Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Ravine and natural feature protection (21% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Building permit open since 2016
Needs a closer lookStill open in the City's records: 16 154106 (Change of use from residential to welcome house for indigenous students, 2016, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (23% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 26 272433 (Proposal for the replacement of an existing fire alarm control panel and existing detec..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
3 records on file: more than at 81% of Toronto houses (median 0).
- Building permit26 272433Not Started
Proposal for the replacement of an existing fire alarm control panel and existing detection devices. Work to include any repairs to existing wiring if required and no new devices to be added
Nov 19, 2026 · 104 SCHOLARS WALK - Building permit16 154106Inspection
Change of use from residential to welcome house for indigenous students
Aug 9, 2016 · 35 NELSON RD - Zoning review11 264121 LPRClosedAug 26, 2011 · 92 SCHOLARS WALK
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 36,614 m²
- Frontage
- 192.2 mestimated, irregular lot
- Depth
- 225.5 mestimated, irregular lot
- Street
- Scholars Walk
- Corner lot
- Yes, also on Library Lane225.5 m along it
- Public lane
- None
- House footprint
- 6,244 m²roof up to 26.3 m
- Back yard
- 57.6 mhouse to rear lot line
- Side yards
- 47.8 m and 70 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To maintain the existing lodging house which will contain a total of 8 rooms and to construct a rear yard platform.
14 BOAKE ST · May 28, 2026 · 443 m away - Minor varianceApproved
To construct two new 8-storey student housing buildings.
4700 KEELE ST · Mar 7, 2024 · 333 m away - Minor varianceApproved
To permit a reduction to the number of parking spaces required on the University Lands from 8,915 spaces to 7,500 spaces.
4700 KEELE ST · Oct 15, 2015 · 333 m away - Minor varianceApproved
This is an application to permit a reduction in the parking supply within the York University lands to accommodate the construction of a stadium, on-going Toronto - York Spadina Subway Extension construction and on-going transportation demand management initiatives of the University prior to the opening of the subway.
4700 KEELE ST · Jun 6, 2012 · 333 m away - Minor varianceApproved
This is an application to permit the construction of a new fire station on the above noted property.
4700 KEELE ST · Feb 17, 2010 · 333 m away
Latest activity nearby
- Building permit
Proposal for the replacement of an existing fire alarm control panel and existing detection devices. Work to include any repairs to existing wiring if required and no new devices to be added
104 SCHOLARS WALK · Nov 19, 2026 · 76 m away - Building permit
Proposal for interior alteration of existing academic and office spaces for a new School of Medicine which includes Student Academic and Study Spaces, Clinical Simulation Rooms, and Administration and Office Suites.
88 THE POND RD · Nov 16, 2026 · 285 m away - Building permit
Proposed interior alterations for minor alteration on ground level to create new 137 m2 classroom by subdividing an existing reading room, with associated minor electrical and HVAC updates.
115 CAMPUS WALK · Dec 11, 2025 · 231 m away - Building permit
Proposal for interior alterations, fit-out for new restaurant
105 THE POND RD · Oct 7, 2025 · 210 m away - Zoning review
Closed
105 THE POND RD · Oct 30, 2024 · 210 m away - Zoning review
Closed
105 THE POND RD · Jun 27, 2024 · 210 m away - Building permit
Proposed outdoor patio associated to a cafe/restaurant.
105 THE POND RD · May 30, 2024 · 210 m away - Building permit
HVAC - Proposal for interior renovations to washrooms and interior finishes to improve accessibility.
115 CAMPUS WALK · Jun 13, 2022 · 231 m away - Building permit
Proposal for interior renovations to washrooms and interior finishes to improve accessibility.
96 THE POND RD · Jun 10, 2022 · 135 m away - Building permit
Proposal for interior alterations to existing building for an interior fit up located on the 7th floor of the Ross Building North. Scope of work includes new feature wall in the lobby, reception office, 2 meeting rooms, multi- purpose room, student lounge, kitchenette, replacement of corridor floor finish, and replacement of window blinds.
115 CAMPUS WALK · May 5, 2022 · 231 m away
Neighbourhood: York University Heights
About the area around the lot, not the lot itself.
- Nearest station
- Pioneer Village Station13 min walk
- Nearest TTC stop
- The Pond Rd at Sentinel Rd West Side2 min walk
- Nearest cycling route
- The Pond RdBike Lane, 2 min walk
- Nearest traffic count
- 4,526 vehicles in 8 hThe Pond Rd / Passy Cres (East), 120 m away, Mar 11, 2009
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
- Parks
- 175 the Pond Road Park4 min walk
- Fred Young Park6 min walk
- Dan Iannuzzi Park7 min walk
Schools within 1 km
- YORK U - KEELE CAMPUS University 5 min walk
- SENECA COLLEGE (SENECA AT YORK CAMPUS) College 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | York University Heights | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,000 | $84,500 |
| Households that own their home | 47% | 54% |
| Population (2021) | 28,255 | 16,813 |
| Homes built in 1960 or before | 14% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | York University Heights | City median |
|---|---|---|
| Assault | 1274.1 | 636.3 |
| Robbery | 128 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 634.1 | 192.6 |
| Theft over $5,000 | 178.6 | 46.1 |
| Break and enter | 375.1 | 172.8 |
| Theft from vehicles | 312.6 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.