HousePrecheckCheck an address

145 Wedgewood DrToronto · zoning, lot size and permit records

Open space · OR≈ 110.8 × 128.4 m9,786 m²on Wedgewood Drcorner, also on Pheasant Rd

Not a home

Wedgewood Park

The City of Toronto's real estate inventory lists Wedgewood Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 110.8 m frontage≈ 128.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    No permits, applications or Committee of Adjustment files on this lot in the City's open records.

    Lot facts

    Area
    9,786 m²
    Frontage
    110.8 mestimated, irregular lot
    Depth
    128.4 mestimated, irregular lot
    Street
    Wedgewood Dr
    Corner lot
    Yes, also on Pheasant Rd128.4 m along it
    Public lane
    None
    Max height
    —
    Max lot coverage
    —
    • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source

    Around this lot

    Minor variances approved
    95%18 of 19 decisions
    Garden suite permits
    3
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    0

    Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

    Latest activity nearby

    • Building permit

      Proposal for Exterior Renovations - Exterior parking, stairs, curbs and sloped walkway

      205 CUMMER AVE · Nov 2, 2026 · 265 m away
    • Building permitgarden suite

      REV : PERMIT REVSION FOR ACCESSORY BUILDINGApplicant revised the application to an accessory building at rear yard. - Nov 21 2024Proposal to construct a 1 storey garden suite in the rear yard of an existing SFD-detached dwelling.

      61 NORTHWOOD DR · Oct 30, 2026 · 298 m away
    • Building permitsecondary suite

      Proposal for an ADU

      28 PHEASANT RD · Sep 28, 2026 · 106 m away
    • Building permit

      Construct one storey sunroom/greenhouse at rear of house and interior alterations to lower level.

      143 NORTHWOOD DR · Aug 10, 2026 · 295 m away
    • Building permit

      Proposal to construct a below grade entrance for existing single family dwelling.

      266 CUMMER AVE · Jul 13, 2026 · 77 m away
    • Building permit

      Proposed below grade entrance for the already finished personal use basement

      266 CUMMER AVE · Jun 30, 2026 · 77 m away
    • Minor varianceApproved

      To construct a 1 storey addition to the rear of the dwelling.

      143 NORTHWOOD DR · Apr 30, 2026 · 295 m away
    • Building permit

      Proposal to install Back Water Valve

      301 CUMMER AVE · Mar 27, 2026 · 274 m away
    • Building permit

      Proposal for alterations to exterior parking, stairs, curbs and sloped walkways

      205 CUMMER AVE · Mar 26, 2026 · 265 m away
    • Zoning review

      Closed

      143 NORTHWOOD DR · Feb 23, 2026 · 295 m away

    Neighbourhood: Newtonbrook East

    About the area around the lot, not the lot itself.

    Nearest station
    Finch Station21 min walk
    Nearest TTC stop
    285 Cummer Ave - St John's Rehab Hospital2 min walk
    Nearest cycling route
    Newtonbrook Park TrlMulti-Use Trail - Connector, 6 min walk
    Nearest traffic count
    4,192 vehicles in 8 hCummer Ave: Becky Cheung Crt - Willow Heights Crt, 110 m away, Dec 14, 2021
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
    Parks
    Wedgewood Park - North York1 min walk
    Newtonbrook Park5 min walk
    Aneta Circle Parkette8 min walk

    Schools within 1 km

    • CUMMER VALLEY MDL SCHOOL English Public 8 min walk
    • AVONDALE SECONDARY ALTERNATIVE SCHOOL English Public 10 min walk
    • LILLIAN PUBLIC SCHOOL English Public 14 min walk
    • ST AGNES CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
    • ST JOSEPH'S MORROW PARK CATHOLIC SECONDARY SCHOOL English Separate 16 min walk
    • ST ANNE CATHOLIC ACADEMY, SCHOOL OF VIRTUAL LEARNING English Separate 16 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureNewtonbrook EastMedian neighbourhood
    Median household income (2020)$80,000$84,500
    Households that own their home62%54%
    Population (2021)15,34516,813
    Homes built in 1960 or before17%29%
    Homes needing major repairs5%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleNewtonbrook EastCity median
    Assault554636.3
    Robbery60.369.5
    Auto theft252.3192.6
    Theft over $5,00049.446.1
    Break and enter170172.8
    Theft from vehicles170188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.