HousePrecheckCheck an address

150 Queens Wharf RdToronto · zoning, lot size and permit records

≈ 82.5 × 55.1 m3,349 m²on Bathurst St

Not a home

Mouth Of The Creek Park (Prop A)

The City of Toronto's real estate inventory lists Mouth Of The Creek Park (Prop A) here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 26 255138 (Proposed installation of GeoExchange system consisting of 45 boreholes, 2026); 26 192924 (Proposal to construct a 37 storey apartment building with 2 levels of underground parki..., 2026); 26 126924 STE 10 SA (The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground f..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 37 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
N50 m
≈ 82.5 m frontage≈ 55.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 255138 (Proposed installation of GeoExchange system consisting of 45 boreholes, 2026); 26 192924 (Proposal to construct a 37 storey apartment building with 2 levels of underground parki..., 2026); 26 126924 STE 10 SA (The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground f..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit26 255138Permit Issued

    Proposed installation of GeoExchange system consisting of 45 boreholes

    Oct 20, 2026 · 150 QUEENS WHARF RD
  • Building permit26 192924Examiner's Notice Sentnew building

    Proposal to construct a 37 storey apartment building with 2 levels of underground parking garage for TCHC.

    Jun 29, 2026 · 150 QUEENS WHARF RD
  • Zoning review26 126924 PSPClosed
    May 29, 2026 · 150 QUEENS WHARF RD
  • By-law investigation26 151470 GRA 00 IRClosed

    Graffiti

    Apr 28, 2026 · 150 QUEENS WHARF RD
  • By-law investigation26 141491 WST 00 IRClosed

    Waste

    Apr 10, 2026 · 150 QUEENS WHARF RD
  • Development application26 126924 STE 10 SAApplication Received

    The 2025 Proposal is a 37-storey tower with a total of 268 units and ~350m2 of ground floor non-residential GFA. Of the 268 units, over 50% of the units are larger two- and three-bedroom units and 30% of the total units are planned to be affordable.

    Mar 9, 2026 · 150 QUEENS WHARF RD · City file
  • Zoning review25 257206 PRZClosed
    Dec 4, 2025 · 150 QUEENS WHARF RD
  • Development application25 257206 STE 10 OZClosed

    Proposed increase in height from the previously approved 29-storey tower to a 37-storey tower. The proposal increases the GFA by 3591 square metres and reduces the number of dwelling units from 282 to 268 total units.

    Nov 21, 2025 · 150 QUEENS WHARF RD · City file
Show 3 older records
  • Zoning review21 146032 PRZClosed
    Sep 7, 2021 · 150 QUEENS WHARF RD
  • Development application21 146032 STE 10 OZClosed

    150 Queens Wharf Road Housing Now Zoning By-law Amendment application to facilitate the development of the site for a 29-storey mixed-use building having a non-residential gross floor area of 307.0 square metres, and a residential gross floor area of 21,593.0 square metres. A total of 282 residential dwelling units are proposed.

    Apr 26, 2021 · 150 QUEENS WHARF RD · City file
  • Zoning review18 107949 ZPRClosed
    Jan 22, 2018 · 150 QUEENS WHARF RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,349 m²
Frontage
82.5 mestimated, irregular lot
Depth
55.1 mestimated, irregular lot
Street
Bathurst St
Corner lot
No
Public lane
None
House footprint
73 m²roof up to 15.4 m
Back yard
24.8 mhouse to rear lot line
Side yards
0.4 m and 70.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%10 of 10 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    15

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equipped with an energized outlet, the number of oversized bicycle parking spaces, and the minimum width of two short-term bicycle parking spaces. The altered mixed-use building will contain commercial uses on the first and second storeys, indoor and outdoor amenity spaces on the second storey, and a total of 162 residential dwelling units.

      485 WELLINGTON ST W · Oct 7, 2026 · 406 m away
    • Minor varianceApproved

      To alter the development standards for the 15-storey (50 m) mixed-use building (as approved under Site Specific Zoning By-Law 1047-2022), by increasing the overall height, number of dwelling units, and residential gross floor area, and to reduce loading and bicycle parking spaces.

      462 WELLINGTON ST W · Mar 26, 2025 · 495 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1336-2023), for the 33-storey (Building A) and 26-storey (Building C) mixed-use buildings, by increasing the height, gross floor area, and maximum permitted projections of equipment and structures. Also, to reduce the minimum required parking spaces, loading spaces, building setbacks, and separation distances. There will be a total of 1,224 residential dwelling units (including 28 residential affordable rental units) on this lot.

      2 TECUMSETH ST · Jan 8, 2025 · 458 m away
    • Minor varianceApproved

      To permit the undersized loading spaces (Type C) in the parking level of a 15 storey mixed-use building (currently under construction).

      530 FRONT ST W · Jun 12, 2024 · 286 m away
    • Minor varianceApproved

      To permit the extension of the existing lawful non-conforming live/work unit on the second storey of the two-storey mixed-use building, by constructing a rear second storey addition and a rear rooftop deck.

      575 WELLINGTON ST W · Oct 4, 2023 · 356 m away

    Latest activity nearby

    • Building permit

      Proposal to demolish existing partial wall and construct a tenant demising wall at Level 1, Area C north lobby.

      530 FRONT ST W · Nov 18, 2026 · 286 m away
    • Building permit

      Proposal for interior alterations to PH-7 unit

      21 ICEBOAT TER · Nov 17, 2026 · 263 m away
    • Building permit

      Proposal for alternative solution for the turnstiles for access control to meet the intent of the OBC for egress and barrier-free accessibility requirements

      530 FRONT ST W · Oct 30, 2026 · 286 m away
    • Zoning review

      Closed

      115 FORT YORK BLVD · Oct 29, 2026 · 188 m away
    • Building permit

      Proposal for interior alterations to office spaces on Level 01, 07 and 08.

      530 FRONT ST W · Oct 29, 2026 · 286 m away
    • Building permit

      Proposed installation of GeoExchange system consisting of 45 boreholes

      150 QUEENS WHARF RD · Oct 20, 2026 · 15 m away
    • Building permit

      1 Wall Sign****McCain Foods****

      530 FRONT ST W · Oct 20, 2026 · 286 m away
    • Building permit

      REV 01: Revision to permit, revisions made due to coring location issuesPlumbing - Interior alterations of an existing suite - including minor architectural, HVAC, plumbing, electrical work. Unit 134 & 135 - Tim Horton's

      2 BRUYERES MEWS · Oct 14, 2026 · 242 m away
    • Building permit

      Proposed interior fit up for new dentist office.

      22 BATHURST ST · Oct 13, 2026 · 235 m away
    • Building permit

      Proposed interior alterations for pizza restaurant

      115 FORT YORK BLVD · Oct 6, 2026 · 188 m away

    Neighbourhood: Harbourfront-CityPlace

    About the area around the lot, not the lot itself.

    Nearest station
    St. Andrew Station24 min walk
    Nearest TTC stop
    Bathurst St at Fort York Blvd1 min walk
    Nearest cycling route
    Fort York BlvdBike Lane, 1 min walk
    Nearest traffic count
    17,025 vehicles in 14 hBathurst St / Fort York Blvd, 90 m away, Oct 14, 2026
    Serious collisions within 500 m
    82021–2026, killed or seriously injured: 0 fatal, 5 with pedestrians, 1 with cyclists
    Parks
    Northern Linear Park1 min walk
    Canoe Landing3 min walk
    Victoria Memorial Square Park5 min walk

    Schools within 1 km

    • CITY SCHOOL English Public 7 min walk
    • JEAN LUMB PUBLIC SCHOOL English Public 8 min walk
    • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 8 min walk
    • THE WATERFRONT SCHOOL English Public 8 min walk
    • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 11 min walk
    • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureHarbourfront-CityPlaceMedian neighbourhood
    Median household income (2020)$90,000$84,500
    Households that own their home40%54%
    Population (2021)28,13516,813
    Homes built in 1960 or before0%29%
    Homes needing major repairs2%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleHarbourfront-CityPlaceCity median
    Assault883.3636.3
    Robbery48.169.5
    Homicide2.85.3
    Shootings8.510.5
    Auto theft56.6192.6
    Theft over $5,00056.646.1
    Break and enter141.6172.8
    Theft from vehicles121.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.