HousePrecheckCheck an address

150 Rosedale Valley RdToronto · zoning, lot size and permit records

Open space · ON≈ 31.0 × 85.3 m1,569 m²on Park Rdcorner, also on Rosedale Valley Rd

Not a home

Rosedale Ravine Lands - Prop F

The City of Toronto's real estate inventory lists Rosedale Ravine Lands - Prop F here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 3 development applications open within 300 m, up to 31 storeysNew buildings may go up around here in the next years. More change nearby than at 93% of Toronto houses.
  • Major Transit Station Area: RosedaleThe City plans more homes around the station: good for transit, and more building over time.
N20 m
≈ 31.0 m frontage≈ 85.3 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 31 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
1,569 m²
Frontage
31 mestimated, irregular lot
Depth
85.3 mestimated, irregular lot
Street
Park Rd
Corner lot
Yes, also on Rosedale Valley Rd85.3 m along it
Public lane
None
Max height
—
Max lot coverage
—
  • Major Transit Station Area: Rosedale. The lot is inside the Rosedale Major Transit Station Area approved by the Province (Site and Area Specific Policy 719). Source
  • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: honey locust (43 cm), maple, norway (33 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%11 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
8

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal of removal and decommissioning of existing 38 mm fire hoses from fire hose cabinets throughout the building in accordance with the Ontario Fire Code. Existing fire hose cabinets and standpipe systems are to remain in service. Work includesobtaining authority approval, hose removal, final inspection, and engineering sign-off.Proposal of

    200 BLOOR ST E · Nov 25, 2026 · 213 m away
  • Zoning review

    Not Started

    4 MEREDITH CRES · Nov 23, 2026 · 279 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies.

    40 ASQUITH AVE · Nov 20, 2026 · 221 m away
  • Building permit

    Proposal to install one (1) maglock.

    717 CHURCH ST · Nov 6, 2026 · 185 m away
  • Building permitsecondary suite

    Proposed interior alterations to create a second suite.HERITAGE REQUIRED

    123 COLLIER ST · Oct 30, 2026 · 147 m away
  • Building permit

    REVISION - UPGRADE EXISTING SPRINKLER SYSTEM BASED ON NEW LAYOUTProposed interior renovation to the existing finance and human resources staff work areas in the lower level of the library.

    789 YONGE ST · Sep 1, 2026 · 288 m away
  • Building permit

    Proposal for Fire Protection modifications.

    120 ROSEDALE VALLEY RD · Aug 27, 2026 · 179 m away
  • Building permit

    The proposed alternative solution is in lieu of protecting standpipe risers by locating them in exit stair shafts or service space separated from the adjacent floor area by a fire separation having a fire-resistance rating of 1-hour per Table 3.6.3.1 in accordance with the OBC Div. B Part 3 Sentence 3.2.9.2(9).

    717 CHURCH ST · Aug 18, 2026 · 185 m away
  • Building permit

    Proposal to construct new 1 storey rear addition and extensive interior renovations to existing dwelling

    109 PARK RD · Aug 18, 2026 · 205 m away
  • Building permit

    Proposed interior fit out to update existing school to new school finishes and layout

    120 BLOOR ST E · Aug 17, 2026 · 276 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
Yonge Station6 min walk
Nearest TTC stop
Yonge St at Scollard St5 min walk
Nearest cycling route
Rosedale Valley TrlMulti-Use Trail - Boulevard, 1 min walk
Nearest traffic count
21,644 vehicles in 14 hPark Rd / Rosedale Valley Rd / Rosedale Valley Trl, 30 m away, Oct 9, 2025
Serious collisions within 500 m
62021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 3 with cyclists
Parks
Rosedale Ravine Lands1 min walk
Lawren Harris Park1 min walk
Milner Parkette3 min walk

Schools within 1 km

  • BRANKSOME HALL GIRLS SCHOOL Private 6 min walk
  • MCDONALD INTERNATIONAL ACADEMY SCHOOL Private 6 min walk
  • HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 7 min walk
  • ROSEDALE JR PUBLIC SCHOOL English Public 8 min walk
  • JESSE KETCHUM JR & SR PUBLIC SCHOOL English Public 10 min walk
  • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.