Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register4 building permits open, the oldest since 2005
Needs a closer lookStill open in the City's records: 24 191459 (The Ontario Line is a 15.6-kilometre stand-alone rapid transit ine that will connect th..., 2024, status Deficiency Notice Issued); 24 191453 (The public areas of Moss Park station entrance have a glazed facade which is provided f..., 2024, status Deficiency Notice Issued); 24 150655 (Unsprinklered Escalator Truss, 2024, status Deficiency Notice Issued); and 1 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 24 252276 (REV: This is a permit application for an amended STS Permit for the Moss Park construct..., 2026); 25 164843 (Proposed addition to existing arena to be used as refrigeration room, 2026); 25 193572 (Proposal for Alternative Solution related to Station Emergency Power - ADS 34, 2025); and 9 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0542/24TEY (To construct a new four-storey detached building (community recreation centre), 2024).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)12 development applications open within 300 m
Good to know12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
27 records on file: more than at 100% of Toronto houses (median 0).
- Building permit24 252276Revision Issued
REV: This is a permit application for an amended STS Permit for the Moss Park construction site. Toronto Water is no longer allowing temporary water supply from hydrants therefore this application is to tie into the street water main.Proposal for Temporary Site Services for the Moss Park construction site.
Jul 9, 2026 · 138 SHERBOURNE ST - Building permit25 164843Permit Issued
Proposed addition to existing arena to be used as refrigeration room
Feb 23, 2026 · 140 SHERBOURNE ST - Building permit25 193572Deficiency Notice Issued
Proposal for Alternative Solution related to Station Emergency Power - ADS 34
Jul 14, 2025 · 150 SHERBOURNE ST - Building permit25 193564Deficiency Notice Issued
Alternative Design Solution - ADS 33 Related to Station Emergency Power
Jul 14, 2025 · 150 SHERBOURNE ST - Building permit25 135977Inspection
Proposal for Temporary Site Office
May 26, 2025 · 150 SHERBOURNE ST - Building permit23 169794Cancelled
Conditional Permit - Part Permit - To construct new Ontario Line South transit - Moss Park Transit Station
Feb 12, 2025 · 150 SHERBOURNE ST - Building permit25 104391Deficiency Notice Issued
Elevator shaft resistance rating - Moss Park Station
Jan 14, 2025 · 150 SHERBOURNE ST - Building permit24 253185Under Review
Alternative Solution for Several mitigating features are proposed to meet the Functional and Objective Statements of the OBC associated with noncombustible construction and fire access. The mitigating features will provide a performance level equal to or greater than that required by the acceptable solution in the OBC.
Dec 23, 2024 · 150 SHERBOURNE ST
Show 19 older records
- Building permit24 253169Response Received
Proposed is a 4 storey, 80,000 sf City of Toronto Community Centre to replace the existing John Innes facility.
Dec 23, 2024 · 150 SHERBOURNE ST - Building permit24 249032Deficiency Notice Issued
Alternative Solution Application for Moss Park Station (FMS) Emergency Power
Dec 10, 2024 · 150 SHERBOURNE ST - Minor varianceA0542/24TEYApproved
To construct a new four-storey detached building (community recreation centre).
Aug 14, 2024 · 150 SHERBOURNE ST - Building permit24 191459Deficiency Notice Issued
The Ontario Line is a 15.6-kilometre stand-alone rapid transit ine that will connect the Ontario Science Centre to Exhibition/Ontario Place. Fifteen stations are proposed, with numerous connections to the broader transit network, including GO Transit rai services, the Toronto Transit Commission's subway Lines 1 and 2, the future Line 5 (Eglinton Crosstown LRT), as well as numerous bus and streetcar routes.The Ontario Line - Southern Civil, Stations and Tunnel (Project) is part of the Ontario line.Rapid transit stations are governed by OBC Division B, Section 3.13., that has specific provisions for stations. Service rooms in the station are classified as being Group F, Division 3, Low Hazard Industrial Occupancy.The service rooms are required to comply with the egress reqirements under Division B, Part 3 of the OBC. For the purpose of application of the egress requirements to back of house service rooms, the provisions of Article 3.3.1.5. and Article 3.4.2.5. are applied.The proposed design of the back of house service rooms at the station does not comply with the acceptable solutions in OBC.When the proposed design differs from the acceptable solutions of the OBC, compliance is permitted to be achieved by using alternative solutions that will reach the level of performance required by the applicable acceptable solutions, as permitted by OBC division A, Clause 1.2.1.1.(1)(b). OBC provides specific Objective and Functional statements relative to complying with the Sentence 3.13.5.10.(2) of the Code.An alternative solution approach to building code compliance is proposed relative to the 2012 Ontario Building Code for the egress requirements in the rapid transit station.
Aug 1, 2024 · 150 SHERBOURNE ST - Building permit24 191453Deficiency Notice Issued
The public areas of Moss Park station entrance have a glazed facade which is provided for the full extent of the east and south facade and on a portion of the west and north facades. The glazed facade in public areas of entrance does not provide a fire resistance rating.The available limiting distance for the public area fire compartments on east and north do not permit 100% unprotected openings.When the proposed design differs from the acceptable solutions of the OBC, compliance is permitted to be achieved by using alternative solutions that will reach the level of performance required by the applicable acceptable solutions, as permitted by OBC division A, Clause 1.2.1.1.(1)(b). OBC provides specific Objective and Functional statements relative to complying with the Sentence 3.2.3.1.(1) of the Code.An alternative solution approach to building code compliance is proposed relative to the 2012 Ontario Building Code for the apatial separation and exposure protection requirements in the Moss Park rapid transit station.
Aug 1, 2024 · 150 SHERBOURNE ST - Building permit24 150655Deficiency Notice Issued
Unsprinklered Escalator Truss
May 17, 2024 · 150 SHERBOURNE ST - Zoning review24 106375 PSPClosedFeb 2, 2024 · 150 SHERBOURNE ST
- Development application24 106375 STE 13 SAUnder Review
Site Plan Control application for a 7,544.3 square metres City of Toronto community centre to replace the existing John Innes Community Centre.
Jan 19, 2024 · 150 SHERBOURNE ST · City file - Building permit23 201672Closed
Permit for secant wall/slurry wall in relation to new Moss Park station. No excavation.
Nov 23, 2023 · 150 SHERBOURNE ST - Zoning review23 124235 PSPClosedMay 26, 2023 · 150 SHERBOURNE ST
- Development application23 124235 STE 13 SAUnder Review
Proposed underground transit station for the Ontario Line at Moss Park.
Mar 17, 2023 · 150 SHERBOURNE ST · City file - Building permit23 119798Closed
Installation of one 20m x 120m and one 30m x 40m clearspan tent, staked. Installation date March 20, 2023 and removal date April 20, 2023. Tent to provide shelter and protection from the elements for an archelological team to complete a dig related to the construction of the Metrolinx Ontario Line.
Mar 16, 2023 · 150 SHERBOURNE ST - Zoning review23 122699 ZAPApplicable Law PendingMar 13, 2023 · 150 SHERBOURNE ST
- Zoning review21 207550 ZPRClosedSep 2, 2021 · 150 SHERBOURNE ST
- Zoning review21 176130 ZPRClosedJun 25, 2021 · 150 SHERBOURNE ST
- Building permit20 131851Application ReceivedApr 11, 2020 · 150 SHERBOURNE ST
- Zoning review16 234749 ZPRClosedOct 7, 2016 · 150 SHERBOURNE ST
- Building permit05 104777Inspection
HVAC - Interior alterations to an existing arena - Interior Alterations
Mar 2, 2005 · 150 SHERBOURNE ST - Building permit98 012605Closed
MAKE INTERIOR ALTERATIONS. WORK ORDER NO. 1745 /LM
Jan 21, 1998 · 150 SHERBOURNE ST
Lot facts
- Area
- 34,597 m²
- Frontage
- 170.8 m
- Depth
- 204.6 m
- Street
- Sherbourne St
- Corner lot
- Yes, also on Queen St E204.6 m along it
- Public lane
- None
- House footprint
- 2,390 m²roof up to 14.3 m
- Back yard
- 139.3 mhouse to rear lot line
- Side yards
- 35.5 m and 78.4 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- 12 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Moss Park. The lot is inside the Moss Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 763). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
- 25 City trees in front of this lot. The City's street tree inventory lists 25 trees at this address: ash, green (75 cm), ash, european (51 cm), ash, european (47 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%23 of 23 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 17
- Development applications
- 27
Within 300 m, last 10 years. 17 suite and multiplex permits: more than at 85% of Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct a new four-storey detached building (community recreation centre).
150 SHERBOURNE ST · Aug 14, 2024 · 63 m away
Latest activity nearby
- Building permit
1 wall sign**PHARMASAVE**
213 A QUEEN ST E · Nov 23, 2026 · 130 m away - Building permit
1 wall sign**PHARMASAVE**
215 QUEEN ST E · Nov 12, 2026 · 132 m away - Zoning review
Not Started
134 JARVIS ST · Nov 6, 2026 · 242 m away - Building permit
Proposal to install mag lock.
275 QUEEN ST E · Nov 5, 2026 · 290 m away - Building permit
1 wall sign**PHARMASAVE**
215 QUEEN ST E · Oct 26, 2026 · 132 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 223 m away - Building permit
Proposal to renovate the existing ground floor sprinkler system for Shoppers Drug Mart tenant fit out.
275 QUEEN ST E · Oct 19, 2026 · 290 m away - Building permit
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
25 MUTUAL ST · Oct 19, 2026 · 278 m away - Building permit
REV01: Proposed revision change of use to include the ground floor and interior alterations to ground floor to create retail spaceProposal for interior alternations to residential unit at first floor. Existing residential units at second and third floor to remain with new exterior stair proposed to facilitate code-compliant egress. No changes proposed to existing building GFA, height, or setbacks.
154 SHUTER ST · Oct 15, 2026 · 113 m away - Consent (lot split)Approved
To obtain consent to create a new stratified easement/right-of-way.
125 GEORGE ST · Oct 14, 2026 · 276 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station12 min walk
- Nearest TTC stop
- Sherbourne St at Shuter St2 min walk
- Nearest cycling route
- Shuter StCycle Track, 1 min walk
- Nearest traffic count
- 14,138 vehicles in 14 hSherbourne St / Shuter St / Moss Park Trl, 130 m away, Jun 19, 2024
- Serious collisions within 500 m
- 202021–2026, killed or seriously injured: 2 fatal, 15 with pedestrians, 1 with cyclists
- Parks
- Moss Park1 min walk
- Arena Gardens5 min walk
- 45 Dalhousie St Park6 min walk
Schools within 1 km
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 3 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 8 min walk
- LIBERTY PREP SCHOOL Private 8 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 9 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 9 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 9 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.