HousePrecheckCheck an address

1430 Yonge StToronto · zoning, lot size and permit records

Commercial residential · CR 4.25 (c2.0; r3.0) SS2 (x1622)25.2 × 59.4 m1,430 m²on Yonge Stcorner, also on Pleasant Blvd

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 21 185451 STE 12 OZ (To allow a 50-storey mixed use building with commercial at grade, containing 534dwellin..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 23 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: St ClairThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
25.2 m frontage59.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 09 161324 (Jan 15/10: Revision to building permit, see revision cloudCreate 30 seat restaruant whi..., 2010, status Revision Issued); 07 255809 (HVAC - Interior alterations to commercial unit (south unit) on ground floor for new ret..., 2007, status Inspection); 07 135574 (Install 4 maglocks, 2007, status Inspection); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 21 185451 STE 12 OZ (To allow a 50-storey mixed use building with commercial at grade, containing 534dwellin..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 23 development applications open within 300 m

    Good to know

    23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

24 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 255308Closed

    Proposed interior alterations for Cookey's Cafe. All existing footprint of building, door and windows remain as is

    Dec 12, 2025 · 1430 YONGE ST
  • Development application21 185451 STE 12 OZCouncil Approved

    To allow a 50-storey mixed use building with commercial at grade, containing 534dwelling units.Inactive file: Paused on request of applicant until September 2026.

    Jul 16, 2021 · 1428 YONGE ST · City file
  • Zoning review14 162588 LTOClosed
    May 27, 2014 · 1430 YONGE ST
  • Building permit11 326792Closed

    permit to install new backflow device in basement of existing apartment building

    Jan 16, 2012 · 1430 YONGE ST
  • Building permit11 314847Closed

    Proposal for interior alterations to existing ground floor unit for new takeout restaurant (14 seats) - Salis Noodis.

    Dec 7, 2011 · 1430 YONGE ST
  • Building permit09 161324Revision Issued

    Jan 15/10: Revision to building permit, see revision cloudCreate 30 seat restaruant which includes 8 front patio seats on private property. "Fixx Cafe"

    Feb 17, 2010 · 1430 YONGE ST
  • Building permit08 179795Closed

    Interior alterations at Suite 1101 of an existing residential condominium building.

    Aug 18, 2008 · 1430 YONGE ST
  • Building permit07 272095Closed

    Proposed combination of two existing residential dwelling units on 15th floor. Suite 1501. Alter spandrel units on south elevation ( upper level) to newly renovated unit.

    Apr 8, 2008 · 1430 YONGE ST
Show 16 older records
  • Building permit07 255809Inspection

    HVAC - Interior alterations to commercial unit (south unit) on ground floor for new retail store. Tenant - "Book City".

    Sep 14, 2007 · 1430 YONGE ST
  • Building permit07 135574Inspection

    Install 4 maglocks.

    Apr 26, 2007 · 1430 YONGE ST
  • Zoning review07 118029 ZPRClosed
    Mar 23, 2007 · 1430 YONGE ST
  • Building permit05 194639Closed

    Sprinklers in connection with BLD 04 170929

    Dec 12, 2005 · 1430 YONGE ST
  • Building permit04 170929Inspectionnew building

    Construct new 14 storey mixed use building; commercial with 88 condominiums.

    Dec 12, 2005 · 1430 YONGE ST
  • Building permit04 171738Closeddemolition

    Demolish existing commercial building; in connection with permit #04-170929 BLD.

    Nov 23, 2004 · 1430 YONGE ST
  • Building permit04 170952Cancellednew building

    Construct new 14 storey mixed use building; commercial & 92 condonium units.

    Sep 1, 2004 · 1430 YONGE ST
  • Zoning review02 108420 PSPClosed
    Feb 5, 2002 · 1430 YONGE ST
  • Zoning review01 197466 PRZClosed
    Nov 23, 2001 · 1430 YONGE ST
  • Zoning review01 013202 LTOClosed
    Sep 6, 2001 · 1430 YONGE ST
  • Zoning review98 026734 LTOClosed
    Oct 7, 1998 · 1430 YONGE ST
  • Zoning review98 026669 LTOClosed
    Sep 24, 1998 · 1430 YONGE ST
  • Zoning review98 026154 LTOClosed
    May 15, 1998 · 1430 YONGE ST
  • Zoning review97 026530 LTOClosed
    Jul 2, 1997 · 1430 YONGE ST
  • Zoning review92 025950 LTOClosed
    Sep 15, 1992 · 1430 YONGE ST
  • Zoning review83 026170 LTOClosed
    Aug 11, 1983 · 1430 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(1622)

    Needs a closer look

    3 site-specific rules and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1622)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On a lot , a duplex is permitted. [TO: 438-86; 12(1) 243(a)]

  2. Rule B

    In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category; and Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 174 of former City of Toronto By-law 438-86; (B) Section 12(2) 260 of former City of Toronto By-law 438-86

  3. Rule C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

  4. Older by-law A

    On a lot , a duplex is permitted. [TO: 438-86; 12(1) 243(a)]

  5. Older by-law B

    In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category; and Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 174 of former City of Toronto By-law 438-86; (B) Section 12(2) 260 of former City of Toronto By-law 438-86

  6. Older by-law C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
1,430 m²
Frontage
25.2 m
Depth
59.4 m
Street
Yonge St
Corner lot
Yes, also on Pleasant Blvd59.4 m along it
Public lane
None
Max height
30 m
Max lot coverage
—
  • Major Transit Station Area: St Clair. The lot is inside the St Clair Major Transit Station Area approved by the Province (Site and Area Specific Policy 721). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 4.25 (c2.0; r3.0) SS2 (x1622) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: ginkgo (5 cm), ginkgo (5 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
86%25 of 29 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
0
Development applications
32

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.

    1262 YONGE ST · Jun 3, 2026 · 432 m away
  • Minor varianceRefused

    To construct a new three-storey non-residential building (including a mezzanine level), with various uses such as: adaptable spaces for community-oriented and commercial uses, a convertible auditorium space, an atrium gathering area, workshops, studios, meeting rooms, café, entertainment places of assembly, eating/take-out establishment(s), and recreation. There will be greenroof areas, an outdoor rooftop terrace, and the rooftop mechanical penthouse will be enclosed (above the second storey).

    1560 YONGE ST · May 27, 2026 · 295 m away
  • Minor varianceApproved

    To permit additional commercial use types on the ground floor of the 44-storey mixed-use building (currently under construction).

    1 DELISLE AVE · Feb 18, 2026 · 209 m away
  • Minor varianceApproved

    To permit a commercial school use (fitness studio occupying Units 106 and 109) on the first storey of the existing 21-storey non-residential building.

    2 ST CLAIR AVE W · Jan 28, 2026 · 131 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1032-2022) for a mixed-use development comprised of a 13-storey building (Building 1) and three towers (Tower 1 with 44-storeys, Tower 2 with 38-storeys and Tower 3 with 25-storeys) connected by a shared podium on the lot by reallocating a proportion of residential density from Building 1 to Tower 1, increasing the building height of Tower 1 from 44-storeys (144 m) to 46-storeys (161.2 m), decreasing the height of Building 1 from 13-storeys (53.5 m) to four-storeys (25 m), increasing the height and projections of the mechanical penthouse and architectural crowning elements associated with Tower 1, modifying setbacks and separation distance by relocating Tower 2 (north toward Building 1) and by altering the podium element below Tower 3.

    1 HEATH ST E · Dec 10, 2025 · 312 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    30 ST CLAIR AVE W · Oct 28, 2027 · 144 m away
  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    40 ST CLAIR AVE W · Oct 28, 2027 · 170 m away
  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    1 DELISLE AVE · Aug 10, 2027 · 209 m away
  • Building permit

    Proposed localized concrete repairs for an underground parking garage

    45 ST CLAIR AVE W · Nov 24, 2026 · 108 m away
  • Building permit

    Remove and replace 1 Chiller, 1 Cooling Tower, 1 Condenser Pump, 2 Building Pumps, VFDs

    1 BALMORAL AVE · Nov 17, 2026 · 186 m away
  • Building permit

    Proposal to install 1 maglocks in existing office space - UNIT 400

    1 ST CLAIR AVE E · Nov 13, 2026 · 103 m away
  • Building permit

    Proposal for maglock installation.

    2 ST CLAIR AVE W · Nov 10, 2026 · 131 m away
  • Building permit

    Revision 01: replacing existing porch structure. PROPOSAL TO REPLACE THE EXISTING FRONT WOOD PORCH WIITH CONCRETE PORCH

    66 BALMORAL AVE · Nov 10, 2026 · 270 m away
  • Building permit

    Interior alteration to convert an existing Group D office occupancy to a Group D nail salon (beautyparlour/personal service use). Building, Plumbing and HVAC included.

    55 ST CLAIR AVE W · Nov 9, 2026 · 213 m away
  • Building permit

    Proposal for localized concrete repairs and replacing the guards at the northwest exterior garage stairwell.

    44 JACKES AVE · Nov 4, 2026 · 285 m away

Neighbourhood: Yonge-St.Clair

About the area around the lot, not the lot itself.

Nearest station
St. Clair Station1 min walk
Nearest TTC stop
Yonge St at St Clair Ave East - St. Clair Station1 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
6,820 vehicles in 8 hYonge St / Pleasant Blvd, 40 m away, Aug 11, 2022
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
Parks
David A. Balfour Park5 min walk
54 Jackes Ave Park5 min walk
Yorkminster Park Baptist Church Park5 min walk

Schools within 1 km

  • THE LINDEN SCHOOL Private 2 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 5 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 6 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 8 min walk
  • BROWN JR PUBLIC SCHOOL English Public 10 min walk
  • DE LASALLE COLLEGE SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-St.ClairMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home40%54%
Population (2021)12,90516,813
Homes built in 1960 or before45%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-St.ClairCity median
Assault270.8636.3
Robbery25.869.5
Auto theft64.5192.6
Theft over $5,00032.246.1
Break and enter374172.8
Theft from vehicles116.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.