Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 26 180796 PRS 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 222435 (Minor interior renovations on GF, 2nd and 22nd floors. Existing exteriors and footprint..., 2026); 22 204562 STE 13 SA (Official Plan and Zoning By-law Amendment application to permit a 71-storey mixed-use b..., 2022); 22 204563 STE 13 OZ (Official Plan and Zoning By-law Amendment application to permit a 71-storey mixed-use b..., 2022).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications11 development applications open within 300 m
Good to know11 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- Building permit26 222435Permit Issued
Minor interior renovations on GF, 2nd and 22nd floors. Existing exteriors and footprints to remain.
Oct 2, 2026 · 15 RICHMOND ST E - By-law investigation26 180796 PRS 00 IRClosed
Property Standards
Jun 9, 2026 · 15 RICHMOND ST E - By-law investigation26 146397 GRA 00 IVClosed
Notice Issued Graffiti
Mar 12, 2026 · 15 RICHMOND ST E - By-law investigation26 128886 GRA 00 IRClosed
Graffiti
Mar 12, 2026 · 15 RICHMOND ST E - Zoning review22 204563 POZClosedOct 20, 2022 · 15 RICHMOND ST E
- Development application22 204562 STE 13 SAUnder Review
Official Plan and Zoning By-law Amendment application to permit a 71-storey mixed-use building containing 126 square metres of retail space on the ground floor and 565 residential dwelling units above.
Sep 16, 2022 · 15 RICHMOND ST E · City file - Development application22 204563 STE 13 OZAppeal Received
Official Plan and Zoning By-law Amendment application to permit a 71-storey mixed-use building containing 126 square metres of retail space on the ground floor and 565 residential dwelling units above.
Sep 16, 2022 · 15 RICHMOND ST E · City file - Building permit10 144414Closed
Proposal to install a backflow preventor in existing hotel.
Apr 20, 2010 · 15 RICHMOND ST E
Show 2 older records
- Building permit07 256296Closed
Interior alterations to ground floor dining room, lobby, & bar, and 2nd floor club rooms. Existing Hotel - "Cambridge Suites Hotel Toronto".
Sep 10, 2007 · 15 RICHMOND ST E - Zoning review06 191005 ZPRClosedNov 13, 2006 · 15 RICHMOND ST E
Check before you build
Site-specific exception 900.11.10(2337)
Needs a closer look4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 276 of former City of Toronto By-law 438-86
- Older by-law D
On 15 Richmond St. E., 151 Yonge St., former City of Toronto by-law 94-89.
Lot facts
- Area
- 1,083 m²
- Frontage
- 28.8 m
- Depth
- 37.9 m
- Street
- Richmond St E
- Corner lot
- Yes, also on Victoria St37.9 m along it
- Public lane
- None
- Max height
- 76 m
- Max lot coverage
- —
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 12.0 (c8.0; r11.7) SS1 (x2337) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: oak (10 cm), ginkgo (8 cm), ginkgo (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 94%15 of 16 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 27
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
20 KING ST W · Jun 17, 2026 · 267 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 441 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 494 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 490 m away - Minor varianceApproved
To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.
89 CHURCH ST · Jan 15, 2025 · 241 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 265 m away - Building permit
Modification of the existing sprinkler system for a new tenant layout (Cubecom) on the 6th floor. Related Permit no. 26 223212 BLD 00 BA
4 KING ST W · Nov 23, 2026 · 268 m away - Building permit
Revision 01 - Relocate 2 smoke detectors at the interior staircase.---------------------------------------------------------------Proposal to extend existing interconnected stair between 55th and 56th floor to 57th floor
40 KING ST W · Nov 23, 2026 · 275 m away - Building permit
Proposed interior fit-out for new tenant 'SMART & BIGGAR'.
40 KING ST W · Nov 20, 2026 · 275 m away - Building permit
Proposed interior alterations Building, plumbing and HVAC work to tenant space.
151 YONGE ST · Nov 20, 2026 · 49 m away - Building permit
Revision No.1: New Fire Shutter Window
30 ADELAIDE ST E · Nov 20, 2026 · 112 m away - Building permit
nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements
50 RICHMOND ST E · Nov 19, 2026 · 125 m away - Building permit
Proposal to replace existing pre-action system fire control panel and associated initiating field devices.
30 BOND ST · Nov 19, 2026 · 224 m away - Building permit
PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING AND MAGLOCK PERMITS.
40 KING ST W · Nov 18, 2026 · 275 m away - Building permit
PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING.
40 KING ST W · Nov 18, 2026 · 275 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station2 min walk
- Nearest TTC stop
- Yonge St at Richmond St East1 min walk
- Nearest cycling route
- Richmond St ECycle Track, 1 min walk
- Nearest traffic count
- 17,819 vehicles in 14 hRichmond St E / Victoria St, 40 m away, Oct 9, 2025
- Serious collisions within 500 m
- 132021–2026, killed or seriously injured: 2 fatal, 6 with pedestrians, 2 with cyclists
- Parks
- Cloud Gardens2 min walk
- Courthouse Square Park4 min walk
- St. James Park5 min walk
Schools within 1 km
- VICTORIA STREET LINC English Public 1 min walk
- KEYSTONE INTERNATIONAL SCHOOLS Private 3 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 6 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.