HousePrecheckCheck an address

1500 Bathurst StToronto · zoning, lot size and permit records

Residential apartment · RA (x533)60.0 × 36.2 m2,164 m²on Bathurst Stbacks onto Ln W Bathurst N St Clair

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 14 storeys, 119 rental units, built 1965More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 114428 (Commercial unit at ground level to be renovated for new nail salon, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 16 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • 1 open by-law investigation at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 179880 ZON 00 IR (Zoning, 2026, status Rescheduled).
  • City upkeep score: 97 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: St Clair WestThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
60.0 m frontage36.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 open by-law investigation

    Needs a closer look

    Not resolved in the City's records: 26 179880 ZON 00 IR (Zoning, 2026, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 building permits open, the oldest since 2019

    Needs a closer look

    Still open in the City's records: 20 190902 (Proposal to install temporary heat detectors in parking garage levels to provide detect..., 2020, status Permit Issued); 19 169892 (Proposal for balcony repairs with railing replacement in existing apartment building, 2019, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 172448 000 00 IR (Adequate Heat, 2026); 26 172447 000 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 114428 (Commercial unit at ground level to be renovated for new nail salon, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0641/26TEY (To alter the existing 13-storey detached mixed-use building by converting the existing..., 2026).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 97 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (14 storeys, 119 units, built 1965).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

23 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 114428Permit Issued

    Commercial unit at ground level to be renovated for new nail salon.

    Nov 19, 2026 · 1500 BATHURST ST
  • Minor varianceA0641/26TEYApproved

    To alter the existing 13-storey detached mixed-use building by converting the existing six non-residential units on the ground level into nine non-residential units. The building will contain a total of 120 rental residential dwelling units and nine non-residential units.

    Oct 21, 2026 · 1500 BATHURST ST
  • By-law investigation26 179880 ZON 00 IRRescheduled

    Zoning

    Jun 8, 2026 · 1500 BATHURST ST
  • By-law investigation26 172448 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 1500 BATHURST ST
  • By-law investigation26 172447 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 1500 BATHURST ST
  • Zoning review26 144670 LTOClosed
    Apr 16, 2026 · 1500 BATHURST ST
  • Zoning review25 128350 ZZUClosed
    Mar 13, 2025 · 1500 BATHURST ST
  • Building permit22 188525Closed

    Proposal for localized concrete repairs.

    Sep 28, 2022 · 1500 BATHURST ST
Show 15 older records
  • Building permit20 190902Permit Issued

    Proposal to install temporary heat detectors in parking garage levels to provide detection while the sprinkler system is being replaced.

    Nov 17, 2020 · 1500 BATHURST ST
  • Building permit20 136721Closed

    HVAC - Proposal for interior alterations to existing salon.wrong number 416 274 3334

    May 19, 2020 · 1500 BATHURST ST
  • Building permit19 220316Closed

    Proposal for interior alterations to office space in unit 7 of the Existing Apartment Building (mixed use). Scope of work includes removing one of three work rooms in the unit to enlarge the remaining two work rooms.

    Sep 24, 2019 · 1500 BATHURST ST
  • Building permit19 169892Permit Issued

    Proposal for balcony repairs with railing replacement in existing apartment building.

    Jul 9, 2019 · 1500 BATHURST ST
  • Zoning review19 157113 LPRClosed
    May 21, 2019 · 1500 BATHURST ST
  • Building permit15 135415Closed

    Install a 3 inch backflow preventor

    Apr 29, 2015 · 1500 BATHURST ST
  • Development application15 125200 STE 21 OZClosed

    St Clair Ave W and Bathurst Street Area Planning Framework Study - On January 30, 2019 City Council requested the Chief Planner and Executive Director, City Planning, to modify the Official Plan Policy review for the Raglan Avenue/Vaughan Road area (initiated in a staff report dated May 27, 2015 and adopted by City Council on July 27, 2015), by expanding the study boundary and focusing on built form, land use, and community services.

    Mar 9, 2015 · 1500 BATHURST ST
  • Building permit14 181422Closed

    HVAC - Proposal for interior alterations to Unit 6, "Centric Health", a new demising wall will be installed to create a new unit, that tenant will come in for a fit-out permit, conveinece address 1500 Bathurst St

    Jul 24, 2014 · 1500 BATHURST ST
  • Zoning review13 272124 LTOClosed
    Nov 29, 2013 · 1500 BATHURST ST
  • Zoning review05 106925 LTOClosed
    Feb 7, 2005 · 1500 BATHURST ST
  • Zoning review04 172818 LTOClosed
    Sep 10, 2004 · 1500 BATHURST ST
  • Zoning review04 124277 ZSVClosed
    Apr 13, 2004 · 1500 BATHURST ST
  • Building permit04 103176Closed

    Erect canopy approximately 17.5' x 2' x 2'. W-11 on elevation.

    Jan 16, 2004 · 1500 BATHURST ST
  • Building permit03 143881Closed - Dormant

    an addition to front of mixed use bldg

    Jul 7, 2003 · 1500 BATHURST ST
  • Zoning review03 117592 ZPRClosed
    Mar 25, 2003 · 1500 BATHURST ST

Check before you build

  • Site-specific exception 900.7.10(533)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(533)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    On 1490-1506 Bathurst St., Section 16(153) of the former City of York zoning by-law 1-83.

By-law 569-2013, Chapter 900

Lot facts

Area
2,164 m²
Frontage
60 m
Depth
36.2 m
Street
Bathurst St
Corner lot
No
Public lane
Ln W Bathurst N St Clair, 59.7 m along it
House footprint
1,551 m²roof up to 45 m
Back yard
0 mhouse to rear lot line
Side yards
0.3 m and 0.3 mhouse to side lot lines
Buildings on the lot
5house, garage, sheds
Max height
24 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: St Clair West. The lot is inside the St Clair West Major Transit Station Area approved by the Province (Site and Area Specific Policy 717). Source
  • Zone RA (x533) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
88%38 of 43 decisions
Garden suite permits
0
Laneway suite permits
3
Multiplex permits
4
Development applications
27

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 43 variance decisions: more than at 78% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 13-storey detached mixed-use building by converting the existing six non-residential units on the ground level into nine non-residential units. The building will contain a total of 120 rental residential dwelling units and nine non-residential units.

    1500 BATHURST ST · Oct 21, 2026 · 9 m away
  • Minor varianceRefused

    To alter the development standards (as approved by site-specific Zoning By-law No. 531-2024(OLT)) for the 28-storey mixed-use building to increase the building height to 34 storeys, increase the gross floor area and modify building setbacks. There will be a total of 236 residential dwelling units on this lot. This is currently under the review of Site Plan Control (File No. 21 232984 STE 12 SA).

    5 RAGLAN AVE · Aug 27, 2025 · 77 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1050-2022), for a new 30-storey mixed-use building, by increasing building height, non-residential and residential gross floor areas, and decreasing outdoor amenity space, Site Plan Control Application File 20 21 213475 STE 12 SA, which is currently under review. There will be a total of 305 residential dwelling units on this lot.

    91 RAGLAN AVE · Jul 9, 2025 · 213 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 1051-2022 and 1052-2022) for a 36-storey mixed-use building (including a mechanical penthouse), to permit indoor amenity space on the rooftop. There will be a total of 352 residential dwelling units (of which 62 units will be rental replacement units) on this lot. Committee of Adjustment considered and approved variances to the Zoning By-law under Minor Variance Decision A0686/24TEY, however the construction alterations necessitates further minor variances.

    40 RAGLAN AVE · Jun 11, 2025 · 103 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 1051-2022 and 1052-2022) for a 36-storey mixed-use building, including a mechanical penthouse. There will be a total of 352 residential dwelling units (of which 62 units will be rental replacement units) on this lot.

    40 RAGLAN AVE · Feb 19, 2025 · 103 m away

Latest activity nearby

  • Building permit

    Commercial unit at ground level to be renovated for new nail salon.

    1500 BATHURST ST · Nov 19, 2026 · 9 m away
  • Zoning review

    Not Started

    64 VAUGHAN RD · Nov 9, 2026 · 199 m away
  • Building permit

    Geothermal energy well drilling for the 30 storey rental building to be constructed on the lands of 91-101 Raglan Ave

    91 RAGLAN AVE · Oct 27, 2026 · 213 m away
  • Building permit

    Proposal to construct a temporary air supported structure (dome) in the same location from December 7th 2026 and dismantiled on March 15th, 2027.

    1515 BATHURST ST · Oct 26, 2026 · 128 m away
  • Minor varianceApproved

    To alter the existing 13-storey detached mixed-use building by converting the existing six non-residential units on the ground level into nine non-residential units. The building will contain a total of 120 rental residential dwelling units and nine non-residential units.

    1500 BATHURST ST · Oct 21, 2026 · 9 m away
  • Building permitnew building

    Proposal for 30 storey residential development with 4 levels of below grade parking. Total of 290 residential dwelling units with small retail frontage along Raglan AveReference: 21 213475 STE 12 SA

    91 RAGLAN AVE · Oct 14, 2026 · 213 m away
  • Building permit

    Proposal for a sprinkler retrofit

    1431 BATHURST ST · Oct 7, 2026 · 262 m away
  • Zoning review

    Closed

    44 VAUGHAN RD · Oct 6, 2026 · 212 m away
  • Zoning review

    Closed

    1486 BATHURST ST · Sep 25, 2026 · 46 m away
  • Zoning review

    Closed

    64 VAUGHAN RD · Sep 23, 2026 · 199 m away

Neighbourhood: Humewood-Cedarvale

About the area around the lot, not the lot itself.

Nearest station
St Clair West Station5 min walk
Nearest TTC stop
Bathurst St at Tichester Rd South Side2 min walk
Nearest cycling route
Vaughan RdBike Lane, 3 min walk
Nearest traffic count
14,365 vehicles in 8 hBathurst St / Albert Wiggan Lane, 80 m away, Mar 9, 2017
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 3 with pedestrians, 0 with cyclists
Parks
Tichester Park2 min walk
Wells Hill Park3 min walk
Cedarvale Ravine5 min walk

Schools within 1 km

  • ST MICHAEL'S COLLEGE SCHOOL Private 2 min walk
  • HOLY ROSARY CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • HILLCREST COMMUNITY SCHOOL English Public 10 min walk
  • FOREST HILL TUTORING Private 12 min walk
  • HUMEWOOD COMMUNITY SCHOOL English Public 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumewood-CedarvaleMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home37%54%
Population (2021)13,84516,813
Homes built in 1960 or before60%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumewood-CedarvaleCity median
Assault471.6636.3
Robbery42.369.5
Shootings12.110.5
Auto theft133192.6
Theft over $5,00018.146.1
Break and enter211.6172.8
Theft from vehicles108.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.