HousePrecheckCheck an address

15 Library LaneToronto · zoning, lot size and permit records

Also 104 Scholars Walk, 35 Nelson Rd, 92 Scholars Walk

≈ 192.2 × 225.5 m36,614 m²on Scholars Walkcorner, also on Library Lane

Not a home

A commercial or mixed-use building

4 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 272433 (Proposal for the replacement of an existing fire alarm control panel and existing detec..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 192.2 m frontage≈ 225.5 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Ravine and natural feature protection (21% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Building permit open since 2016

    Needs a closer look

    Still open in the City's records: 16 154106 (Change of use from residential to welcome house for indigenous students, 2016, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (23% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 272433 (Proposal for the replacement of an existing fire alarm control panel and existing detec..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

3 records on file: more than at 81% of Toronto houses (median 0).

  • Building permit26 272433Not Started

    Proposal for the replacement of an existing fire alarm control panel and existing detection devices. Work to include any repairs to existing wiring if required and no new devices to be added

    Nov 19, 2026 · 104 SCHOLARS WALK
  • Building permit16 154106Inspection

    Change of use from residential to welcome house for indigenous students

    Aug 9, 2016 · 35 NELSON RD
  • Zoning review11 264121 LPRClosed
    Aug 26, 2011 · 92 SCHOLARS WALK

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
36,614 m²
Frontage
192.2 mestimated, irregular lot
Depth
225.5 mestimated, irregular lot
Street
Scholars Walk
Corner lot
Yes, also on Library Lane225.5 m along it
Public lane
None
House footprint
6,244 m²roof up to 26.3 m
Back yard
57.6 mhouse to rear lot line
Side yards
47.8 m and 70 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    —no decisions on file
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To maintain the existing lodging house which will contain a total of 8 rooms and to construct a rear yard platform.

      14 BOAKE ST · May 28, 2026 · 443 m away
    • Minor varianceApproved

      To construct two new 8-storey student housing buildings.

      4700 KEELE ST · Mar 7, 2024 · 333 m away
    • Minor varianceApproved

      To permit a reduction to the number of parking spaces required on the University Lands from 8,915 spaces to 7,500 spaces.

      4700 KEELE ST · Oct 15, 2015 · 333 m away
    • Minor varianceApproved

      This is an application to permit a reduction in the parking supply within the York University lands to accommodate the construction of a stadium, on-going Toronto - York Spadina Subway Extension construction and on-going transportation demand management initiatives of the University prior to the opening of the subway.

      4700 KEELE ST · Jun 6, 2012 · 333 m away
    • Minor varianceApproved

      This is an application to permit the construction of a new fire station on the above noted property.

      4700 KEELE ST · Feb 17, 2010 · 333 m away

    Latest activity nearby

    • Building permit

      Proposal for the replacement of an existing fire alarm control panel and existing detection devices. Work to include any repairs to existing wiring if required and no new devices to be added

      104 SCHOLARS WALK · Nov 19, 2026 · 76 m away
    • Building permit

      Proposal for interior alteration of existing academic and office spaces for a new School of Medicine which includes Student Academic and Study Spaces, Clinical Simulation Rooms, and Administration and Office Suites.

      88 THE POND RD · Nov 16, 2026 · 285 m away
    • Building permit

      Proposed interior alterations for minor alteration on ground level to create new 137 m2 classroom by subdividing an existing reading room, with associated minor electrical and HVAC updates.

      115 CAMPUS WALK · Dec 11, 2025 · 231 m away
    • Building permit

      Proposal for interior alterations, fit-out for new restaurant

      105 THE POND RD · Oct 7, 2025 · 210 m away
    • Zoning review

      Closed

      105 THE POND RD · Oct 30, 2024 · 210 m away
    • Zoning review

      Closed

      105 THE POND RD · Jun 27, 2024 · 210 m away
    • Building permit

      Proposed outdoor patio associated to a cafe/restaurant.

      105 THE POND RD · May 30, 2024 · 210 m away
    • Building permit

      HVAC - Proposal for interior renovations to washrooms and interior finishes to improve accessibility.

      115 CAMPUS WALK · Jun 13, 2022 · 231 m away
    • Building permit

      Proposal for interior renovations to washrooms and interior finishes to improve accessibility.

      96 THE POND RD · Jun 10, 2022 · 135 m away
    • Building permit

      Proposal for interior alterations to existing building for an interior fit up located on the 7th floor of the Ross Building North. Scope of work includes new feature wall in the lobby, reception office, 2 meeting rooms, multi- purpose room, student lounge, kitchenette, replacement of corridor floor finish, and replacement of window blinds.

      115 CAMPUS WALK · May 5, 2022 · 231 m away

    Neighbourhood: York University Heights

    About the area around the lot, not the lot itself.

    Nearest station
    Pioneer Village Station13 min walk
    Nearest TTC stop
    The Pond Rd at Sentinel Rd West Side2 min walk
    Nearest cycling route
    The Pond RdBike Lane, 2 min walk
    Nearest traffic count
    4,526 vehicles in 8 hThe Pond Rd / Passy Cres (East), 120 m away, Mar 11, 2009
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    175 the Pond Road Park4 min walk
    Fred Young Park6 min walk
    Dan Iannuzzi Park7 min walk

    Schools within 1 km

    • YORK U - KEELE CAMPUS University 5 min walk
    • SENECA COLLEGE (SENECA AT YORK CAMPUS) College 7 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureYork University HeightsMedian neighbourhood
    Median household income (2020)$76,000$84,500
    Households that own their home47%54%
    Population (2021)28,25516,813
    Homes built in 1960 or before14%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleYork University HeightsCity median
    Assault1274.1636.3
    Robbery12869.5
    Shootings11.910.5
    Auto theft634.1192.6
    Theft over $5,000178.646.1
    Break and enter375.1172.8
    Theft from vehicles312.6188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.