Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 open by-law investigations
Needs a closer lookNot resolved in the City's records: 26 182497 PRS 00 IR (Property Standards, 2026, status Rescheduled); 18 271931 HEA 00 IR (Adequate Heat, 2018, status Rescheduled).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations2 building permits open, the oldest since 2020
Needs a closer lookStill open in the City's records: 21 173291 (Replacement of existing PTAC (HVAC) units and washroom exhaust fans and block exterior..., 2021, status Inspection); 20 142776 (Proposed replacement of existing PTAC (HVAC) units and washroom exhaust fans, and block..., 2020, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)7 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards, Zoning): 26 182483 PRS 00 IR (Property Standards, 2026); 26 168512 PRS 00 IR (Property Standards, 2026); 25 254841 PRS 00 IR (Property Standards, 2025); and 4 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 121315 (Garage roof waterproofing repairs, work includes concrete repairs, 2026); 25 138092 (Construct a garbage storage enclosure (to be located on the upper-level of the undergro..., 2025); 26 272890 (Installation of new vertical condensate drain risers to collect condensate from existin..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0915/24TEY (To alter the existing 15-storey apartment building by constructing a garbage storage en..., 2025).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)8 development applications open within 300 m
Good to know8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 82 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (15 storeys, 145 units, built 1985).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
24 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 272890Application On Hold
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
Nov 20, 2026 · 145 MUTUAL ST - By-law investigation26 182497 PRS 00 IRRescheduled
Property Standards
Jun 11, 2026 · 145 MUTUAL ST - By-law investigation26 182483 PRS 00 IRClosed
Property Standards
Jun 11, 2026 · 145 MUTUAL ST - By-law investigation26 168512 PRS 00 IRClosed
Property Standards
May 27, 2026 · 145 MUTUAL ST - Building permit26 121315Permit Issued
Garage roof waterproofing repairs, work includes concrete repairs.
Mar 16, 2026 · 145 MUTUAL ST - By-law investigation25 254841 PRS 00 IRClosed
Property Standards
Nov 17, 2025 · 145 MUTUAL ST - By-law investigation25 210282 PRS 00 IRClosed
Property Standards
Aug 14, 2025 · 145 MUTUAL ST - By-law investigation25 198539 PRS 00 IRClosed
Property Standards
Jul 22, 2025 · 145 MUTUAL ST
Show 16 older records
- By-law investigation25 191544 PRS 00 IRClosed
Property Standards
Jul 10, 2025 · 145 MUTUAL ST - By-law investigation25 156153 ZON 00 IRClosed
Zoning
May 8, 2025 · 145 MUTUAL ST - Building permit25 138092Permit Issued
Construct a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.
Apr 11, 2025 · 145 MUTUAL ST - Minor varianceA0915/24TEYApproved
To alter the existing 15-storey apartment building by constructing a garbage storage enclosure (to be located on the upper-level of the underground parking garage), which will be the cause for a reduction in two vehicular parking spaces.
Feb 26, 2025 · 145 MUTUAL ST - Zoning review24 167961 ZAPApplication On HoldJun 20, 2024 · 145 MUTUAL ST
- Building permit22 100112Closed
Interior alteration work related to PTAC replacement. There is currently building permit which was received previously related to this project. Permit # : 21 173291 MSA 00 MSThis submission is only for interior Alteration purposes.
Apr 1, 2022 · 145 MUTUAL ST - Building permit21 173291Inspection
Replacement of existing PTAC (HVAC) units and washroom exhaust fans and block exterior openings
Aug 20, 2021 · 145 MUTUAL ST - Zoning review21 201038 ZZUCancelledAug 19, 2021 · 145 MUTUAL ST
- Building permit20 142776Inspection
Proposed replacement of existing PTAC (HVAC) units and washroom exhaust fans, and block exterior openings
Oct 23, 2020 · 145 MUTUAL ST - By-law investigation18 271931 HEA 00 IRRescheduled
Adequate Heat
Dec 24, 2018 · 145 MUTUAL ST - Building permit18 217828Closed
Proposed balcony and concrete repairs including waterproofing for an existing *Comunnity Housing* apartment building.
Sep 28, 2018 · 145 MUTUAL ST - Building permit16 234760Closed
Revision 02 - exterior ramp and mechanical equipment servicing the laundry toomREV - 01 Change to laundry room layout and addition of a service door. See attached cover letter.Proposal for interior alterations to the ground floor to add barrier free washrooms and repair exterior ramp in existing apartment building.
Apr 4, 2018 · 145 MUTUAL ST - Building permit18 113577Closed
Proposal to replace existing make up air unit.
Mar 2, 2018 · 145 MUTUAL ST - Building permit17 170383Closed
Proposal for concrete repair and waterproofing to parking garage ramp in existing apartment building.
Jun 21, 2017 · 145 MUTUAL ST - Building permit09 195556Closed
Proposal to install one back flow device
Dec 15, 2009 · 145 MUTUAL ST - Zoning review82 025650 LTOClosedJan 18, 1982 · 145 MUTUAL ST
Check before you build
Site-specific exception 900.11.10(1457)
Needs a closer look2 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
On the lands, a parking facility is only permitted, if: (i) it is located on the same lot as a residential building , non-residential building , or a mixed use building ; and (ii) it has no more than 125% of the number of parking spaces required to be provided for the building on the lot ; and [TO: 438-86; 12 (2) 80]
- Rule B
The maximum interior floor area used for office must not be more than 0.5 times the area of the lot . [TO: 438-86; 12(2) 216]
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 256 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 3,316 m²
- Frontage
- 104.1 mestimated, irregular lot
- Depth
- 72.1 mestimated, irregular lot
- Street
- Mutual St
- Corner lot
- No
- Public lane
- None
- House footprint
- 932 m²roof up to 53.2 m
- Back yard
- 29.8 mhouse to rear lot line
- Side yards
- 9.9 m and 31.4 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c0.5; r4.0) SS1 (x1457) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 95%21 of 22 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 1
- Multiplex permits
- 6
- Development applications
- 25
Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 486 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 294 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by converting the storage room on the second and third levels into seven additional hostel suites (three on the second level, and four on the third level). The existing pharmacy and cafeteria on the ground level, 19 hostel suites on the second level, and 20 hostel suites on the third level will be maintained and unaltered.
311 SHERBOURNE ST · Jun 3, 2026 · 436 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 441 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 446 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever a portion of stratified land (air-rights at-and-above an elevation of 121 m) for the purpose of a lot addition.
50 GERRARD ST E · Nov 25, 2026 · 250 m away - Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 22 m away - Building permit
1 Wall Sign***** T-DOT DENTAL*****
306 JARVIS ST · Nov 17, 2026 · 274 m away - Zoning review
Closed
66 GERRARD ST E · Nov 9, 2026 · 216 m away - Zoning review
Not Started
66 GERRARD ST E · Nov 4, 2026 · 216 m away - Building permit
REVISION-01Proposal for interior alterations to existing vacant suite for new crisis centre - "Gerstein Crisis Centre"
355 CHURCH ST · Oct 30, 2026 · 211 m away - Building permit
Proposal to install a maglock in existing office space.
355 CHURCH ST · Oct 28, 2026 · 211 m away - Building permit
Proposal to replace roof top mounted mechanical units.
311 JARVIS ST · Oct 1, 2026 · 123 m away - Building permit
Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St
257 JARVIS ST · Sep 25, 2026 · 230 m away - Zoning review
Closed
200 DUNDAS ST E · Sep 4, 2026 · 286 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station8 min walk
- Nearest TTC stop
- Dundas St East at Jarvis St5 min walk
- Nearest cycling route
- Gerrard St ECycle Track, 2 min walk
- Nearest traffic count
- 14,566 vehicles in 8 hJarvis St: Dundas St E - Gerrard St E, 110 m away, Jun 17, 2010
- Serious collisions within 500 m
- 212021–2026, killed or seriously injured: 2 fatal, 15 with pedestrians, 4 with cyclists
- Parks
- Allan Gardens3 min walk
- Toronto Metropolitan University Square5 min walk
- Arena Gardens6 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 4 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 4 min walk
- TORONTO METROPOLITAN UNIVERSITY - THEATRE SCHOOL University 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 5 min walk
- TAIE INTERNATIONAL INSTITUTE SCHOOL Private 6 min walk
- TMU - HEASLIP HOUSE University 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.