Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 15 St Nicholas St
15 St Nicholas St is on a 12.5 m by 19 m lot on Phipps St in Bay-Cloverhill. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 5 records on this lot since 2008. That is more than at 93% of Toronto houses. In 2018, a building permit was filed: "Proposal to construct interior alterations for new restaurant tenant". Status: closed. In 2010, a development application was filed: "Noac issued on august 10, 2011. minor variance application a0850/11tey approved on may 2, 2012 to primarily increase the height of building from 45 to 48…". Status: closed. In 2009, a building permit was filed: "Proposal to install 1 backflow prevention device to the existing water line in a multi unit commercial building. "skate park and dance studio". convenience…". Status: closed. Nothing on file is open right now.
Within 300 m, 22 development applications are open (the tallest up to 76 storeys). Within 300 m, the Committee of Adjustment decided 29 minor variance applications in the last 10 years and approved 100%. Wellesley station is a 2-minute walk.
Summary
What the City's records show on this house
- Heritage property: designated (Part IV)Moderate
- Zoning not in By-law 569-2013Moderate
- 22 development applications open within 300 mLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
5 records on file, more than at 93% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2018-05-17 | Building permit18 147947 | Proposal to construct interior alterations for new restaurant tenant. | Closed | |
| 2010-01-27 | Development application10 110551 STE 27 SA | NOAC issued on August 10, 2011. Minor Variance Application A0850/11TEY approved on May 2, 2012 to primarily increase the height of building from 45 to 48 storeys, increase the GFA, and reduce the parking requirement. Revised Site Plan application was received on September 12, 2012. Key revisions related to height from 152 metres to 160.88 metres, 32 additional residential units (539 units total), 1860 square metres of additional GFA, 77 square metres of additional indoor amenity space. Commercial/office units on the upper levels fronting Yonge St have been replaced with residential units and retail mezzanines along St Nicholas have been deleted. | Closed | |
| 2009-09-09 | Building permit09 163681 | Proposal to install 1 backflow prevention device to the existing water line in a multi unit commercial building. "Skate Park and Dance Studio". Convenience addresss 19 St. Nicholas Street. | Closed | |
| 2009-09-09 | Building permit09 163668 | Proposal to install 1 backflow prevention device to the existing water line in a multi unit commercial building. "Office and Gyms". Convenience addresss 25 St. Nicholas Street. | Closed | |
| 2008-10-15 | Development application08 213136 STE 27 OZ | rezoning application - for mixed use residential commercial development - 420 residential units - retail units | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Zoning not in By-law 569-2013
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- St Nicholas St, 17.5 m along it
- House footprint
- 130 m²
- Back yard
- 0.5 m
- Buildings on the lot
- 4
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 22 development applications open within 300 m, up to 76 storeys
- 29 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
22 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 6 categories
- Theft over $5,000: 1.9 times the Toronto median
- Break and enter: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Bay-Cloverhill neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Wellesley StationNearest station2 min walk
- Yonge St at Wellesley St West - Wellesley StationNearest TTC stop1 min walk
- Wellesley St WNearest cycling route1 min walk
- The YMCA Academy Secondary SchoolSchool3 min walk
- St Joseph's College SchoolSchool5 min walk
- The Abelard Centre for EducationSchool7 min walk
- Toronto School of Theology - U of T, Bldg 434School7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3601.9
- Robberycity median 69.574.7
- Auto theftcity median 192.616.6
- Theft over $5,000city median 46.187.2
- Break and entercity median 172.8286.4
- Theft from vehiclescity median 188.1145.3
Ready emails
Copy and send as they are.
1 question for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist