HousePrecheckCheck an address

15 Ethel AveToronto · zoning, lot size and permit records

Also 17 Ethel Ave, 23 Ethel Ave, 27 Ethel Ave, 35 Ethel Ave, 45 Ethel Ave and 11 more

Employment · E 1.0 (x285)≈ 382.6 × 87.9 m20,397 m²on Ethel Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 24 251826 (Proposal to construct a new 34 storey residential building with 2 levels of underground..., 2024); 24 251755 (Proposal to construct a new 31 storey mixed used building with a 7 storey podium, 2 lev..., 2024); 25 186132 WET 05 SA (Proposed redevelopment of the site will be comprised of (i) buildings A and B; and (ii)..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 26 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N50 m
≈ 382.6 m frontage≈ 87.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 251826 (Proposal to construct a new 34 storey residential building with 2 levels of underground..., 2024); 24 251755 (Proposal to construct a new 31 storey mixed used building with a 7 storey podium, 2 lev..., 2024); 25 186132 WET 05 SA (Proposed redevelopment of the site will be comprised of (i) buildings A and B; and (ii)..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. B0083/18EYK (Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-T..., 2018); B43/07EYK (To sever the property into 2 lots and to create an easement/right-of-way. Conditions me..., 2007).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 26 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

12 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review25 186132 PSPClosed
    Oct 15, 2025 · 87 ETHEL AVE
  • Zoning review25 185941 ZAPNotice Sent
    Jun 30, 2025 · 87 ETHEL AVE
  • Development application25 186132 WET 05 SAUnder Review

    Proposed redevelopment of the site will be comprised of (i) buildings A and B; and (ii) buildings C and D which will consist of 7,238.8 sq.m/77,919 sq.ft of non-residential uses or 7.14% of the total GFA will provide for offices, retail, services, restaurants, entertainment and other uses including a 468sq.m/5,038sq.ft community space.

    Jun 30, 2025 · 87 ETHEL AVE · City file
  • Building permit24 251826Examiner's Notice Sentnew building

    Proposal to construct a new 34 storey residential building with 2 levels of underground parking and 297 residential units - TOWER BSee also 13 222698 WET 11 SA.

    Dec 18, 2024 · 87 ETHEL AVE
  • Building permit24 251755Examiner's Notice Sentnew building

    Proposal to construct a new 31 storey mixed used building with a 7 storey podium, 2 levels of underground parking, ground floor retail and 432 residential units - TOWER ASee also 13 222698 WET 11 SA.

    Dec 18, 2024 · 87 ETHEL AVE
  • Zoning review19 179771 ZZUClosed
    Jun 27, 2019 · 87 ETHEL AVE
  • Consent (lot split)B0083/18EYKApproved

    Section 57(1) of The Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.dcampanella@parenteborean.com

    Oct 25, 2018 · 87 ETHEL AVE
  • Zoning review16 271272 PRZClosed
    Oct 24, 2017 · 87 ETHEL AVE
Show 4 older records
  • Development application16 271272 WET 11 OZClosed

    Proposed redevelopment of the site with a combination of mixed-use and residential buildings.

    Dec 28, 2016 · 87 ETHEL AVE · City file
  • Zoning review13 230973 PSPClosed
    Sep 5, 2013 · 87 ETHEL AVE
  • Zoning review12 246978 ZPRClosed
    Sep 14, 2012 · 87 ETHEL AVE
  • Consent (lot split)B43/07EYKApproved

    To sever the property into 2 lots and to create an easement/right-of-way. Conditions met. Certificate issued on February 19, 2008. Reference Plan 66R-23468.

    May 3, 2007 · 87 ETHEL AVE

Check before you build

  • Site-specific exception 900.20.10(285)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(285)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 292 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
20,397 m²
Frontage
382.6 mestimated, irregular lot
Depth
87.9 mestimated, irregular lot
Street
Ethel Ave
Corner lot
No
Public lane
None
Max height
14 m
Max lot coverage
—
  • Site and Area Specific Policy 537. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Zone E 1.0 (x285) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 39 City trees in front of this lot. The City's street tree inventory lists 39 trees at this address: maple, norway (45 cm), maple, norway (42 cm), maple, norway (40 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%13 of 13 decisions
Garden suite permits
0
Laneway suite permits
4
Multiplex permits
4
Development applications
4

Within 300 m, last 10 years. 8 suite and multiplex permits: more than at 70% of Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To change the use of the building from a single tenant industrial to multi-tenant industrial with fire safety upgrades.

    142-144 VINE AVE · Oct 24, 2019 · 383 m away

Latest activity nearby

  • Building permit

    backwater valve installation

    585 CLENDENAN AVE · Jun 29, 2026 · 162 m away
  • Zoning review

    Closed

    2129 ST CLAIR AVE W · Jun 10, 2026 · 248 m away
  • Building permit

    Proposal for installation of new backflow preventer.

    2129 ST CLAIR AVE W · May 13, 2026 · 248 m away
  • Zoning review

    Closed

    116 RYDING AVE · May 7, 2026 · 260 m away
  • Development application

    Proposed applications to permit a mixed-use development on the subject site consisting of two buildings comprised of three towers of 20, 34 and 26 storeys. The proposed development also includes a new park, equivalent to 10% of the site area, to be created via parkland dedication and space for a potential child care centre.

    116 R RYDING AVE · Mar 3, 2026 · 242 m away · City file
  • Building permit

    Installation of free-standing rack storage system in existing retail store/warehouse.

    2129 ST CLAIR AVE W · Feb 9, 2026 · 248 m away
  • Zoning review

    Closed

    87 ETHEL AVE · Oct 15, 2025 · 30 m away
  • Building permit

    Rev 01: revision to add underpinning of existing foundation wallsProposed rear yard addtion and interior alterations to a single family dwelling which includes underpinning, sump pump, back water valve installation; and proposed rear deck, and rear canopy addition.

    565 CLENDENAN AVE · Oct 2, 2025 · 211 m away
  • Building permit

    1 WALL SIGN**SALLY BEAUTY**

    2151 ST CLAIR AVE W · Aug 20, 2025 · 257 m away
  • Building permit

    Proposal for interior alteration to convert the attic space into a bedroom and adding a 3rd floor balcony.

    499 QUEBEC AVE · Jul 2, 2025 · 266 m away

Neighbourhood: Junction Area

About the area around the lot, not the lot itself.

Nearest station
High Park Station28 min walk
Nearest TTC stop
Old Stock Yards Rd at West Toronto St4 min walk
Nearest cycling route
Ryding AveBike Lane - Contraflow, 5 min walk
Nearest traffic count
338 vehicles in 8 hClendenan Ave / Maria St, 250 m away, May 12, 2022
Serious collisions within 500 m
22021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Runnymede Park3 min walk
Vine Avenue Playground4 min walk
Malta Park6 min walk

Schools within 1 km

  • ANNETTE ST JR SR & HIGH PARK ALTERNATIVE JR English Public 13 min walk
  • IQRA NEJASHI ISLAMIC SCHOOL Private 14 min walk
  • ST CECILIA CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • THE GREAT LAKES COLLEGE SCHOOL Private 15 min walk
  • HARWOOD PUBLIC SCHOOL English Public 15 min walk
  • HUMBERSIDE COLLEGIATE INSTITUTE English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureJunction AreaMedian neighbourhood
Median household income (2020)$96,000$84,500
Households that own their home58%54%
Population (2021)14,01016,813
Homes built in 1960 or before55%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleJunction AreaCity median
Assault908.1636.3
Robbery74.669.5
Shootings6.210.5
Auto theft236.4192.6
Theft over $5,00087.146.1
Break and enter304.8172.8
Theft from vehicles578.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.