HousePrecheckCheck an address

149 Elmcrest RdToronto · zoning, lot size and permit records

Also 149A Elmcrest Rd, 590 Rathburn Rd

Open space · OR≈ 244.2 × 524.1 m94,819 m²on Elmcrest Rdcorner, also on Rathburn Rd

Not a home

Centennial Park Arena

The City of Toronto's real estate inventory lists Centennial Park Arena here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 19 141052 (Proposal to demolish and remove vacant portable office structure from City park, 2019, status Permit Issued); 17 216962 (Proposal to install CHP container unit (35sq.m.) with associated foundation, generator..., 2017, status Inspection); 12 118722 (HVAC - Proposed interior alterations to front lobby area and renovations to the 50m ind..., 2012, status Inspection); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 244.2 m frontage≈ 524.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (43% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (40% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • 4 building permits open, the oldest since 2007

    Needs a closer look

    Still open in the City's records: 19 141052 (Proposal to demolish and remove vacant portable office structure from City park, 2019, status Permit Issued); 17 216962 (Proposal to install CHP container unit (35sq.m.) with associated foundation, generator..., 2017, status Inspection); 12 118722 (HVAC - Proposed interior alterations to front lobby area and renovations to the 50m ind..., 2012, status Inspection); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (40% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 196653 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation25 196653 PRS 00 IRClosed

    Property Standards

    Jul 19, 2025 · 590 RATHBURN RD
  • Building permit20 103376Closed

    REVISION - changes to pool bulkhead loading requirementsProposal for interior alterations to the existing HVAC system, pool bulkhead upgrades, washroom and staff office upgrades.

    Nov 10, 2020 · 590 RATHBURN RD
  • Building permit19 141052Permit Issueddemolition

    Proposal to demolish and remove vacant portable office structure from City park.

    May 2, 2019 · 149 ELMCREST RD
  • Building permit17 216962Inspection

    Proposal to install CHP container unit (35sq.m.) with associated foundation, generator with the associated slab and related mechanical to existing community centre.

    Sep 12, 2017 · 590 RATHBURN RD
  • Building permit14 221344Closed

    Installation of fire alarm system for recreational building.

    Sep 16, 2014 · 590 RATHBURN RD
  • Building permit12 118722Inspection

    HVAC - Proposed interior alterations to front lobby area and renovations to the 50m indoor swimming pool of the existing Etobicoke Olympium.

    Aug 17, 2012 · 590 RATHBURN RD
  • Building permit07 256492Work Not Started

    Air to Air Heat Recovery unit replacement in an existing recreation centre

    Sep 24, 2007 · 590 RATHBURN RD
  • Building permit06 174961Cancelled

    Interior alterations and life safety upgrades to existing greenhouses and replace existing 5 boilers with 3 new boiler systems

    Sep 12, 2006 · 149 ELMCREST RD
Show 1 older records
  • Building permit00 356884Closed

    Temporary tent from November 27 - 29/2000 inclusive for film shooting.

    Dec 7, 2000 · 590 RATHBURN RD

Lot facts

Area
94,819 m²
Frontage
244.2 mestimated, irregular lot
Depth
524.1 mestimated, irregular lot
Street
Elmcrest Rd
Corner lot
Yes, also on Rathburn Rd524.1 m along it
Public lane
None
House footprint
6,393 m²roof up to 19.8 m
Back yard
121.8 mhouse to rear lot line
Side yards
57.6 m and 85.5 mhouse to side lot lines
Buildings on the lot
11house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 029. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal for multiple projects (second floor addition and interior alterations).

    14 IVYBRIDGE DR · Jul 8, 2026 · 227 m away
  • Minor varianceApproved

    To construct a second storey addition above the existing dwelling.

    14 IVYBRIDGE DR · Jun 11, 2026 · 227 m away
  • Building permit

    Proposal for interior alteration to the ground floor including removal of an existing load-bearing wall and installation of new engineered LVL beams and built-up wood posts, as per structural drawings and Ontario Building Code. There is no change to building footprint.

    12 WARLINGHAM CRT · Jan 21, 2026 · 266 m away
  • Building permit

    Proposal to construct a side deck platform with a roof canopy

    12 WARLINGHAM CRT · Jan 5, 2026 · 266 m away
  • Building permit

    Proposed Interior Alterations, New beam installation in the ceiling

    4 CANEROUTH DR · Apr 26, 2024 · 292 m away
  • Building permit

    REv01- Rear yard basement walkout terraceProposal to construct a new side mudroom addition to existing sfd.

    565 RATHBURN RD · Mar 12, 2024 · 155 m away
  • Building permit

    Proposed washroom enhancements in 2 student washrooms

    580 RATHBURN RD · Oct 25, 2023 · 215 m away
  • Building permit

    Second floor addition and interior alterations

    21 WARLINGHAM CRT · Aug 31, 2023 · 288 m away
  • Zoning review

    Closed

    10 WARLINGHAM CRT · Apr 21, 2022 · 279 m away
  • Zoning review

    Closed

    10 WARLINGHAM CRT · Aug 31, 2021 · 279 m away

Neighbourhood: Eringate-Centennial-West Deane

About the area around the lot, not the lot itself.

Nearest TTC stop
590 Rathburn Rd2 min walk
Nearest cycling route
Centennial Park TrlMulti-Use Trail, 2 min walk
Nearest traffic count
9,814 vehicles in 14 hRathburn Rd / Centennial Park Trl, 150 m away, Jun 16, 2026
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Centennial Park - Etobicoke1 min walk
Elmcrest Park2 min walk
Carsbrooke Park11 min walk

Schools within 1 km

  • SENECA SCHOOL English Public 3 min walk
  • MILL VALLEY JR SCHOOL English Public 11 min walk
  • HOLLYCREST MDL SCHOOL English Public 11 min walk
  • NATIVITY OF OUR LORD CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • WELLESWORTH JR SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEringate-Centennial-West DeaneMedian neighbourhood
Median household income (2020)$108,000$84,500
Households that own their home84%54%
Population (2021)18,45016,813
Homes built in 1960 or before29%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEringate-Centennial-West DeaneCity median
Assault393.3636.3
Robbery29.969.5
Shootings1010.5
Auto theft234192.6
Theft over $5,00024.946.1
Break and enter109.5172.8
Theft from vehicles114.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.