Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Work or applications in progress
Good to knowRecent records on this lot: 21 233648 WET 01 SA (Site Plan Control application to construct a warehouse building, consisting of 40,462 s..., 2021).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A0151/23EYK (To permit a parking deficiency to facilitate the development of a proposed one-storey w..., 2023).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)1 development application open within 300 m
Good to know1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
9 records on file: more than at 99% of Toronto houses (median 0).
- Zoning review26 165522 ZZUClosedMay 22, 2026 · 145 CARRIER DR
- Minor varianceA0151/23EYKApproved
To permit a parking deficiency to facilitate the development of a proposed one-storey warehouse building.
May 25, 2023 · 145 CARRIER DR - Zoning review22 235309 ZAPCancelledDec 1, 2022 · 145 CARRIER DR
- Zoning review21 233648 PSPClosedNov 22, 2021 · 145 CARRIER DR
- Development application21 233648 WET 01 SANOAC Issued
Site Plan Control application to construct a warehouse building, consisting of 40,462 square metres of industrial gross floor area, 230 parking spaces, and 52 loading spaces.
Nov 3, 2021 · 145 CARRIER DR · City file - Building permit16 235986Closed
To erect and display two illuminated wall signs displaying static copy on the easterly and southerly elevations, each measuring 2.44 m by 2.44 m at a height of 7.07 m. ** Hudson's Bay company**
Oct 24, 2016 · 145 CARRIER DR - Building permit16 212268Closed
To erect and display two illuminated wall signs displaying static copy on the easterly and southerly elevations, each measuring 1.82 m by 1.72 m. ** Hudson's Bay company**
Sep 15, 2016 · 145 CARRIER DR - Zoning review15 211419 LPRClosedAug 24, 2015 · 145 CARRIER DR
Show 1 older records
- Building permit13 138424Closed
Install (1) backflow prevention device
Mar 26, 2013 · 145 CARRIER DR
Lot facts
- Area
- 76,680 m²
- Frontage
- 304.4 m
- Depth
- 257.4 m
- Street
- Carrier Dr
- Corner lot
- No
- Public lane
- None
- House footprint
- 13,531 m²roof up to 13.6 m
- Back yard
- 28.4 mhouse to rear lot line
- Side yards
- 20.4 m and 172.3 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
- 14 City trees in front of this lot. The City's street tree inventory lists 14 trees at this address: buckeye, yellow (10 cm), basswood, redmond (10 cm), basswood, redmond (10 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%1 of 1 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 1
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a parking deficiency to facilitate the development of a proposed one-storey warehouse building.
145 CARRIER DR · May 25, 2023 · 88 m away - Minor varianceApproved
To permit a parking deficiency for a Software Development and Processing use.
310 HUMBERLINE DR · Nov 22, 2018 · 483 m away
Latest activity nearby
- Building permit
Proposal to install a new sprinkler system.
173 CARRIER DR · Nov 4, 2026 · 231 m away - Zoning review
Closed
145 CARRIER DR · May 22, 2026 · 88 m away - Building permit
Rooftop solar PV panels installation
279 HUMBERLINE DR · Jan 13, 2025 · 235 m away - Zoning review
Closed
110 CARRIER DR · May 14, 2024 · 231 m away - Building permit
Sprinkler System Upgrades to comply with FM Global Standards, Existing sprinkler heads will be replaced with ESFR heads as required by use of warehouse.
279 HUMBERLINE DR · Apr 5, 2024 · 235 m away - Building permit
REV01: Proposal to revise interior alterations & construction foundation for silos. Interior alterations, construct foundation for exterior silos and new loading dock
120 CARRIER DR · Nov 29, 2023 · 198 m away - Building permit
Alternative Solution for the design of exposure sprinklers, for 'COVERTECH FABRICATING"
279 HUMBERLINE DR · Oct 10, 2023 · 235 m away - Minor varianceApproved
To permit a parking deficiency to facilitate the development of a proposed one-storey warehouse building.
145 CARRIER DR · May 25, 2023 · 88 m away - Building permit
Divert existing watermains around future silo foundations
120 CARRIER DR · Jan 3, 2023 · 198 m away - Zoning review
Cancelled
145 CARRIER DR · Dec 1, 2022 · 88 m away
Neighbourhood: West Humber-Clairville
About the area around the lot, not the lot itself.
- Nearest station
- Westmore Station21 min walk
- Nearest TTC stop
- Opposite 100 Carrier Dr3 min walk
- Nearest cycling route
- West Humber TrlMulti-Use Trail, 15 min walk
- Nearest traffic count
- 11,767 vehicles in 14 hClaireville Dr / Humberline Dr (South), 350 m away, Sep 30, 2025
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Finch - Humberline Sportsfields10 min walk
- Humber Arboretum14 min walk
- Trca Lands ( 1)14 min walk
Schools within 1 km
- SOLID ROCK ACADEMY Private 15 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | West Humber-Clairville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $92,000 | $84,500 |
| Households that own their home | 65% | 54% |
| Population (2021) | 33,300 | 16,813 |
| Homes built in 1960 or before | 13% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | West Humber-Clairville | City median |
|---|---|---|
| Assault | 933 | 636.3 |
| Robbery | 152.4 | 69.5 |
| Homicide | 2.7 | 5.3 |
| Shootings | 26.7 | 10.5 |
| Auto theft | 1320.6 | 192.6 |
| Theft over $5,000 | 245.9 | 46.1 |
| Break and enter | 347.5 | 172.8 |
| Theft from vehicles | 545.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.