third storey addition above the existing two-storey mixed use building. A total of two dwelling units and one commercial space is proposed. A laneway suite is proposed at the rear of the property.

    1254 JANE ST · Jul 30, 2026 · 439 m away
  • Minor varianceApproved

    To construct a new detached garage in the rear yard.

    10 EMMETT AVE · Jul 24, 2025 · 480 m away
  • Minor varianceRefused

    To construct a new detached dwelling with an attached garage.

    5 VERONA AVE · Jun 12, 2025 · 495 m away
  • Minor varianceRefused

    To construct a new detached dwelling with an attached garage.

    5 VERONA AVE · Jun 12, 2025 · 495 m away
  • Minor varianceApproved

    To maintain the existing dwelling.

    55 BUTTONWOOD AVE · Oct 10, 2024 · 417 m away

Latest activity nearby

  • Building permit

    Proposed Alternative Solution to address provision of 38 MM hose connections in lieu of hose stations.

    1552 WESTON RD · Aug 13, 2026 · 142 m away
  • Building permit

    proposal to demolish existing storage shed at rear of house

    85 CLOUSTON AVE · Aug 5, 2026 · 285 m away
  • Building permitmultiplex

    Proposed 2 storey addition, conversion from single family dwelling to detached 4 unit houseplex.

    1 A LIPPINCOTT ST W · Jun 11, 2026 · 263 m away
  • Building permit

    Install backwater valve on sanitary line

    21 EDMUND AVE · Jun 9, 2026 · 162 m away
  • Zoning review

    Closed

    1573 WESTON RD · Jun 2, 2026 · 206 m away
  • Zoning review

    Notice Sent

    1400 WESTON RD · Feb 6, 2026 · 123 m away
  • Building permit

    HVAC - Proposed rear addition to existing house with new rear deck and garage cutback to accomodate addition

    85 CLOUSTON AVE · Dec 15, 2025 · 285 m away
  • Consent (lot split)Approved

    To obtain consent sent to sever the property into 2 lots and to create various easements/ rights-of-ways.

    1552 WESTON RD · Dec 4, 2025 · 142 m away
  • Minor varianceApproved

    To construct an eight-storey residential building.

    1552 WESTON RD · Dec 4, 2025 · 142 m away
  • Minor varianceApproved

    To maintain the existing residential building.

    1552 WESTON RD · Dec 4, 2025 · 142 m away

Neighbourhood: Mount Dennis

About the area around the lot, not the lot itself.

Nearest station
Weston GO Station19 min walk
Nearest TTC stop
Weston Rd at Sidney Belsey Cres1 min walk
Nearest cycling route
Sam Frustaglio DrSharrows, 7 min walk
Nearest traffic count
11,980 vehicles in 14 hWeston Rd / Sidney Belsey Cres, 60 m away, Jan 22, 2026
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Portage Gardens Park4 min walk
Denison Park8 min walk
Canadian Ukrainian Memorial Park8 min walk

Schools within 1 km

  • PORTAGE TRAIL COMMUNITYSCHOOL English Public 6 min walk
  • YORK HUMBER HIGH SCHOOL English Public 9 min walk
  • BALA AVENUE COMMUNITY SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount DennisMedian neighbourhood
Median household income (2020)$70,500$84,500
Households that own their home48%54%
Population (2021)13,05516,813
Homes built in 1960 or before30%29%
Homes needing major repairs10%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount DennisCity median
Assault562.1636.3
Robbery83.369.5
Homicide6.95.3
Shootings13.910.5
Auto theft152.7192.6
Theft over $5,00013.946.1
Break and enter124.9172.8
Theft from vehicles180.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.