HousePrecheckCheck an address

15 Maplewood AveToronto · zoning, lot size and permit records

Residential apartment · RA (x558)≈ 26.4 × 44.8 m433 m²on Vaughan Rdcorner, also on Maplewood Avebacks onto Ln E Vaughan S Maplewwod

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.0 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 12 development applications open within 300 m, up to 37 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: St Clair WestThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 26.4 m frontage≈ 44.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Zoning): 26 240125 ZON 00 IR (Zoning, 2026); 26 239984 ZON 00 IR (Zoning, 2026); 26 183045 HEA 00 IR (Adequate Heat, 2026); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 12 development applications open within 300 m

    Good to know

    12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 3 short-term rental registrations here

    Good to know

    3 active short-term rental registrations at this address (Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 240125 ZON 00 IRClosed

    Zoning

    Sep 18, 2026 · 15 MAPLEWOOD AVE
  • By-law investigation26 239984 ZON 00 IRClosed

    Zoning

    Sep 18, 2026 · 15 MAPLEWOOD AVE
  • By-law investigation26 183045 HEA 00 IRClosed

    Adequate Heat

    Jun 11, 2026 · 15 MAPLEWOOD AVE
  • By-law investigation26 134528 ZON 00 IRClosed

    Zoning

    Mar 25, 2026 · 15 MAPLEWOOD AVE
  • By-law investigation25 132784 ZON 00 IRClosed

    Zoning

    Mar 21, 2025 · 15 MAPLEWOOD AVE
  • Development application15 125200 STE 21 OZClosed

    St Clair Ave W and Bathurst Street Area Planning Framework Study - On January 30, 2019 City Council requested the Chief Planner and Executive Director, City Planning, to modify the Official Plan Policy review for the Raglan Avenue/Vaughan Road area (initiated in a staff report dated May 27, 2015 and adopted by City Council on July 27, 2015), by expanding the study boundary and focusing on built form, land use, and community services.

    Mar 9, 2015 · 15 MAPLEWOOD AVE

Check before you build

  • Site-specific exception 900.7.10(558)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.7.10(558)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 16(319) of the former City of York zoning by-law 1-83.

By-law 569-2013, Chapter 900

Lot facts

Area
433 m²
Frontage
26.4 mestimated, irregular lot
Depth
44.8 mestimated, irregular lot
Street
Vaughan Rd
Corner lot
Yes, also on Maplewood Ave44.8 m along it
Public lane
Ln E Vaughan S Maplewwod, 31 m along it
Max height
24 m
Max lot coverage
—
  • Major Transit Station Area: St Clair West. The lot is inside the St Clair West Major Transit Station Area approved by the Province (Site and Area Specific Policy 717). Source
  • Zone RA (x558) (Residential Apartment). Chapter 15, section 15.10 of the by-law. Source

Around this lot

Minor variances approved
94%44 of 47 decisions
Garden suite permits
1
Laneway suite permits
8
Multiplex permits
19
Development applications
22

Within 300 m, last 10 years. 28 suite and multiplex permits: more than at 93% of Toronto houses (median 3). 47 variance decisions: more than at 82% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 13-storey detached mixed-use building by converting the existing six non-residential units on the ground level into nine non-residential units. The building will contain a total of 120 rental residential dwelling units and nine non-residential units.

    1500 BATHURST ST · Oct 21, 2026 · 272 m away
  • Minor varianceRefused

    To alter the development standards (as approved by site-specific Zoning By-law No. 531-2024(OLT)) for the 28-storey mixed-use building to increase the building height to 34 storeys, increase the gross floor area and modify building setbacks. There will be a total of 236 residential dwelling units on this lot. This is currently under the review of Site Plan Control (File No. 21 232984 STE 12 SA).

    5 RAGLAN AVE · Aug 27, 2025 · 304 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1050-2022), for a new 30-storey mixed-use building, by increasing building height, non-residential and residential gross floor areas, and decreasing outdoor amenity space, Site Plan Control Application File 20 21 213475 STE 12 SA, which is currently under review. There will be a total of 305 residential dwelling units on this lot.

    91 RAGLAN AVE · Jul 9, 2025 · 77 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 1051-2022 and 1052-2022) for a 36-storey mixed-use building (including a mechanical penthouse), to permit indoor amenity space on the rooftop. There will be a total of 352 residential dwelling units (of which 62 units will be rental replacement units) on this lot. Committee of Adjustment considered and approved variances to the Zoning By-law under Minor Variance Decision A0686/24TEY, however the construction alterations necessitates further minor variances.

    40 RAGLAN AVE · Jun 11, 2025 · 199 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-laws 1051-2022 and 1052-2022) for a 36-storey mixed-use building, including a mechanical penthouse. There will be a total of 352 residential dwelling units (of which 62 units will be rental replacement units) on this lot.

    40 RAGLAN AVE · Feb 19, 2025 · 199 m away

Latest activity nearby

  • Building permit

    Commercial unit at ground level to be renovated for new nail salon.

    1500 BATHURST ST · Nov 19, 2026 · 272 m away
  • Building permitdemolition, multiplex

    PROPOSED DEMOLITION OF AN EXISTING HOUSE AND CONSTRUCTION OF A NEW DUPLEX DWELLING WITH AN ATTACHED GARAGE.

    617 LONSDALE RD · Nov 4, 2026 · 263 m away
  • Building permitmultiplex, new building, new house, secondary suite

    PROPOSED DEMOLITION OF AN EXITING HOUSE AND CONSTRUCTION OF A NEW DUPLEX DWELLING WITH AN ATTACHED GARAGE.

    617 LONSDALE RD · Nov 4, 2026 · 263 m away
  • Building permit

    Geothermal energy well drilling for the 30 storey rental building to be constructed on the lands of 91-101 Raglan Ave

    91 RAGLAN AVE · Oct 27, 2026 · 77 m away
  • Building permit

    Proposal to construct a temporary air supported structure (dome) in the same location from December 7th 2026 and dismantiled on March 15th, 2027.

    1515 BATHURST ST · Oct 26, 2026 · 299 m away
  • Minor varianceApproved

    To alter the existing 13-storey detached mixed-use building by converting the existing six non-residential units on the ground level into nine non-residential units. The building will contain a total of 120 rental residential dwelling units and nine non-residential units.

    1500 BATHURST ST · Oct 21, 2026 · 272 m away
  • Building permitnew building

    Proposal for 30 storey residential development with 4 levels of below grade parking. Total of 290 residential dwelling units with small retail frontage along Raglan AveReference: 21 213475 STE 12 SA

    91 RAGLAN AVE · Oct 14, 2026 · 77 m away
  • Building permit

    Revision No.1: 2 new washrooms at 2nd floor; Structural reinforcements at all 3 levels.Proposed basement interior alterations with underpinning.

    68 KENWOOD AVE · Oct 7, 2026 · 184 m away
  • Building permitlaneway suite

    REV 01: Changes to layout and windowsTo construct a rear two storey laneway suite with open carport at grade

    205 WYCHWOOD AVE · Sep 28, 2026 · 250 m away
  • Building permitmultiplex, new building, new house

    Proposal to demolish existing SFD, and construct a new detached houseplex with 3 dwelling units, enclosed stairs on the roof, and roof decks. Proposed new triplex

    205 WYCHWOOD AVE · Sep 24, 2026 · 250 m away

Neighbourhood: Humewood-Cedarvale

About the area around the lot, not the lot itself.

Nearest station
St Clair West Station7 min walk
Nearest TTC stop
Vaughan Rd at Maplewood Ave1 min walk
Nearest cycling route
Vaughan RdBike Lane, 1 min walk
Nearest traffic count
5,520 vehicles in 8 hVaughan Rd / Maplewood Ave (South), 50 m away, Jan 15, 2019
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Tichester Park4 min walk
Cedarvale Ravine6 min walk
Humewood Park6 min walk

Schools within 1 km

  • ST MICHAEL'S COLLEGE SCHOOL Private 5 min walk
  • HUMEWOOD COMMUNITY SCHOOL English Public 9 min walk
  • HOLY ROSARY CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • FOREST HILL TUTORING Private 13 min walk
  • HILLCREST COMMUNITY SCHOOL English Public 14 min walk
  • ST ALPHONSUS CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumewood-CedarvaleMedian neighbourhood
Median household income (2020)$83,000$84,500
Households that own their home37%54%
Population (2021)13,84516,813
Homes built in 1960 or before60%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumewood-CedarvaleCity median
Assault471.6636.3
Robbery42.369.5
Shootings12.110.5
Auto theft133192.6
Theft over $5,00018.146.1
Break and enter211.6172.8
Theft from vehicles108.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.