HousePrecheckCheck an address

15 Granger AveToronto · zoning, lot size and permit records

Employment · E 1.015.2 × 40.8 m619 m²on Granger Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N10 m
15.2 m frontage40.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    3 records on file: more than at 81% of Toronto houses (median 0).

    • Building permit17 208637Closed

      Proposal to install a 1/2 inch backflow prevention device.

      Aug 24, 2017 · 15 GRANGER AVE
    • Zoning review03 183238 000Closed
      Oct 4, 2003 · 15 GRANGER AVE
    • Building permit02 100349Closed

      FIRE SUPPRESSION SYSTEM IN EXISTING SPRAY BOOTH

      Jan 7, 2002 · 15 GRANGER AVE

    Lot facts

    Area
    619 m²
    Frontage
    15.2 m
    Depth
    40.8 m
    Street
    Granger Ave
    Corner lot
    No
    Public lane
    None
    House footprint
    315 m²roof up to 11.8 m
    Back yard
    0.1 mhouse to rear lot line
    Side yards
    0.4 m and 5.9 mhouse to side lot lines
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

    Around this lot

    Minor variances approved
    100%11 of 11 decisions
    Garden suite permits
    1
    Laneway suite permits
    1
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 11 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      Revision No.1: Proposal to review and legalize a Container Office on siteProposed interior alterations for raising the height of existing car work shop#1 to the same height of other existing car work shop #2 that both belongs to the owner.

      801 DANFORTH RD · Nov 10, 2026 · 190 m away
    • Building permit

      Revision 01: Change from 18ft x 8ft deck to a 18ft x 10ft deck.Proposal to construct a rear yard balcony.

      87 NATIONAL ST · Oct 15, 2026 · 238 m away
    • Building permit

      INSTALL BACK WATER VALVE (Unit # 42)

      42 LAUREL AVE · Jun 23, 2026 · 228 m away
    • Building permitsecondary suite

      Propoasal for interior alterations to create a second suite in basement.

      31 A LAUREL AVE · Jun 16, 2026 · 230 m away
    • Building permitsecondary suite

      Propoasal for interior alterations to create a second suite in basement.

      31 A LAUREL AVE · Jun 4, 2026 · 230 m away
    • Building permitsecondary suite

      - Change of use to Detached House with ONE Secondary Suite only- Interior Alterations- Demolishing front deck

      52 LAUREL AVE · Feb 27, 2026 · 226 m away
    • Minor varianceApproved

      Interior and exterior alterations to the existing one-storey repair garage.

      801-803 DANFORTH RD · Feb 11, 2026 · 190 m away
    • Minor varianceApproved

      To construct a new two-storey rear yard Garden Suite. The existing one-storey dwelling will remain unaltered.

      2 GRANGER AVE · Feb 11, 2026 · 84 m away
    • Zoning review

      Closed

      807 DANFORTH RD · Jul 29, 2025 · 222 m away
    • Zoning review

      Closed

      2 GRANGER AVE · Jul 7, 2025 · 84 m away

    Neighbourhood: Kennedy Park

    About the area around the lot, not the lot itself.

    Nearest station
    Scarborough GO Station8 min walk
    Nearest TTC stop
    Danforth Rd at Magnolia Ave3 min walk
    Nearest cycling route
    McCowan District Park TrlMulti-Use Trail, 16 min walk
    Nearest traffic count
    13,057 vehicles in 14 hDanforth Rd / Magnolia Ave, 200 m away, Nov 3, 2024
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
    Parks
    Jeanette Park7 min walk
    Greystone Park8 min walk
    Glen Sheppard Park10 min walk

    Schools within 1 km

    • NORMAN COOK JR PUBLIC SCHOOL English Public 7 min walk
    • S/E YEAR ROUND ALTERNATIVE & SCARBOROUGH CENTRE English Public 13 min walk
    • ROBERT SERVICE SR PUBLIC SCHOOL English Public 14 min walk
    • CORVETTE JR PUBLIC SCHOOL English Public 14 min walk
    • JOHN A LESLIE PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureKennedy ParkMedian neighbourhood
    Median household income (2020)$69,000$84,500
    Households that own their home52%54%
    Population (2021)17,11016,813
    Homes built in 1960 or before34%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleKennedy ParkCity median
    Assault1521.5636.3
    Robbery121.569.5
    Homicide5.35.3
    Shootings15.810.5
    Auto theft211.3192.6
    Theft over $5,00084.546.1
    Break and enter158.5172.8
    Theft from vehicles401.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.