HousePrecheckCheck an address

145 Mutual StToronto · zoning, lot size and permit records

Commercial residential · CR 4.0 (c0.5; r4.0) SS1 (x1457)≈ 104.1 × 72.1 m3,316 m²on Mutual St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 15 storeys, 145 rental units, built 1985More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 26 121315 (Garage roof waterproofing repairs, work includes concrete repairs, 2026); 25 138092 (Construct a garbage storage enclosure (to be located on the upper-level of the undergro..., 2025); 26 272890 (Installation of new vertical condensate drain risers to collect condensate from existin..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 60 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • 2 open by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 182497 PRS 00 IR (Property Standards, 2026, status Rescheduled); 18 271931 HEA 00 IR (Adequate Heat, 2018, status Rescheduled).
  • City upkeep score: 82 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: CollegeThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 104.1 m frontage≈ 72.1 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 open by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 182497 PRS 00 IR (Property Standards, 2026, status Rescheduled); 18 271931 HEA 00 IR (Adequate Heat, 2018, status Rescheduled).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 building permits open, the oldest since 2020

    Needs a closer look

    Still open in the City's records: 21 173291 (Replacement of existing PTAC (HVAC) units and washroom exhaust fans and block exterior..., 2021, status Inspection); 20 142776 (Proposed replacement of existing PTAC (HVAC) units and washroom exhaust fans, and block..., 2020, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Property Standards, Zoning): 26 182483 PRS 00 IR (Property Standards, 2026); 26 168512 PRS 00 IR (Property Standards, 2026); 25 254841 PRS 00 IR (Property Standards, 2025); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 121315 (Garage roof waterproofing repairs, work includes concrete repairs, 2026); 25 138092 (Construct a garbage storage enclosure (to be located on the upper-level of the undergro..., 2025); 26 272890 (Installation of new vertical condensate drain risers to collect condensate from existin..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0915/24TEY (To alter the existing 15-storey apartment building by constructing a garbage storage en..., 2025).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 82 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (15 storeys, 145 units, built 1985).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

24 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 272890Application On Hold

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    Nov 20, 2026 · 145 MUTUAL ST
  • By-law investigation26 182497 PRS 00 IRRescheduled

    Property Standards

    Jun 11, 2026 · 145 MUTUAL ST
  • By-law investigation26 182483 PRS 00 IRClosed

    Property Standards

    Jun 11, 2026 · 145 MUTUAL ST
  • By-law investigation26 168512 PRS 00 IRClosed

    Property Standards

    May 27, 2026 · 145 MUTUAL ST
  • Building permit26 121315Permit Issued

    Garage roof waterproofing repairs, work includes concrete repairs.

    Mar 16, 2026 · 145 MUTUAL ST
  • By-law investigation25 254841 PRS 00 IRClosed

    Property Standards

    Nov 17, 2025 · 145 MUTUAL ST
  • By-law investigation25 210282 PRS 00 IRClosed

    Property Standards

    Aug 14, 2025 · 145 MUTUAL ST
  • By-law investigation25 198539 PRS 00 IRClosed

    Property Standards

    Jul 22, 2025 · 145 MUTUAL ST
Show 16 older records
  • By-law investigation25 191544 PRS 00 IRClosed

    Property Standards

    Jul 10, 2025 · 145 MUTUAL ST
  • By-law investigation25 156153 ZON 00 IRClosed

    Zoning

    May 8, 2025 · 145 MUTUAL ST
  • Building permit25 138092Permit Issued

    Construct a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    Apr 11, 2025 · 145 MUTUAL ST
  • Minor varianceA0915/24TEYApproved

    To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.

    Feb 26, 2025 · 145 MUTUAL ST
  • Zoning review24 167961 ZAPApplication On Hold
    Jun 20, 2024 · 145 MUTUAL ST
  • Building permit22 100112Closed

    Interior alteration work related to PTAC replacement. There is currently building permit which was received previously related to this project. Permit # : 21 173291 MSA 00 MSThis submission is only for interior Alteration purposes.

    Apr 1, 2022 · 145 MUTUAL ST
  • Building permit21 173291Inspection

    Replacement of existing PTAC (HVAC) units and washroom exhaust fans and block exterior openings

    Aug 20, 2021 · 145 MUTUAL ST
  • Zoning review21 201038 ZZUCancelled
    Aug 19, 2021 · 145 MUTUAL ST
  • Building permit20 142776Inspection

    Proposed replacement of existing PTAC (HVAC) units and washroom exhaust fans, and block exterior openings

    Oct 23, 2020 · 145 MUTUAL ST
  • By-law investigation18 271931 HEA 00 IRRescheduled

    Adequate Heat

    Dec 24, 2018 · 145 MUTUAL ST
  • Building permit18 217828Closed

    Proposed balcony and concrete repairs including waterproofing for an existing *Comunnity Housing* apartment building.

    Sep 28, 2018 · 145 MUTUAL ST
  • Building permit16 234760Closed

    Revision 02 - exterior ramp and mechanical equipment servicing the laundry toomREV - 01 Change to laundry room layout and addition of a service door. See attached cover letter.Proposal for interior alterations to the ground floor to add barrier free washrooms and repair exterior ramp in existing apartment building.

    Apr 4, 2018 · 145 MUTUAL ST
  • Building permit18 113577Closed

    Proposal to replace existing make up air unit.

    Mar 2, 2018 · 145 MUTUAL ST
  • Building permit17 170383Closed

    Proposal for concrete repair and waterproofing to parking garage ramp in existing apartment building.

    Jun 21, 2017 · 145 MUTUAL ST
  • Building permit09 195556Closed

    Proposal to install one back flow device

    Dec 15, 2009 · 145 MUTUAL ST
  • Zoning review82 025650 LTOClosed
    Jan 18, 1982 · 145 MUTUAL ST

Check before you build

  • Site-specific exception 900.11.10(1457)

    Needs a closer look

    2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1457)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot ; and [TO: 438-86; 12 (2) 80]

  2. Rule B

    The maximum interior floor area used for office must not be more than 0.5 times the area of the lot . [TO: 438-86; 12(2) 216]

  3. Older by-law A

    Section 12(2) 132 of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(2) 256 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
3,316 m²
Frontage
104.1 mestimated, irregular lot
Depth
72.1 mestimated, irregular lot
Street
Mutual St
Corner lot
No
Public lane
None
House footprint
932 m²roof up to 53.2 m
Back yard
29.8 mhouse to rear lot line
Side yards
9.9 m and 31.4 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 4.0 (c0.5; r4.0) SS1 (x1457) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
95%21 of 22 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
6
Development applications
25

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.

    332 YONGE ST · Oct 14, 2026 · 486 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    212 DUNDAS ST E · Jul 15, 2026 · 294 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.

    311 SHERBOURNE ST · Jun 3, 2026 · 436 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.

    53 A MUTUAL ST · Oct 1, 2025 · 441 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.

    53 MUTUAL ST · Oct 1, 2025 · 446 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.

    50 GERRARD ST E · Nov 25, 2026 · 250 m away
  • Building permit

    Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies

    145 MUTUAL ST · Nov 20, 2026 · 22 m away
  • Building permit

    1 Wall Sign***** T-DOT DENTAL*****

    306 JARVIS ST · Nov 17, 2026 · 274 m away
  • Zoning review

    Closed

    66 GERRARD ST E · Nov 9, 2026 · 216 m away
  • Zoning review

    Not Started

    66 GERRARD ST E · Nov 4, 2026 · 216 m away
  • Building permit

    REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"

    355 CHURCH ST · Oct 30, 2026 · 211 m away
  • Building permit

    Proposal to install a maglock in existing office space.

    355 CHURCH ST · Oct 28, 2026 · 211 m away
  • Building permit

    Proposal to replace roof top mounted mechanical units.

    311 JARVIS ST · Oct 1, 2026 · 123 m away
  • Building permit

    Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St

    257 JARVIS ST · Sep 25, 2026 · 230 m away
  • Zoning review

    Closed

    200 DUNDAS ST E · Sep 4, 2026 · 286 m away

Neighbourhood: Downtown Yonge East

About the area around the lot, not the lot itself.

Nearest station
TMU Station8 min walk
Nearest TTC stop
Dundas St East at Jarvis St5 min walk
Nearest cycling route
Gerrard St ECycle Track, 2 min walk
Nearest traffic count
14,566 vehicles in 8 hJarvis St: Dundas St E - Gerrard St E, 110 m away, Jun 17, 2010
Serious collisions within 500 m
212021–2026, killed or seriously injured: 2 fatal, 15 with pedestrians, 4 with cyclists
Parks
Allan Gardens3 min walk
Toronto Metropolitan University Square5 min walk
Arena Gardens6 min walk

Schools within 1 km

  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
  • TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 4 min walk
  • TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 5 min walk
  • TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk
  • TAIE INTERNATIONAL INSTITUTE SCHOOL Private 6 min walk
  • TMU - HEASLIP HOUSE University 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDowntown Yonge EastMedian neighbourhood
Median household income (2020)$69,500$84,500
Households that own their home36%54%
Population (2021)17,70016,813
Homes built in 1960 or before7%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDowntown Yonge EastCity median
Assault2360.8636.3
Robbery143.369.5
Shootings11.910.5
Auto theft75.6192.6
Theft over $5,00099.546.1
Break and enter274.7172.8
Theft from vehicles390.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.