HousePrecheckCheck an address

15 Basin StToronto · zoning, lot size and permit records

Also 21 Basin St

153.3 × 104.9 m16,076 m²on Basin St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • 2 development applications open within 300 m, up to 45 storeysNew buildings may go up around here in the next years. More change nearby than at 81% of Toronto houses.
N50 m
153.3 m frontage104.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 45 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Development application16 200896 STE 30 SAClosed

    Castlepoint Numa, on behalf of Toronto Waterfront Studios Development Inc. (TWDSI), has submitted a Site Plan Control application (#16-200896 STE 30 SA) to develop the lands at 101 Commissioners Street and 1 and 17 Basin Street with a 3-storey, 6,724 square metre office building (purpose built film and television support facility) with broadcasting and communication uses, and office uses, and a temporary surface parking lot for 95 parking spaces. The site is located within Pinewood Toronto Studies and the site is owned by the Toronto Port Lands Company (TPLC). A related application for consent, in order to support the long-term lease agreement between the TWSDI and TPLC, has also been submitted to the City.

    Aug 3, 2016 · 17 BASIN ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
16,076 m²
Frontage
153.3 m
Depth
104.9 m
Street
Basin St
Corner lot
No
Public lane
None
House footprint
4,935 m²roof up to 18 m
Back yard
25.1 mhouse to rear lot line
Side yards
21.9 m and 69.2 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    4

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit a communications and broadcasting establishment.

      29 BASIN ST · May 17, 2018 · 170 m away
    • Minor varianceApproved

      This site incorporates a large tract of land on the south side of Commissioners Street in the Portlands district and presently contains a fuel tank distribution terminal, storage Warehouse Class "A" and vacant land. Relief from the provisions of Zoning By-law No. 438-86, as amended, is being requested to develop these lands with a communications and broadcasting establishment and associated uses. An accompanying application (C of A File No. B0063/05TEY) seeks the consent of the Committee of Adjustment to allow the owner of these lands, City of Toronto Economic Development Corporation (TEDCO), to enter into a long-term lease with Toronto Film Studios for a portion of the lands identified as No. 101 Commissioners Street and 1 and 17 Basin Street.

      101 COMMISSIONERS ST · Jun 15, 2005 · 259 m away
    • Minor varianceApproved

      Maintain a trailer and storage shed having dimensions of 3.05 by 12.19 metres on the existing vacant land, for use as a sales and hire garage.

      1 BASIN ST · Aug 22, 2001 · 120 m away

    Latest activity nearby

    • Building permit

      1 Wall Sign**createTO**

      29 BASIN ST · Feb 7, 2025 · 170 m away
    • Building permit

      1 Wall Sign**createTO**

      29 BASIN ST · Jan 20, 2025 · 170 m away
    • Development application

      Official Plan Amendment for a 40 and 45-storey mixed-use buildings containing 937 residential dwellings, including 42 affordable units, retail, self-storage and a PIC / data centre uses.

      280 COMMISSIONERS ST · Dec 4, 2024 · 272 m away · City file
    • Building permit

      1 wall sign**Create TO**

      29 BASIN ST · Nov 28, 2024 · 170 m away
    • Building permit

      Proposal for interior alterations

      225 COMMISSIONERS ST · Jul 22, 2024 · 174 m away
    • Building permit

      To erect and display four first party signs, illuminated and displaying static copy, with the following details:Sign 1 is a ground sign, with three faces, located on the north frontage, along Commissioners St- Face 1 dimensions: 1.91m L x 3.34m W - Face 2 dimensions: 2.76m L x 1.91m W- Face 3 dimensions: 1.91m L x 21.56m WSign 2 is a wall sign, with a face measuring 0.97m vertically by 13.99m horizontally, located at the mechanical penthouse, on the north elevation.Sign 3 is a projecting sign, with a face measuring 11.63m vertically by 0.85m horizontally , located from the third to the uppermost storeys, on the west elevation.Sign4 is a wall sign, with a face measuring 4.07m vertically by 2.94m horizontally, located at the mechanical penthouse, on the west elevation.**PINEWOOD TORONTO STUDIOS**(See ZMP #22-205441).

      225 COMMISSIONERS ST · Apr 28, 2023 · 174 m away
    • Building permit

      To erect and display one illuminated ground sign, displaying static copy, with two sign faces, located on the east frontage, parallel to Bouchette Street.Sign face 1 dimensions: 1.63m L x 2.81m W x 0.46m D; at a height of 6.01mSign face 2 dimensions: 2.61m L x 1.83m W x 0.46m D; at a height of 4.02m****PINEWOOD STUDIOS****

      301 COMMISSIONERS ST · Apr 27, 2023 · 173 m away
    • Development application

      Site Plan Approval for a film and television studio campus with 44,504 square metres of development with twelve sound stages, production offices, mill and support spaces, vehicular and bicycle parking in an above grade garage, and associated base camp and backlot facilities.

      29 BASIN ST · Mar 15, 2023 · 208 m away · City file
    • Building permit

      Revision 01 - Addition of a domestic cold water makeup provision for the site irrigation system.Plumbing - Proposed to construct 3 Storey Building comprised of 3 sound stages for Media Production, two support workshops, and office.

      101 COMMISSIONERS ST · Feb 21, 2023 · 259 m away
    • Zoning review

      Closed

      225 COMMISSIONERS ST · Sep 19, 2022 · 174 m away

    Neighbourhood: South Riverdale

    About the area around the lot, not the lot itself.

    Nearest TTC stop
    Commissioners St at Saulter St3 min walk
    Nearest cycling route
    Commissioners StCycle Track, 3 min walk
    Nearest traffic count
    5,109 vehicles in 14 hSaulter St S / Commissioners St, 210 m away, Oct 6, 2026
    Serious collisions within 500 m
    02021–2026, killed or seriously injured
    Parks
    Biidaasige Park5 min walk
    McCleary Park6 min walk
    Cherry Beach Clarke Beach Park8 min walk

    2021 Census

    FigureSouth RiverdaleMedian neighbourhood
    Median household income (2020)$100,000$84,500
    Households that own their home57%54%
    Population (2021)27,81516,813
    Homes built in 1960 or before52%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSouth RiverdaleCity median
    Assault828.7636.3
    Robbery69.369.5
    Shootings3.210.5
    Auto theft217.4192.6
    Theft over $5,00088.246.1
    Break and enter264.7172.8
    Theft from vehicles349.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.