Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
6 building permits open, the oldest since 2003
Needs a closer lookStill open in the City's records: 23 189692 (Proposed: Standalone Geothermal Permit in association with 21-193930 (300-304 THE EAST..., 2023, status Permit Issued); 22 243797 (Deferred Fees from folder 21 243797 (RSN-5031393) ZoningProcess RSN 70238412, 2022, status Open); 22 193930 (Deferred Fees from folder 21 193930 (RSN-4972720) ZoningProcess RSN 70238307, 2022, status Open); and 3 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)4 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards): 26 269222 PRS 00 IR (Property Standards, 2026); 26 252373 PRS 00 IR (Property Standards, 2026); 26 252369 PRS 00 IR (Property Standards, 2026); and 1 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 194103 (REV 01: Revision to floor plan as per bubbled drawingsProposed interior alterations for..., 2026); 26 195411 (Proposed interior alterations for fit-out of shell unit into dental office, 2026); 25 126693 (PHASE 2 - Construct new 21vstorey residential building with 233 rental units, which inc..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications4 Committee of Adjustment files on this lot
Good to know3 approved. A0236/23EYK (To permit the multi-use development project that will consist of four new buildings - P..., 2023); A0115/23EYK (Proposal for a multi use development project with 4 new buildings - Phase 1, Tower A an..., 2023); B0022/21EYK (To obtain consent to sever the property into two lots and to create easements/rights-of..., 2021); and 1 more.
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 96 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (11 storeys, 217 units, built 2026).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
93 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 194103Revision Issued
REV 01: Revision to floor plan as per bubbled drawingsProposed interior alterations for pharmacy and medical office
Nov 24, 2026 · 300-304 THE EAST MALL - Building permit25 126576Closed
Part Permit - PHASE 2 - Construct new 39 storey residential building with 438 rental units, including 4 storey podium and 2 levels of u/g parking garage - Tower B - Market Building
Nov 23, 2026 · 300-304 THE EAST MALL - By-law investigation26 269222 PRS 00 IRClosed
Property Standards
Nov 12, 2026 · 15 GIBBS RD - By-law investigation26 252373 PRS 00 IRClosed
Property Standards
Oct 9, 2026 · 15 GIBBS RD - By-law investigation26 252369 PRS 00 IRClosed
Property Standards
Oct 9, 2026 · 15 GIBBS RD - By-law investigation26 247202 PRS 00 IRClosed
Property Standards
Sep 30, 2026 · 15 GIBBS RD - Zoning review26 225467 LPRClosedAug 25, 2026 · 15 GIBBS RD
- Building permit26 195411Permit Issued
Proposed interior alterations for fit-out of shell unit into dental office
Aug 10, 2026 · 300-304 THE EAST MALL
Show 85 older records
- By-law investigation26 173961 WST 00 IRClosed
Waste
May 29, 2026 · 300 THE EAST MALL - Building permit26 122573Approved
Code Analysis for Proposed Alternative Solution for the Omission of Fire Hose Cabinets;
Feb 27, 2026 · 300-304 THE EAST MALL - Building permit21 193930Closed
Conditional Permit - Phase 1 Tower D - 11-storey mixed-use building containing 217 residential rental units, 1292 square metres of non-residential gross floor area on the first floor and one level of underground parking.
Jun 4, 2025 · 300-304 THE EAST MALL - Building permit21 243797Closed
Conditional Permit - Phase 1 Tower A - 30-storey rental apartment building containing 277 residential rental units sitting on top underground garage. Underground garage is part of Phase 1 Tower D.
Apr 17, 2025 · 300-304 THE EAST MALL - Zoning review25 131323 ZZUClosedMar 19, 2025 · 300-304 THE EAST MALL
- Building permit25 126693Application On Hold
PHASE 2 - Construct new 21vstorey residential building with 233 rental units, which include 155 affordable housing units.
Mar 10, 2025 · 300-304 THE EAST MALL - Building permit24 250370Approved
Alternative Solution for proposed not to install 30 m lengths of 38 mm hoses in cabinets throughout the proposed building. In lieu of hose stations (i.e. cabinets), the building is proposed to be provided with 65 mm hose connections, which will be located at the main landing in each exit stair enclosure and in the floor areas, where required to achieve floor area hose coverage. It is proposed to install the standpipe system in accordance with the City of Toronto pre-approval conditions. See the LRI Alternative Solution Report #28454 for full text.
Dec 13, 2024 · 300-304 THE EAST MALL - Building permit24 217948Cancelled
Proposal for Sprinkler Design
Sep 25, 2024 · 300 THE EAST MALL - Building permit24 140387Cancelled
1 ground sign**Reliance Construction Toronto**
Apr 25, 2024 · 300 THE EAST MALL - Building permit24 137863Cancelled
Ground Sign**reliance**
Apr 18, 2024 · 300 THE EAST MALL - Building permit23 189692Permit Issued
Proposed: Standalone Geothermal Permit in association with 21-193930 (300-304 THE EAST MALL- EAST TOWER D -PHASE 1)and 21-243797 (300-304 THE EAST MALL - WEST TOWER A-PHASE 1)
Sep 28, 2023 · 300-304 THE EAST MALL - Minor varianceA0236/23EYKApproved
To permit the multi-use development project that will consist of four new buildings - Phase 1 (Tower A and Tower D) and Phase 2 (Tower B and Tower C).
Aug 3, 2023 · 300-304 THE EAST MALL - Zoning review23 134690 ZPRClosedApr 17, 2023 · 300-304 THE EAST MALL
- Zoning review23 125912 ZAPCancelledMar 22, 2023 · 300-304 THE EAST MALL
- Zoning review23 125710 ZAPPending CancellationMar 22, 2023 · 300-304 THE EAST MALL
- Minor varianceA0115/23EYKPending
Proposal for a multi use development project with 4 new buildings - Phase 1, Tower A and Tower D; Phase 2 - Tower B and Tower C
Mar 14, 2023 · 300-304 THE EAST MALL - Building permit22 243797Open
Deferred Fees from folder 21 243797 (RSN-5031393) ZoningProcess RSN 70238412
Apr 14, 2022 · 300-304 THE EAST MALL - Building permit22 193930Open
Deferred Fees from folder 21 193930 (RSN-4972720) ZoningProcess RSN 70238307
Apr 14, 2022 · 300-304 THE EAST MALL - Zoning review21 249539 PSPClosedJan 18, 2022 · 300-304 THE EAST MALL
- Development application21 249539 WET 02 SAFinal Approval Completed
To construct Phase 2 of the multi-building, mixed-use development at 300-304 The East Mall.
Dec 17, 2021 · 300-304 THE EAST MALL · City file - Consent (lot split)B0022/21EYKApproved
To obtain consent to sever the property into two lots and to create easements/rights-of-ways.
Jul 29, 2021 · 300-304 THE EAST MALL - Zoning review20 228956 PSPClosedJun 2, 2021 · 300-304 THE EAST MALL
- Building permit21 134972Closed
Proposal to demolish the existing 9 storey commercial building. See 20 228956 WET 02 SA for future proposal. Convenience address is 304 The East Mall.
May 11, 2021 · 300-304 THE EAST MALL - Building permit21 134968Closed
Proposal to demolish the existing 6 storey commercial building. See 20 228956 WET 02 SA for future proposal. Convenience address is 302 The East Mall.
May 11, 2021 · 300-304 THE EAST MALL - Building permit21 134959Closed
Proposal to demolish the existing 6 storey commercial building. See 20 228956 WET 02 SA for future proposal. Convenience address is 300 The East Mall.
May 11, 2021 · 300-304 THE EAST MALL - Development application20 228956 WET 02 SAFinal Approval Completed
Revised proposal for Phase 1 of the 300-304 The East Mall mixed-use development. Phase 1 consists of a 29-storey rental apartment building with 277 dwelling units (up from 267 units) on the western portion of the site; an 11-storey mixed-use building (up from 10 storeys) fronting The East Mall on the eastern portion of the site, containing 217 dwelling units (up from 130 units) and retail space (1,314 m²); a new central private road; and a new public park on the southeast corner of the site. Phase 1 would include a total of 494 dwelling units and a total gross floor area of 35942 m² (including 1,314 m² of non-residential GFA). A one level underground parking garage and 163 parking spaces are proposed for Phase 1 of the development. (Revised Feb 28, 2023)
Dec 14, 2020 · 300-304 THE EAST MALL · City file - Zoning review18 241669 PRZClosedOct 17, 2018 · 300-304 THE EAST MALL
- Development application18 241669 WET 05 OZClosed
To amend the City of Toronto Zoning By-law No. 569-2013 and the former City of Etobicoke Zoning Code to permit a mixed-use development consisting of one residential building (heights ranging from 6-10 storeys) with ground floor retail on the east side of the site and three residential apartment condominium towers (21, 29 and 37 storeys in height) above a 2-4 storey podium base building on the west side of the site. The development would contain a total of 1,023 residential units (including 27 integrated townhouse units) and a gross floor area of 89,502 m², of which 3,980 m² would be non-residential uses including 2,801m² of office space. A new public park on the south-east portion of the site, a POPS added on the west side of site, a new private road and parking above and below grade are proposed. The existing 9-storey office building on the site would be demolished.
Oct 12, 2018 · 300-304 THE EAST MALL · City file - Building permit18 125355Closed
Interior alteration for office suite, Unit 605.
Mar 21, 2018 · 300-304 THE EAST MALL - Building permit18 100399Permit Issued
Proposed replacement of existing exhaust fans and integration of CO detection system.
Feb 9, 2018 · 300 THE EAST MALL - Zoning review17 157286 ZPRClosedMay 10, 2017 · 300-304 THE EAST MALL
- Building permit17 142249Closed
Proposal for interior alterations to existing office space on the 4th floor - Unit 400, "Starlight".Convenience address is 302 The West Mall.
Apr 24, 2017 · 300-304 THE EAST MALL - Minor varianceA0970/16EYKApproved
To permit a day care facility.
Feb 9, 2017 · 300-304 THE EAST MALL - Building permit16 255748Closed
REBUILD PASSAGEWAY BETWEEN 300 & 302 THE EAST MALL DUE TO STRUCTURAL COLLAPSE
Dec 15, 2016 · 300-304 THE EAST MALL - Building permit14 141917Closed
In conjunction with a six storey office building located on the premises, to erect and display two illuminated wall signs with static copy to be located on the southerly and northerly facing sixth storey building elevation. The proposed signs are to be 11.76 metres wide by 1.91 metres long at a height of 25.17 metres, respectively. **Pace Law**
Nov 24, 2016 · 300-304 THE EAST MALL - Building permit15 266590Closed
Permit to demolish collapsed suspended concrete slab & supporting wall due to unsafe conditions.
Oct 14, 2016 · 300-304 THE EAST MALL - Building permit16 216844Closed
Repairs to vent shaft and localized affected slab areas at levels P1, P2 and P3 below grade
Sep 12, 2016 · 300-304 THE EAST MALL - Building permit16 173571Closed
Proposal for replacement of guards and handrails of existing interconnected floor space, non exit stairs.
Jun 28, 2016 · 300-304 THE EAST MALL - Zoning review16 139970 ZPRClosedApr 13, 2016 · 300-304 THE EAST MALL
- Building permit15 256542Closed
Interior Alterations - Unit 100 - The East MallAdministrative office.
Dec 7, 2015 · 300 THE EAST MALL - Building permit15 126613Closed
To erect and display one illuminated single sided ground sign with a static copy, located along the west facing property frontage, directed towards and parallel to Highway 427, in conjunction with a fitness centre located on the premises. The proposed sign is 2.45 metres in length and 6.10 metres in width, at a height of 5.79 metres. **Goodlife Fitness**
May 20, 2015 · 300-304 THE EAST MALL - Building permit14 234156Closed
To complete interior alterations to the existing office suite 308.
Oct 27, 2014 · 300 THE EAST MALL - Building permit14 139218Closed
Proposal for interior alteration to 4th and 5th floor office (unit 400 and 500).
May 5, 2014 · 300-304 THE EAST MALL - Zoning review14 147772 ZSVClosedApr 27, 2014 · 300 THE EAST MALL
- Building permit14 126062Closed
Proposal for interior demo to the exisiting office building.
Mar 24, 2014 · 300 THE EAST MALL - Building permit12 286364Closed
To erect and display an illuminated static copy wall sign at the northerly facing seventh storey penthouse level of the building in conjunction with an existing business operating on the premises. **Wishabi**
Dec 4, 2012 · 300-304 THE EAST MALL - Zoning review12 276237 LPRClosedNov 8, 2012 · 300-304 THE EAST MALL
- Building permit12 234408Closed
Repairs to garage slab and expansion joints between (2) office buildings
Sep 25, 2012 · 300-304 THE EAST MALL - Building permit12 199387Closed
Interior alterations to unit 100 for "Ontario Tire Stewardship"
Jul 24, 2012 · 300-304 THE EAST MALL - Building permit12 179857Closed
Interior alterations to Unit #305, to create a business office for 'Hopewell Development Inc".
Jun 14, 2012 · 300-304 THE EAST MALL - Building permit11 290179Closed
interior alterations to reception area and boardroom (302 THE EAST MALL, SUITE 200)
Nov 1, 2011 · 300-304 THE EAST MALL - Zoning review11 267126 ZSVClosedAug 31, 2011 · 300-304 THE EAST MALL
- Building permit11 113920Closed
installation of one 3" backflow prevention device
Jan 28, 2011 · 300-304 THE EAST MALL - Building permit10 226348Closed
Alterations to existing office space on 2nd, 3rd, 6th, 9th and Concourse Level for new tenant *SNC Lavalin O & M*
Aug 13, 2010 · 300-304 THE EAST MALL - Building permit09 126182Closed
Installation of on Electromagnetic Lock to second floor of an Office building.
Apr 28, 2009 · 300-304 THE EAST MALL - Zoning review07 258941 ZPUClosedSep 5, 2007 · 300-304 THE EAST MALL
- Building permit06 136983Closed
Plumbing - Interior alteration to convert an existing office space into a new computer room with raised floor.
Jul 26, 2006 · 300-304 THE EAST MALL - Zoning review06 144220 ZPRClosedJun 8, 2006 · 300-304 THE EAST MALL
- Zoning review06 118640 ZPUClosedMar 20, 2006 · 300-304 THE EAST MALL
- Building permit05 146070Closed
Barrier free access ramp to commercial building
Jun 30, 2005 · 300-304 THE EAST MALL - Building permit04 190679Closed
interior alterations to existing office building (Suite 500)
Jan 5, 2005 · 300-304 THE EAST MALL - Building permit04 105471ClosedJan 28, 2004 · 300-304 THE EAST MALL
- Building permit03 202265Inspection
Install 4 Maglocks on the 5th floor of existing commercial building for Unit #: 304.
Jan 21, 2004 · 300-304 THE EAST MALL - Building permit03 152953Cancelled
INTERIOR ALTERATIONS TO "PROTAC" OFFICES, second floor
Nov 28, 2003 · 300-304 THE EAST MALL - Building permit03 188555Closed
Interior alteration to existing office building.
Nov 17, 2003 · 300-304 THE EAST MALL - Building permit03 180363Cancelled
Interior alterations to office on 2nd floor
Sep 30, 2003 · 300-304 THE EAST MALL - Building permit03 103048Closed
Interior alterations to create new washroom to the main lobby in an office building
Sep 30, 2003 · 300-304 THE EAST MALL - Zoning review03 133390 ZSVClosedMay 15, 2003 · 300-304 THE EAST MALL
- Zoning review03 116214 ZPRClosedMar 19, 2003 · 300-304 THE EAST MALL
- Building permit03 109096Closed
Interior alterations to office unit # 301 in an office building.
Mar 4, 2003 · 300-304 THE EAST MALL - Building permit02 196013Inspection
HVAC - Interior alterations to the 5th floor for an office building. HVAC and Plumbing permits to follow. - Interior Alterations
Feb 24, 2003 · 300-304 THE EAST MALL - Building permit03 103029Closed
Interior alterations to offices ( 2nd floor )
Feb 20, 2003 · 300-304 THE EAST MALL - Building permit03 100523Closed
Interior alterations to existing office unit (suit # 200 ) on the second floor.
Jan 15, 2003 · 300-304 THE EAST MALL - Building permit02 140960Closed
*Smuckers* Office interior alterations (3rd Floor)
Jul 2, 2002 · 300-304 THE EAST MALL - Building permit02 120520Closed
Interior alterations to office building - 4th, 6th, 7th floor
Apr 15, 2002 · 300-304 THE EAST MALL - Building permit01 134146Closed
Partial 2nd lfoor interior alterations to general office for *Nexacor Realty Management*. HVAC & Plumbing included.
May 7, 2001 · 300-304 THE EAST MALL - Building permit01 125891Closed
Demising wall to the second floor (existing office space) into office building.Future interior alteration permit is required before any occupancy.
May 4, 2001 · 300-304 THE EAST MALL - Building permit01 116880Closed
One electromagnetic lock to office building.
Mar 30, 2001 · 300-304 THE EAST MALL - Building permit01 111215Closed
1 mag lock to office building - 6th floor.
Mar 8, 2001 · 300-304 THE EAST MALL - Building permit01 100223Closed
Interior alterations to the second and 6th floors for office building. HVAC & Plumbing included.
Feb 9, 2001 · 300-304 THE EAST MALL - Building permit00 356663Closed
Interior alterations to office building. HVAC included. Unit 402.
Jan 31, 2001 · 300-304 THE EAST MALL - Building permit00 127276Closed
Interior Alterations to existing office building ( 5th floor)
Mar 3, 2000 · 300-304 THE EAST MALL - Building permit98 085644Closed
''TRANSGLOBAL'' OFFICE INTERIOR ALTERATION
May 22, 1998 · 300 THE EAST MALL - Building permit98 085948Closed
HVAC TO OFFICE BUILDING
Feb 23, 1998 · 300 THE EAST MALL - Building permit98 085947Closed
HVAC TO OFFICE BUILDING
Feb 23, 1998 · 300 THE EAST MALL
Check before you build
Site-specific exception 900.11.10(267)
Needs a closer look22 site-specific rules apply to this lot. They can override the standard rules on this page. 1 part is limited to an area drawn on a by-law diagram; check whether this lot is in it.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A · diagram area
On 300 to 304 The East Mall, if the requirements of Section 9 and Schedule A of By-law 175-2021 are complied with, buildings and structures may be constructed or used in compliance with
- Rule B
to (W) below; (B) For the purposes of this exception: (i) the lot is the lands outlined by heavy black lines on Diagram 1 of By-law 175-2021; and (ii) 'Area 1' and 'Area 2' are defined to include the corresponding area within the lot as identified on Diagram 1 of By-law 175-2021
- Rule C
Despite regulation 40.10.20.40(1), dwelling units are permitted in a mixed use building
- Rule D
Despite regulation 40.10.40.40(1): (i) the permitted maximum gross floor area of all buildings and structures is 90,000 square metres; (ii) the permitted maximum gross floor area for residential uses is 86,000 square metres; (iii) the required minimum gross floor area for non-residential uses is 4,000 square metres; and (iv) within 'Area 1', any storey of Tower 'A', 'B' and 'C' as identified in Diagram 3 of By-law 175-2021, above a height of 16 metres must not have a gross floor area exceeding 750 square metres and for clarity this does not apply to buildings in 'Area 2'
- Rule E
In addition to the building elements listed in regulations 40.5.40.40(3) and (5), the gross floor area of a mixed use building and an apartment building is also reduced by the areas in a building used for: (i) public parking , inclusive of ramps and aisles below-ground; (ii) hallways and elevator vestibules below-ground; and (iii) electrical, utility, mechanical and ventilation rooms on any level of the building
- Rule F
Despite regulations 40.5.40.10(1) and (2), the height of a building or structure is the distance between the Canadian Geodetic Datum elevation of: (i) 132.36 metres in the year 2021 and the elevation of the highest point of the building or structure for 'Area 1' on Diagram 1; and (ii) 132.44 metres in the year 2021 and the elevation of the highest point of the building or structure for 'Area 2' on Diagram 1
- Rule G
Despite regulation 40.10.40.10(3), the permitted maximum height of a building or structure is the height in metres specified by the numbers following the symbol "HT" on Diagram 3 of By-law 175-2021
- Rule H
Despite (G) above, and regulations 40.5.40.10(4), (5), (6), (7) and (8) and 40.5.751(2)(A)(ii), the following elements of a building may project above the permitted maximum building heights shown on Diagram 3 of By-law 175-2021: (i) structures and elements related to outdoor flooring and roofing assembly, safety railings, guard rails, railings, parapets, terraces, planters, balustrades, bollards, stairs, retaining walls, and ornamental features may project above the height limits by no more than 2.0 metres; (ii) elements on the roof of the building or structure used for green roof technology and related roofing material may project above the height limits by no more than 2.0 metres; (iii) acoustical barriers, landscape features, privacy screens, terrace dividers, covered stairs or stair enclosures, and fences may project above the height limits by no more than 2.75 metres; (iv) cabanas and trellises may project above the height limits by no more than 3.6 metres; (v) photovoltaic solar energy devices and sunlight collection and distribution devices (sun beamers) may project above the height limits by no more than 5 metres; (vi) any equipment or structures used for the functional operation of the building , including mechanical penthouse, mechanical elements, garbage chutes, vents, emergency generators, lighting fixtures, mechanical screening and heating/cooling towers may project above the height limits by no more than 7.0 metres; and (vii) window washing equipment, lightning rods, wind mitigation features, elevator overrun and public art features may project above maximum building heights
- Rule I
Despite regulations 40.10.40.70(3), 40.10.40.70(4) and 40.10.40.80(2), the required minimum building setbacks and above-ground separation distance between main walls are as shown on Diagram 3 of By-law 175-2021
- Rule J
Despite (I) above and regulations 40.10.40.60(1) to (9), the following encroachments are permitted into the required minimum building setbacks and above-ground separation distance between main walls on Diagram 3 of By-law 175-2021: (i) balconies may encroach no more than 2.0 metres into the minimum building setbacks required by (I); (ii) cladding, photovoltaic solar energy devices, wind mitigation features, canopies, awnings, building cornices, window washing equipment, terraces, lighting fixtures, ornamental elements, lightning rods, trellises, eaves, window sills, stairs, stair enclosures, air intakes and vents, ventilating equipment, landscape and green roof elements, partitions dividing outdoor recreation areas, privacy screens, acoustical walls, wind mitigation elements, chimney stack, and exhaust flues may encroach no more than 2.5 metres into the minimum building setbacks required by (I); and (iii) public art features
- Rule K
No portion of a building, excluding those features listed in (H) or (J) above, may penetrate a 45-degree angular plane projected over the lot , starting at a line along a lot line of any lot in the O, ON or OR zone or the Residential Zone category or Residential Apartment Zone category, at the average elevation of ground of such lot line .
- Rule L
Despite regulation 200.5.10.1(1) and Table 200.5.10.1, parking spaces must be provided and maintained on the lot in accordance with the following: (i) parking spaces for residents must be provided in accordance with the following minimum rates: (a) 0.7 parking spaces per dwelling unit for each bachelor dwelling unit ; (b) 0.8 parking spaces per dwelling unit for each one bedroom dwelling unit ; (c) 0.9 parking spaces per dwelling unit for each two bedroom dwelling unit ; and (d) 1.1 parking spaces per dwelling unit for each three or more bedroom dwelling unit ; (ii) Two (2) parking spaces required for 'all other non-residential uses' in Table 1 must be provided exclusively for the community use provided in accordance with Schedule A attached to By-law 175-2021 and must be: (a) clearly identified and marked; and (b) available without a fee; (iii) Parking spaces for all other uses must be provided in accordance with Table 1 attached to By-law 175-2021 and (iv) below; (iv) the minimum number of parking spaces as required in Table 1 attached to By-law 175-2021 is determined as follows: (a) for each of the morning, afternoon and evening parking periods identified in the table above, the minimum number of parking spaces required for each use is calculated using the respective parking space rate and occupancy rate; (b) the minimum number of parking spaces required for each parking period is the total of the parking spaces required for all uses during that parking period; and (c) the minimum number of parking spaces required for all uses on the lot , other than parking spaces required for residents by (L)(i) above, is equal to the largest number of parking spaces required for any parking period; (v) All parking spaces must be located within a parking garage with a maximum of 13 surface parking spaces
- Rule M
Parking spaces must be provided in accordance with regulation 40.5.80.1(1), with the exception that parking spaces provided pursuant to (L)(ii) above, may be provided on a non-exclusive basis and may be provided within a public parking use on the lot
- Rule N
Despite subsection (L) above, the minimum number of resident parking spaces required may be reduced by 4 parking spaces for each 'car share parking space' provided, up to a maximum of 1 'car-share parking space' per 60 dwelling units
- Rule O
Bicycle parking spaces must be provided on the lot in accordance with the following: (i) At least 0.68 long-term residential bicycle parking spaces for each dwelling unit ; (ii) At least 0.07 short-term residential bicycle parking spaces for each dwelling unit ; (iii) Despite 230.5.10.1, no bicycle parking spaces are required for non-residential uses with the exception of office uses which require: (a) at least 0.13 bicycle parking spaces per 100 square metres of office gross floor area shall be provided as long-term bicycle parking spaces for the office use; and (b) at least 3 bicycle parking spaces plus 0.15 bicycle parking spaces per 100 square metres of office gross floor area shall be provided as short-term bicycle parking spaces for the office use; (iv) Despite regulation 230.5.1.10(7), no shower and change facilities are required; (v) Despite regulation 230.5.1.10(9), long-term and short-term bicycle parking spaces for dwelling units or for non-residential uses may be located above or below ground in the building ; (vi) Despite regulation 230.5.1.10(10), long-term and short-term bicycle parking spaces for dwelling units or for non-residential uses may be provided in any combination of vertical, horizontal or stacked positions; and (vii) Despite regulation 230.40.1.20(2), a short-term bicycle parking space may be located more than 30 metres from a pedestrian entrance to the building on the lot , with the grade not exceeding a 2 percent slope and may be located in a secured room or an unsecured room
- Rule P
Despite regulation 200.15 and By-law 579-2017, accessible parking spaces must be provided on the lot as follows: (i) accessible parking spaces must have the following minimum dimensions: (a) length of 5.6 metres; (b) width of 3.4 metres; and (c) vertical clearance of 2.1 metres; (ii) the entire length of an accessible parking space must be adjacent to a minimum 1.5 metre wide accessible barrier free aisle or path; and (iii) a maximum of 11 accessible parking spaces are exempt from the location requirements in regulation 200.15.1(4)
- Rule Q
Despite the requirements of regulation 220.5.10.1, loading spaces must be provided and maintained on the lot in accordance with the following minimum amounts: (i) one (1) Type "G" loading space and three (3) Type "C" loading spaces must be provided within 'Area 1'; and (ii) one (1) Type "G" loading space must be provided within 'Area 2'
- Rule R
Despite regulation 40.10.40.10(5): (i) the minimum height of the first storey for the portion containing non-residential uses is 4.0 metres, measured from the top of slab of the floor of the first storey to the top of slab of the floor above; and (ii) there is no minimum height requirement for residential uses on the first storey
- Rule S
Despite regulation 40.10.40.1 (1), residential dwelling units may be located on the same level as commercial units in 'Building 2' as shown in Diagram 3 to By-law 175-2021
- Rule T
At least 20 percent of the dwelling units on the entire lot must contain two bedrooms
- Rule U
At least 10 percent of the dwelling units on the entire lot must contain three bedrooms
- Rule V
A maximum of 1,035 dwelling units are permitted on the entire lot
- Rule W
Regulation 40.10.50.10(1)(B)(i) regarding landscaping does not apply.
Lot facts
- Area
- 7,948 m²
- Frontage
- 100.2 mestimated, irregular lot
- Depth
- 118.2 mestimated, irregular lot
- Street
- Gibbs Rd
- Corner lot
- Yes, also on The East Mall118.2 m along it
- Public lane
- None
- House footprint
- 1,079 m²roof up to 42 m
- Back yard
- 67.6 mhouse to rear lot line
- Side yards
- 7.7 m and 41.5 mhouse to side lot lines
- Buildings on the lot
- 12house, garage, sheds
- Max height
- 11 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone CR 0.4 (c0.4; r0.0) SS3 (x267) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%9 of 9 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 2
- Development applications
- 6
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit the multi-use development project that will consist of four new buildings - Phase 1 (Tower A and Tower D) and Phase 2 (Tower B and Tower C).
300-304 THE EAST MALL · Aug 3, 2023 · 33 m away - Minor varianceApproved
To construct a 40-storey building (Building D) and a 44-storey building (Building E) both above a 4 -storey podium (Phase 2 of the mixed use development).
2 GIBBS RD · May 25, 2023 · 83 m away - Minor varianceApproved
To permit a day care facility.
300-304 THE EAST MALL · Feb 9, 2017 · 33 m away
Latest activity nearby
- Building permit
REV 01: Revision to floor plan as per bubbled drawingsProposed interior alterations for pharmacy and medical office
300-304 THE EAST MALL · Nov 24, 2026 · 33 m away - Building permit
Part Permit - PHASE 2 - Construct new 39 storey residential building with 438 rental units, including 4 storey podium and 2 levels of u/g parking garage - Tower B - Market Building
300-304 THE EAST MALL · Nov 23, 2026 · 33 m away - Building permit
Proposal for construction of new 3 storey replacement elementary school and childcare center, complete with associated underground parking, site servicing, play areas and landscaping.
5 REDCAR AVE · Oct 30, 2026 · 278 m away - Building permit
Proposal for 2-storey front and rear additions to an existing two-storey detached house, with an intagral garage and a rear balcony. Also, proposed secondary suite in the basement, with a side basement walkout.
282 THE EAST MALL · Sep 14, 2026 · 227 m away - Zoning review
Closed
15 GIBBS RD · Aug 25, 2026 · 3 m away - Building permit
Proposed interior alterations for fit-out of shell unit into dental office
300-304 THE EAST MALL · Aug 10, 2026 · 33 m away - Minor varianceApproved
To construct a two-storey north and south side addition that will include an attached garage and to convert the existing basement into a secondary suite with a basement walk-out.
282 THE EAST MALL · Jun 25, 2026 · 227 m away - Building permit
Code Analysis for Proposed Alternative Solution for the Omission of Fire Hose Cabinets;
300-304 THE EAST MALL · Feb 27, 2026 · 33 m away - Zoning review
Closed
282 THE EAST MALL · Feb 19, 2026 · 227 m away - Consent (lot split)Approved
To obtain consent to sever the property into 5 lots and to create various easements/ right-of-ways.
2 GIBBS RD · Jul 10, 2025 · 83 m away
Neighbourhood: Islington
About the area around the lot, not the lot itself.
- Nearest station
- Kipling Station29 min walk
- Nearest TTC stop
- The East Mall at Bloor St West1 min walk
- Nearest cycling route
- Renforth DrBike Lane, 9 min walk
- Nearest traffic count
- 17,771 vehicles in 14 hGibbs Rd / The East Mall, 90 m away, Nov 5, 2024
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- East Mall Park6 min walk
- Leavenworth Parkette7 min walk
- Dennis Flynn Park10 min walk
Schools within 1 km
- BLOORLEA MDL SCHOOL English Public 3 min walk
- ST ELIZABETH CATHOLIC ELEMENTARY SCHOOL English Separate 5 min walk
- ETOBICOKE SECONDARY ALTERNATIVE SCHOOL English Public 11 min walk
- EATONVILLE JR SCHOOL English Public 11 min walk
- TORONTO DISTRICT SCHOOL BOARD - WEST EDUCATION OFFICE English Public 12 min walk
- KINGSLEY PRIMARY SCHOOL Private 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Islington | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $102,000 | $84,500 |
| Households that own their home | 68% | 54% |
| Population (2021) | 23,460 | 16,813 |
| Homes built in 1960 or before | 32% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Islington | City median |
|---|---|---|
| Assault | 389.6 | 636.3 |
| Robbery | 39.3 | 69.5 |
| Homicide | 3.6 | 5.3 |
| Shootings | 3.6 | 10.5 |
| Auto theft | 171.6 | 192.6 |
| Theft over $5,000 | 53.6 | 46.1 |
| Break and enter | 293.1 | 172.8 |
| Theft from vehicles | 143 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.