HousePrecheckCheck an address

150 Sherbourne StToronto · zoning, lot size and permit records

Also 138 Sherbourne St, 140 Sherbourne St

Open space · OR170.8 × 204.6 m34,597 m²on Sherbourne Stcorner, also on Queen St E

Not a home

Moss Park

The City of Toronto's real estate inventory lists Moss Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 24 252276 (REV: This is a permit application for an amended STS Permit for the Moss Park construct..., 2026); 25 164843 (Proposed addition to existing arena to be used as refrigeration room, 2026); 25 193572 (Proposal for Alternative Solution related to Station Emergency Power - ADS 34, 2025); and 9 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 12 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Moss ParkThe City plans more homes around the station: good for transit, and more building over time.
N50 m
170.8 m frontage204.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 4 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 24 191459 (The Ontario Line is a 15.6-kilometre stand-alone rapid transit ine that will connect th..., 2024, status Deficiency Notice Issued); 24 191453 (The public areas of Moss Park station entrance have a glazed facade which is provided f..., 2024, status Deficiency Notice Issued); 24 150655 (Unsprinklered Escalator Truss, 2024, status Deficiency Notice Issued); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 252276 (REV: This is a permit application for an amended STS Permit for the Moss Park construct..., 2026); 25 164843 (Proposed addition to existing arena to be used as refrigeration room, 2026); 25 193572 (Proposal for Alternative Solution related to Station Emergency Power - ADS 34, 2025); and 9 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0542/24TEY (To construct a new four-storey detached building (community recreation centre), 2024).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

27 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit24 252276Revision Issued

    REV: This is a permit application for an amended STS Permit for the Moss Park construction site. Toronto Water is no longer allowing temporary water supply from hydrants therefore this application is to tie into the street water main.Proposal for Temporary Site Services for the Moss Park construction site.

    Jul 9, 2026 · 138 SHERBOURNE ST
  • Building permit25 164843Permit Issued

    Proposed addition to existing arena to be used as refrigeration room

    Feb 23, 2026 · 140 SHERBOURNE ST
  • Building permit25 193572Deficiency Notice Issued

    Proposal for Alternative Solution related to Station Emergency Power - ADS 34

    Jul 14, 2025 · 150 SHERBOURNE ST
  • Building permit25 193564Deficiency Notice Issued

    Alternative Design Solution - ADS 33 Related to Station Emergency Power

    Jul 14, 2025 · 150 SHERBOURNE ST
  • Building permit25 135977Inspectionnew building

    Proposal for Temporary Site Office

    May 26, 2025 · 150 SHERBOURNE ST
  • Building permit23 169794Cancelled

    Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station

    Feb 12, 2025 · 150 SHERBOURNE ST
  • Building permit25 104391Deficiency Notice Issued

    Elevator shaft resistance rating - Moss Park Station

    Jan 14, 2025 · 150 SHERBOURNE ST
  • Building permit24 253185Under Review

    Alternative Solution for Several mitigating features are proposed to meet the Functional and Objective Statements of the OBC associated with noncombustible construction and fire access. The mitigating features will provide a performance level equal to or greater than that required by the acceptable solution in the OBC.

    Dec 23, 2024 · 150 SHERBOURNE ST
Show 19 older records
  • Building permit24 253169Response Receivednew building

    Proposed is a 4 storey, 80,000 sf City of Toronto Community Centre to replace the existing John Innes facility.

    Dec 23, 2024 · 150 SHERBOURNE ST
  • Building permit24 249032Deficiency Notice Issued

    Alternative Solution Application for Moss Park Station (FMS) Emergency Power

    Dec 10, 2024 · 150 SHERBOURNE ST
  • Minor varianceA0542/24TEYApproved

    To construct a new four-storey detached building (community recreation centre).

    Aug 14, 2024 · 150 SHERBOURNE ST
  • Building permit24 191459Deficiency Notice Issued

    The Ontario Line is a 15.6-kilometre stand-alone rapid transit ine that will connect the Ontario Science Centre to Exhibition/Ontario Place. Fifteen stations are proposed, with numerous connections to the broader transit network, including GO Transit rai services, the Toronto Transit Commission's subway Lines 1 and 2, the future Line 5 (Eglinton Crosstown LRT), as well as numerous bus and streetcar routes.The Ontario Line - Southern Civil, Stations and Tunnel (Project) is part of the Ontario line.Rapid transit stations are governed by OBC Division B, Section 3.13., that has specific provisions for stations. Service rooms in the station are classified as being Group F, Division 3, Low Hazard Industrial Occupancy.The service rooms are required to comply with the egress reqirements under Division B, Part 3 of the OBC. For the purpose of application of the egress requirements to back of house service rooms, the provisions of Article 3.3.1.5. and Article 3.4.2.5. are applied.The proposed design of the back of house service rooms at the station does not comply with the acceptable solutions in OBC.When the proposed design differs from the acceptable solutions of the OBC, compliance is permitted to be achieved by using alternative solutions that will reach the level of performance required by the applicable acceptable solutions, as permitted by OBC division A, Clause 1.2.1.1.(1)(b). OBC provides specific Objective and Functional statements relative to complying with the Sentence 3.13.5.10.(2) of the Code.An alternative solution approach to building code compliance is proposed relative to the 2012 Ontario Building Code for the egress requirements in the rapid transit station.

    Aug 1, 2024 · 150 SHERBOURNE ST
  • Building permit24 191453Deficiency Notice Issued

    The public areas of Moss Park station entrance have a glazed facade which is provided for the full extent of the east and south facade and on a portion of the west and north facades. The glazed facade in public areas of entrance does not provide a fire resistance rating.The available limiting distance for the public area fire compartments on east and north do not permit 100% unprotected openings.When the proposed design differs from the acceptable solutions of the OBC, compliance is permitted to be achieved by using alternative solutions that will reach the level of performance required by the applicable acceptable solutions, as permitted by OBC division A, Clause 1.2.1.1.(1)(b). OBC provides specific Objective and Functional statements relative to complying with the Sentence 3.2.3.1.(1) of the Code.An alternative solution approach to building code compliance is proposed relative to the 2012 Ontario Building Code for the apatial separation and exposure protection requirements in the Moss Park rapid transit station.

    Aug 1, 2024 · 150 SHERBOURNE ST
  • Building permit24 150655Deficiency Notice Issued

    Unsprinklered Escalator Truss

    May 17, 2024 · 150 SHERBOURNE ST
  • Zoning review24 106375 PSPClosed
    Feb 2, 2024 · 150 SHERBOURNE ST
  • Development application24 106375 STE 13 SAUnder Review

    Site Plan Control application for a 7,544.3 square metres City of Toronto community centre to replace the existing John Innes Community Centre.

    Jan 19, 2024 · 150 SHERBOURNE ST · City file
  • Building permit23 201672Closed

    Permit for secant wall/slurry wall in relation to new Moss Park station. No excavation.

    Nov 23, 2023 · 150 SHERBOURNE ST
  • Zoning review23 124235 PSPClosed
    May 26, 2023 · 150 SHERBOURNE ST
  • Development application23 124235 STE 13 SAUnder Review

    Proposed underground transit station for the Ontario Line at Moss Park.

    Mar 17, 2023 · 150 SHERBOURNE ST · City file
  • Building permit23 119798Closed

    Installation of one 20m x 120m and one 30m x 40m clearspan tent, staked. Installation date March 20, 2023 and removal date April 20, 2023. Tent to provide shelter and protection from the elements for an archelological team to complete a dig related to the construction of the Metrolinx Ontario Line.

    Mar 16, 2023 · 150 SHERBOURNE ST
  • Zoning review23 122699 ZAPApplicable Law Pending
    Mar 13, 2023 · 150 SHERBOURNE ST
  • Zoning review21 207550 ZPRClosed
    Sep 2, 2021 · 150 SHERBOURNE ST
  • Zoning review21 176130 ZPRClosed
    Jun 25, 2021 · 150 SHERBOURNE ST
  • Building permit20 131851Application Received
    Apr 11, 2020 · 150 SHERBOURNE ST
  • Zoning review16 234749 ZPRClosed
    Oct 7, 2016 · 150 SHERBOURNE ST
  • Building permit05 104777Inspection

    HVAC - Interior alterations to an existing arena - Interior Alterations

    Mar 2, 2005 · 150 SHERBOURNE ST
  • Building permit98 012605Closed

    MAKE INTERIOR ALTERATIONS. WORK ORDER NO. 1745 /LM

    Jan 21, 1998 · 150 SHERBOURNE ST

Lot facts

Area
34,597 m²
Frontage
170.8 m
Depth
204.6 m
Street
Sherbourne St
Corner lot
Yes, also on Queen St E204.6 m along it
Public lane
None
House footprint
2,390 m²roof up to 14.3 m
Back yard
139.3 mhouse to rear lot line
Side yards
35.5 m and 78.4 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 25 City trees in front of this lot. The City's street tree inventory lists 25 trees at this address: ash, green (75 cm), ash, european (51 cm), ash, european (47 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%23 of 23 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
17
Development applications
27

Within 300 m, last 10 years. 17 suite and multiplex permits: more than at 85% of Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new four-storey detached building (community recreation centre).

    150 SHERBOURNE ST · Aug 14, 2024 · 63 m away

Latest activity nearby

  • Building permit

    1 wall sign**PHARMASAVE**

    213 A QUEEN ST E · Nov 23, 2026 · 130 m away
  • Building permit

    1 wall sign**PHARMASAVE**

    215 QUEEN ST E · Nov 12, 2026 · 132 m away
  • Zoning review

    Not Started

    134 JARVIS ST · Nov 6, 2026 · 242 m away
  • Building permit

    Proposal to install mag lock.

    275 QUEEN ST E · Nov 5, 2026 · 290 m away
  • Building permit

    1 wall sign**PHARMASAVE**

    215 QUEEN ST E · Oct 26, 2026 · 132 m away
  • Zoning review

    Not Started

    207 JARVIS ST · Oct 21, 2026 · 223 m away
  • Building permit

    Proposal to renovate the existing ground floor sprinkler system for Shoppers Drug Mart tenant fit out.

    275 QUEEN ST E · Oct 19, 2026 · 290 m away
  • Building permit

    Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room

    25 MUTUAL ST · Oct 19, 2026 · 278 m away
  • Building permit

    REV01: Proposed revision change of use to include the ground floor and interior alterations to ground floor to create retail spaceProposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes proposed to existing building GFA, height, or setbacks.

    154 SHUTER ST · Oct 15, 2026 · 113 m away
  • Consent (lot split)Approved

    To obtain consent to create a new stratified easement/right-of-way.

    125 GEORGE ST · Oct 14, 2026 · 276 m away

Neighbourhood: Moss Park

About the area around the lot, not the lot itself.

Nearest station
Queen Station12 min walk
Nearest TTC stop
Sherbourne St at Shuter St2 min walk
Nearest cycling route
Shuter StCycle Track, 1 min walk
Nearest traffic count
14,138 vehicles in 14 hSherbourne St / Shuter St / Moss Park Trl, 130 m away, Jun 19, 2024
Serious collisions within 500 m
202021–2026, killed or seriously injured: 2 fatal, 15 with pedestrians, 1 with cyclists
Parks
Moss Park1 min walk
Arena Gardens5 min walk
45 Dalhousie St Park6 min walk

Schools within 1 km

  • ECOLE ELEMENTAIRE GABRIELLE ROY French Public 3 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 8 min walk
  • LIBERTY PREP SCHOOL Private 8 min walk
  • ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 9 min walk
  • ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 9 min walk
  • ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMoss ParkMedian neighbourhood
Median household income (2020)$65,000$84,500
Households that own their home35%54%
Population (2021)21,49016,813
Homes built in 1960 or before17%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMoss ParkCity median
Assault2226.8636.3
Robbery166.669.5
Homicide3.45.3
Shootings3.410.5
Auto theft81.6192.6
Theft over $5,00064.646.1
Break and enter350.2172.8
Theft from vehicles275.4188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.