HousePrecheckCheck an address

1500 Keele StToronto · zoning, lot size and permit records

≈ 119.2 × 95.2 m7,492 m²on Keele St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 11 storeys, 132 rental units, built 1996More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 10 313880 (Proposal to replace existing fire panel on ground floor of an apartment building, 2011, status Inspection); 09 135663 (To install one backflow prevention device. Revision: From 2 backflow prevention devices..., 2009, status Revision Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 119.2 m frontage≈ 95.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 10 313880 (Proposal to replace existing fire panel on ground floor of an apartment building, 2011, status Inspection); 09 135663 (To install one backflow prevention device. Revision: From 2 backflow prevention devices..., 2009, status Revision Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 8 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 265075 PRS 00 IR (Property Standards, 2026); 26 197757 HEA 00 IR (Adequate Heat, 2026); 26 195065 PRS 00 IR (Property Standards, 2026); and 5 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (11 storeys, 132 units, built 1996).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 265075 PRS 00 IRClosed

    Property Standards

    Nov 4, 2026 · 1500 KEELE ST
  • By-law investigation26 197757 HEA 00 IRClosed

    Adequate Heat

    Jul 7, 2026 · 1500 KEELE ST
  • By-law investigation26 195065 PRS 00 IRClosed

    Property Standards

    Jul 2, 2026 · 1500 KEELE ST
  • By-law investigation25 218076 PRS 00 IRClosed

    Property Standards

    Aug 29, 2025 · 1500 KEELE ST
  • By-law investigation25 137720 PRS 00 IRClosed

    Property Standards

    Apr 1, 2025 · 1500 KEELE ST
  • By-law investigation25 121406 PRS 00 IRClosed

    Property Standards

    Feb 25, 2025 · 1500 KEELE ST
  • By-law investigation25 115487 PRS 00 IRClosed

    Property Standards

    Feb 11, 2025 · 1500 KEELE ST
  • By-law investigation24 254192 PRS 00 IRClosed

    Property Standards

    Dec 28, 2024 · 1500 KEELE ST
Show 2 older records
  • Building permit10 313880Inspection

    Proposal to replace existing fire panel on ground floor of an apartment building.

    Feb 14, 2011 · 1500 KEELE ST
  • Building permit09 135663Revision Issued

    To install one backflow prevention device. Revision: From 2 backflow prevention devices to 1

    Oct 9, 2009 · 1500 KEELE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
7,492 m²
Frontage
119.2 mestimated, irregular lot
Depth
95.2 mestimated, irregular lot
Street
Keele St
Corner lot
No
Public lane
None
House footprint
1,685 m²roof up to 41 m
Back yard
30 mhouse to rear lot line
Side yards
1.7 m and 42.9 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    89%8 of 9 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    2
    Development applications
    5

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new detached dwelling with an attached garage.

      84 KERSDALE AVE · Oct 22, 2026 · 499 m away
    • Minor varianceApproved

      To construct a new detached garage in the rear yard.

      19 GILPIN AVE · Jul 16, 2026 · 325 m away
    • Minor varianceApproved

      To convert a portion of the existing parking spaces into 2 new accessible parking spaces and to construct a new accessible entrance.

      600-604 ROGERS RD · Apr 23, 2026 · 282 m away
    • Minor varianceApproved

      To legalize and to maintain a second and third storey addition above the existing dwelling and the conversion into a duplex dwelling. This application is being considered as a new duplex dwelling.

      39 SENECA AVE · Oct 9, 2025 · 442 m away
    • Minor varianceApproved

      To construct a second storey addition above the existing dwelling. The altered dwelling will be a fourplex.

      571 ROGERS RD · Aug 28, 2025 · 260 m away

    Latest activity nearby

    • Building permit

      Proposed Fire Alarm Panel replacement.

      48 REGENT ST · Nov 26, 2026 · 203 m away
    • Building permit

      Proposed retrofit project includes renovating approximately 755m2 of existing interior shared spaces at the P1 and Ground Floor levels. The project also includes accessibility upgrades, improving the common-use areas and exterior circulation for improved barrier-free accessibility. Exterior revitalization along Rogers Rd with new stairs and ramp. Removal and replacement of existing hardscaping to allow for the replacement of waterproofing at the rear terrace and Rogers Rd. colonnade. The rear terrace will be refreshed with new planters, canopy, and shelter.

      600-604 ROGERS RD · Sep 11, 2026 · 281 m away
    • Building permit

      Proposal for new retaining wall.

      1545 KEELE ST · Sep 10, 2026 · 160 m away
    • Building permit

      Proposal for fire pump replacement

      600 ROGERS RD · Aug 6, 2026 · 282 m away
    • Building permit

      Proposed underpinning and interior alterations

      433 MAYBANK AVE · Jun 10, 2026 · 284 m away
    • Minor varianceApproved

      To convert a portion of the existing parking spaces into 2 new accessible parking spaces and to construct a new accessible entrance.

      600-604 ROGERS RD · Apr 23, 2026 · 282 m away
    • Building permit

      Proposal to construct a second floor rooftop deck on northwest and southwest corners of building,

      346 WESTON RD · Apr 22, 2026 · 252 m away
    • Zoning review

      Notice Sent

      567 ROGERS RD · Mar 12, 2026 · 269 m away
    • Building permitmultiplex

      PROPOSED SECOND FLOOR ADDITION AND CONVERT SINGLE FAMILY DWELLING TO 4 UNITS INTERIOR ALTERATIONS (50 SQM.)

      571 ROGERS RD · Feb 6, 2026 · 260 m away
    • Building permit

      Proposal to construct a second floor rooftop deck on northwest and southwest corners of building,

      340-342 WESTON RD · Jan 23, 2026 · 251 m away

    Neighbourhood: Keelesdale-Eglinton West

    About the area around the lot, not the lot itself.

    Nearest station
    Keelesdale Station20 min walk
    Nearest TTC stop
    Weston Rd at Northland Ave3 min walk
    Nearest cycling route
    Rogers RdBike Lane, 7 min walk
    Nearest traffic count
    16,934 vehicles in 8 hWeston Rd / Northland Ave, 200 m away, Apr 22, 2015
    Serious collisions within 500 m
    72021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 1 with cyclists
    Parks
    Regent Park - Etobicoke5 min walk
    Turnberry North Park6 min walk
    Harwood Park8 min walk

    Schools within 1 km

    • ST MATTHEW CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
    • SANTA MARIA CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
    • YORK MEMORIAL COLLEGIATE INSTITUTE English Public 9 min walk
    • GENERAL MERCER JR PUBLIC SCHOOL English Public 10 min walk
    • HARWOOD PUBLIC SCHOOL English Public 11 min walk
    • ST OSCAR ROMERO CATHOLIC SECONDARY SCHOOL English Separate 12 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureKeelesdale-Eglinton WestMedian neighbourhood
    Median household income (2020)$77,000$84,500
    Households that own their home59%54%
    Population (2021)11,39016,813
    Homes built in 1960 or before43%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleKeelesdale-Eglinton WestCity median
    Assault418.3636.3
    Robbery7169.5
    Shootings23.710.5
    Auto theft189.4192.6
    Theft over $5,00023.746.1
    Break and enter110.5172.8
    Theft from vehicles236.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 29, 2026, published Nov 27, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
    • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
    • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
    • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
    • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
    • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
    • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
    • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
    • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.