HousePrecheckCheck an address

15 The Donway EToronto · zoning, lot size and permit records

≈ 214.7 × 263.5 m47,439 m²on The Donway E

Not a home

Don Mills Collegiate Institute

The City's school locations place Don Mills Collegiate Institute on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 12 182067 (Fire alarm control panel and remote annunciator panel replacement, 2012, status Permit Issued); 09 154715 (Installation of 2 portable classrooms, 2009, status Inspection); 05 167828 (relocate 2 portable classrooms, 2007, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 29 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
≈ 214.7 m frontage≈ 263.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 building permits open, the oldest since 2007

    Needs a closer look

    Still open in the City's records: 12 182067 (Fire alarm control panel and remote annunciator panel replacement, 2012, status Permit Issued); 09 154715 (Installation of 2 portable classrooms, 2009, status Inspection); 05 167828 (relocate 2 portable classrooms, 2007, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 29 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

16 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 133750Closed

    Proposal to relocate existing portable classroom - Don Mills Collegiate Institute

    Apr 29, 2025 · 15 THE DONWAY E
  • Building permit23 219486Closed

    KITCHEN MILLWORK REPLACEMENT

    Nov 9, 2023 · 15 THE DONWAY E
  • Zoning review22 134337 LTOClosed
    Apr 13, 2022 · 15 THE DONWAY E
  • Building permit20 160858Closed

    Proposal for new sink in classroom 134A&B

    Jul 7, 2020 · 15 THE DONWAY E
  • Building permit20 118388Closed

    The proposal contains one illuminated ground sign, displaying static copy and readograph copy (displayed and changed electronically), located at the west frontage, perpendicular to The Donway East.****DON MILLS COLLEGIATE INSTITUTE****

    Apr 24, 2020 · 15 THE DONWAY E
  • Zoning review19 240551 ZSVClosed
    Oct 24, 2019 · 15 THE DONWAY E
  • Building permit16 126063Closed

    Installation of backflow preventer

    Mar 31, 2016 · 15 THE DONWAY E
  • Building permit12 182067Permit Issued

    Fire alarm control panel and remote annunciator panel replacement.

    Jun 4, 2012 · 15 THE DONWAY E
Show 8 older records
  • Building permit10 147016Closed - Dormant

    HVAC - Don Mills Collegiate Institute - Green House addition

    Jul 7, 2010 · 15 THE DONWAY E
  • Building permit09 154715Inspection

    Installation of 2 portable classrooms

    Sep 11, 2009 · 15 THE DONWAY E
  • Building permit05 167828Inspection

    relocate 2 portable classrooms.

    Sep 18, 2007 · 15 THE DONWAY E
  • Building permit07 258043Closed

    Placement of classroom

    Sep 14, 2007 · 15 THE DONWAY E
  • Building permit03 114017Closed - Dormant

    Interior alterations to Don Mills Middle School and Collegiate Institute

    Mar 17, 2003 · 15 THE DONWAY E
  • Zoning review03 109612 ZPUClosed
    Feb 20, 2003 · 15 THE DONWAY E
  • Building permit00 331759Closed - Dormantnew building

    INSTALL NEW ONE SCHOOL PORTABLE

    Sep 15, 2000 · 15 THE DONWAY E
  • Building permit97 251423Closed - Dormant

    3FIXS SANI ADD 1 SEDIMENT

    Dec 25, 1997 · 15 THE DONWAY E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
47,439 m²
Frontage
214.7 mestimated, irregular lot
Depth
263.5 mestimated, irregular lot
Street
The Donway E
Corner lot
No
Public lane
None
House footprint
10,233 m²roof up to 27.6 m
Back yard
113 mhouse to rear lot line
Side yards
1.3 m and 91.1 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: apple, sargents (20 cm), apple, sargents (17 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%11 of 12 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
3

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing one-storey detached dwelling by constructing one-storey rear and front additions.

    4 NORTH HILLS TER · Feb 19, 2026 · 451 m away
  • Minor varianceApproved

    To increase the maximum permitted height and number of storeys and reduce the required number of vehicular parking spaces.

    1030 DON MILLS RD · Mar 20, 2025 · 480 m away
  • Minor varianceApproved

    To construct a new dwelling.

    12 BRIARFIELD DR · Feb 20, 2025 · 426 m away
  • Minor varianceApproved

    To alter the existing two-storey dwelling by constructing a new two-storey side addition and rear deck.

    33 MOCCASIN TRL · Nov 21, 2024 · 423 m away
  • Minor varianceApproved

    Proposal to increase existing ground floor, add a second floor on the existing basement. (Existing basement and foundation wall remain).

    9 WAXWING PL · Aug 29, 2024 · 258 m away

Latest activity nearby

  • Building permit

    Proposal for an additon, underpinning & interoir alterations to include PLB & DRN.

    48 GREENLAND RD · Aug 19, 2026 · 171 m away
  • Zoning review

    Closed

    48 GREENLAND RD · Feb 25, 2026 · 171 m away
  • Building permit

    Removing existing old carport to install new Proposed carport and proposed side deck

    116 PLATEAU CRES · Aug 26, 2025 · 236 m away
  • Building permit

    Proposal to relocate existing portable classroom - Don Mills Collegiate Institute

    15 THE DONWAY E · Apr 29, 2025 · 74 m away
  • Building permit

    Proposal to install a backwater valve on the sanitary line in an existing SFD-detached dwelling.

    98 PLATEAU CRES · Apr 24, 2025 · 297 m away
  • Building permit

    Fire alarm panel replacement and smoke detector installation for elevator modernization.

    7 THE DONWAY E · Dec 31, 2024 · 248 m away
  • Minor varianceApproved

    Proposal to increase existing ground floor, add a second floor on the existing basement. (Existing basement and foundation wall remain).

    9 WAXWING PL · Aug 29, 2024 · 258 m away
  • Building permit

    Proposal for rear addition, interior load bearing wall removal and interior alterations

    62 GREENLAND RD · Aug 27, 2024 · 276 m away
  • Building permit

    Proposed restoration repairs to the existing dwelling due to tree damage.

    75 GREENLAND RD · May 28, 2024 · 296 m away
  • Minor varianceApproved

    Proposal to construct new 2-storey dwelling with a front porch, rear patio and rear balcony. This application was previously deferred on June 22nd, 2023 to address the concerns of City Staff.

    8 WAXWING PL · Jan 18, 2024 · 237 m away

Neighbourhood: Banbury-Don Mills

About the area around the lot, not the lot itself.

Nearest station
Aga Khan Park & Museum Station25 min walk
Nearest TTC stop
Opposite 8 Donway Place - Revera Downey Place2 min walk
Nearest cycling route
Moccasin TrlMulti-Use Trail, 5 min walk
Nearest traffic count
5,174 vehicles in 8 hGreenland Rd / The Donway E, 200 m away, Apr 16, 2019
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
Parks
Moccasin Trail Park3 min walk
Macklin Hancock Park6 min walk
Woodcliff Greenbelt6 min walk

Schools within 1 km

  • DON MILLS COLLEGIATE INSTITUTE English Public 1 min walk
  • DON MILLS MDL SCHOOL English Public 2 min walk
  • GREENLAND PUBLIC SCHOOL English Public 3 min walk
  • SENECA HILL PRIVATE SCHOOL Private 13 min walk
  • OVERLAND LEARNING CENTRE English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBanbury-Don MillsMedian neighbourhood
Median household income (2020)$91,000$84,500
Households that own their home60%54%
Population (2021)27,15516,813
Homes built in 1960 or before24%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBanbury-Don MillsCity median
Assault404.9636.3
Robbery101.269.5
Shootings9.210.5
Auto theft220.9192.6
Theft over $5,00067.546.1
Break and enter248.5172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.