HousePrecheckCheck an address

1420 Yonge StToronto · zoning, lot size and permit records

Also 1418 Yonge St, 1422 Yonge St, 1424 Yonge St, 1426 Yonge St, 1428 Yonge St

Commercial residential · CR 4.25 (c2.0; r3.0) SS2 (x633)26.8 × 27.6 m722 m²on Pleasant Blvdcorner, also on Yonge St

Not a home

A commercial or mixed-use building

6 different civic addresses share this parcel, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 23 216558 (PROPOSED: Demolition of existing buildings to allow for construction of new 50-storey r..., 2023); 23 186393 (Demolition of existing buildings to allow for construction of new 50-storey residential..., 2023); 23 186274 (Construction of new 50-storey residential condominium building inlcuding plumbing and H..., 2023); and 3 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 23 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: St ClairThe City plans more homes around the station: good for transit, and more building over time.
N10 m
26.8 m frontage27.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 216558 (PROPOSED: Demolition of existing buildings to allow for construction of new 50-storey r..., 2023); 23 186393 (Demolition of existing buildings to allow for construction of new 50-storey residential..., 2023); 23 186274 (Construction of new 50-storey residential condominium building inlcuding plumbing and H..., 2023); and 3 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 23 development applications open within 300 m

    Good to know

    23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit23 216558Under Reviewdemolition

    PROPOSED: Demolition of existing buildings to allow for construction of new 50-storey residential building with 90m2 commercial unit at grade

    Oct 20, 2023 · 1428 YONGE ST
  • Building permit23 210841Cancelled

    PROPOSED: Building Alteration Permit for erection of heritage retention structure

    Oct 4, 2023 · 1428 YONGE ST
  • Building permit23 186393Under Reviewdemolition

    Demolition of existing buildings to allow for construction of new 50-storey residential building with 90m2 commercial unit at grade

    Aug 9, 2023 · 1428 YONGE ST
  • Building permit23 186274Under Reviewnew building

    Construction of new 50-storey residential condominium building inlcuding plumbing and HVAC, with 542 dwelling units, 3 level podium and 2 levels of underground garage for bike parking and service rooms and 90m2 retail unit at grade

    Aug 9, 2023 · 1428 YONGE ST
  • Building permit22 232063Cancelled

    REV 01 - Additional space was needed for the sales office, and this revision is including additional retail area than the original permit drawings.Temporary presentation centre and sales office for the condominium development at 1406-1428 Yonge St. Sales center will require - The Hill Sales Centre

    Jun 12, 2023 · 1420 YONGE ST
  • Building permit23 114111Closed

    install 1 inch Backflow preventer device

    Apr 27, 2023 · 1420 YONGE ST
  • Zoning review22 134361 LTOClosed
    Apr 13, 2022 · 1428 YONGE ST
  • Development application21 217377 STE 12 CDUnder Review

    *** Draft Plan of Condominium for 406 dwelling units.

    Sep 24, 2021 · 1420 YONGE ST · City file
Show 5 older records
  • Development application21 211696 STE 12 SAUnder Review

    A 50-storey mixed-use building with reconstructed heritage facade and 8 rental replacement units.

    Sep 13, 2021 · 1420 YONGE ST · City file
  • Development application21 185451 STE 12 OZCouncil Approved

    To allow a 50-storey mixed use building with commercial at grade, containing 534dwelling units.Inactive file: Paused on request of applicant until September 2026.

    Jul 16, 2021 · 1420 YONGE ST · City file
  • Zoning review19 260783 LTOClosed
    Dec 13, 2019 · 1428 YONGE ST
  • Building permit17 132946Closed

    install 1" BFP rp and expansion tank

    Apr 12, 2017 · 1420 YONGE ST
  • Zoning review05 117631 ZPUClosed
    Mar 24, 2005 · 1420 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(633)

    Needs a closer look

    15 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(633)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On 1406-1428 Yonge Street, if the requirements of By-law 1110-2022 are complied with, a building , structure may be constructed, used or enlarged in compliance with

  2. Rule B

    to (O) below; (B) Despite Regulations 40.5.40.10(1) and (2), the height of a building or structure is the vertical distance between the Canadian Geodetic Datum of 143.37 metres and the elevation of the highest point of the building or structure

  3. Rule C

    Despite Regulation 40.10.40.10(2), the permitted maximum height of a building or structure is the number in metres following the letters "HT" as shown on Diagram 3 of By-law 1110-2022

  4. Rule D

    Despite Regulations 40.5.40.10 (3) to (8), and (C) above, the following building elements and structures are permitted to project above the permitted maximum heights shown on Diagram 3 of By-law 1110-2022; (i) Architectural features, air intake and air handling units, communication equipment, cooling tower, exit stairs, stairs, stair enclosures, fences, flues, landscape and public art features, noise attenuation walls, pipes, window washing equipment, and elevator machine room to a maximum of 6.5 metres; (ii) Mechanical penthouse to a maximum of 5 metres; (iii) Elevator overruns to a maximum of 6.5 metres above the height of the mechanical penthouse; (iv) Awnings, chimneys, bicycle racks, bollards, guardrails, lighting fixtures, Planters, ornamental elements, cornices, platforms, railings, retaining walls, parapets, railings, balustrades, roof drainage systems, screens, stacks, terraces, green roof , trellises, insulation and roof surface materials, vents, wind mitigation screens, and window sills, to a maximum of 2.5 metres; (v) Elements or structures on any portion of a roof used for outside or open air recreation, including required residential amenity space to a maximum of 3.0 metres

  5. Rule E

    Despite Regulation 40.10.40.40(1), the permitted maximum gross floor area is 30,100 square metres, of which: (i) The permitted maximum gross floor area for residential uses is 29,860 square metres

  6. Rule F

    Despite Regulation 40.10.40.50(1), amenity space must be provided as follows: (i) at least 1.0 square metres for each dwelling unit as indoor amenity space ; (ii) at least 308 square metres of outdoor amenity space , of which at least 40.0 square metres must be in a location adjoining or directly accessible to the indoor amenity space ; and (iii) no more than 25 percent of the outdoor component may be a green roof

  7. Rule G

    Despite Regulation 40.5.40.70(1) and Regulation 40.10.40.70(2), the required minimum building setbacks are identified in metres on Diagram 3 of By-law 1110-2022

  8. Rule H

    Despite Regulations 40.10.40.60(1) to (8) and (G) above, the following building elements and structures may encroach into the required minimum building setbacks as follows: (i) awnings and canopies, light fixtures, pergolas, pillars, patios, decks, guard rails and railings, wind screens and privacy and/or divider screens, air vents and intakes and site servicing features, to a maximum of 2.0 metres; (ii) juliette balconies to a maximum of 0.5 metres; and (iii) structural columns located in the north setback

  9. Rule I

    Regulation 40.10.40.70(2)(G), with respect to angular plane requirements does not apply

  10. Rule J

    Despite Regulation 200.5.1.10(2), Regulation 200.5.10.1(1), Regulation 200.15.10(1) and Table 200.5.10.1, parking spaces must be provided and maintained on the lands in accordance with the following: (i) a minimum of 0 parking spaces for residential uses; (ii) a minimum of 0 parking spaces for non-residential uses; (iii) a minimum of 0 parking spaces for visitors; (iv) a minimum of 0 parking spaces for visitors; (v) despite (i) above parking spaces must be provided at a maximum rate of: (a) 0.3 for each bachelor dwelling unit up to 45 square metres and 1.0 for each bachelor dwelling unit greater than 45 square metres; (b) 0.5 for each one bedroom dwelling unit ; (c) 0.8 for each two bedroom dwelling unit ; and (d) 1.0 for each three or more bedroom dwelling unit

  11. Rule K

    Despite Regulations 200.5.1.10(2)(A)(iv), 200.5.1.10(2)(B)(iv), and 200.5.1.10(2)(C)(iv), no additional space is required when the side of a parking space is obstructed by any part of a wall, column, bollard, fence or pipe

  12. Rule L

    Despite Clause 40.10.90.1, and Regulation 220.5.10.1(2), loading spaces must be provided as follows: (i) one (1) Type "B" loading space , which may be provided on a turntable; and (ii) one (1) Type "C" loading space

  13. Rule M

    Despite Regulation 230.5.1.10(9)(A), "long-term " bicycle parking spaces , including stacked bicycle parking spaces , may be located in a secured room, in a locker, or area on any floor of a building above or below ground level in any combination of vertical, horizontal or stacked positions if a bicycle elevator is provided

  14. Rule N

    Despite Regulation 230.40.1.20(2), a "short term" bicycle parking space may be located more than 30 metres from a pedestrian entrance and may be located on any floor of a building above or below ground level

  15. Rule O

    Despite Regulations 230.5.1.10(4) and (5) stacked bicycle parking spaces must have minimum dimensions as follows: (i) minimum length of 1.8 metres; (ii) minimum width of 0.45 metres, and (iii) minimum vertical clearance for each bicycle parking space of 1.0 metres.

By-law 569-2013, Chapter 900

Lot facts

Area
722 m²
Frontage
26.8 m
Depth
27.6 m
Street
Pleasant Blvd
Corner lot
Yes, also on Yonge St27.6 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
30 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: St Clair. The lot is inside the St Clair Major Transit Station Area approved by the Province (Site and Area Specific Policy 721). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 4.25 (c2.0; r3.0) SS2 (x633) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm, accolade (15 cm), linden (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
89%24 of 27 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
0
Development applications
32

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.

    1262 YONGE ST · Jun 3, 2026 · 405 m away
  • Minor varianceRefused

    To construct a new three-storey non-residential building (including a mezzanine level), with various uses such as: adaptable spaces for community-oriented and commercial uses, a convertible auditorium space, an atrium gathering area, workshops, studios, meeting rooms, café, entertainment places of assembly, eating/take-out establishment(s), and recreation. There will be greenroof areas, an outdoor rooftop terrace, and the rooftop mechanical penthouse will be enclosed (above the second storey).

    1560 YONGE ST · May 27, 2026 · 321 m away
  • Minor varianceApproved

    To permit additional commercial use types on the ground floor of the 44-storey mixed-use building (currently under construction).

    1 DELISLE AVE · Feb 18, 2026 · 235 m away
  • Minor varianceApproved

    To permit a commercial school use (fitness studio occupying Units 106 and 109) on the first storey of the existing 21-storey non-residential building.

    2 ST CLAIR AVE W · Jan 28, 2026 · 158 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1032-2022) for a mixed-use development comprised of a 13-storey building (Building 1) and three towers (Tower 1 with 44-storeys, Tower 2 with 38-storeys and Tower 3 with 25-storeys) connected by a shared podium on the lot by reallocating a proportion of residential density from Building 1 to Tower 1, increasing the building height of Tower 1 from 44-storeys (144 m) to 46-storeys (161.2 m), decreasing the height of Building 1 from 13-storeys (53.5 m) to four-storeys (25 m), increasing the height and projections of the mechanical penthouse and architectural crowning elements associated with Tower 1, modifying setbacks and separation distance by relocating Tower 2 (north toward Building 1) and by altering the podium element below Tower 3.

    1 HEATH ST E · Dec 10, 2025 · 335 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    30 ST CLAIR AVE W · Oct 28, 2027 · 175 m away
  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    40 ST CLAIR AVE W · Oct 28, 2027 · 201 m away
  • Consent (lot split)Pending

    To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.

    1 DELISLE AVE · Aug 10, 2027 · 235 m away
  • Building permit

    Proposed localized concrete repairs for an underground parking garage

    45 ST CLAIR AVE W · Nov 24, 2026 · 137 m away
  • Building permit

    Remove and replace 1 Chiller, 1 Cooling Tower, 1 Condenser Pump, 2 Building Pumps, VFDs

    1 BALMORAL AVE · Nov 17, 2026 · 159 m away
  • Building permit

    Proposal to install 1 maglocks in existing office space - UNIT 400

    1 ST CLAIR AVE E · Nov 13, 2026 · 113 m away
  • Building permit

    Proposal for maglock installation.

    2 ST CLAIR AVE W · Nov 10, 2026 · 158 m away
  • Building permit

    Revision 01: replacing existing porch structure. PROPOSAL TO REPLACE THE EXISTING FRONT WOOD PORCH WIITH CONCRETE PORCH

    66 BALMORAL AVE · Nov 10, 2026 · 274 m away
  • Building permit

    Interior alteration to convert an existing Group D office occupancy to a Group D nail salon (beautyparlour/personal service use). Building, Plumbing and HVAC included.

    55 ST CLAIR AVE W · Nov 9, 2026 · 239 m away
  • Building permit

    Proposal for localized concrete repairs and replacing the guards at the northwest exterior garage stairwell.

    44 JACKES AVE · Nov 4, 2026 · 254 m away

Neighbourhood: Yonge-St.Clair

About the area around the lot, not the lot itself.

Nearest station
St. Clair Station2 min walk
Nearest TTC stop
St Clair Station - Southbound Platform1 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
6,820 vehicles in 8 hYonge St / Pleasant Blvd, 30 m away, Aug 11, 2022
Serious collisions within 500 m
32021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
Parks
David A. Balfour Park4 min walk
54 Jackes Ave Park4 min walk
Yorkminster Park Baptist Church Park6 min walk

Schools within 1 km

  • THE LINDEN SCHOOL Private 2 min walk
  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 4 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 6 min walk
  • THE YORK SCHOOL - JR CAMPUS Private 9 min walk
  • DE LASALLE COLLEGE SCHOOL Private 10 min walk
  • BROWN JR PUBLIC SCHOOL English Public 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-St.ClairMedian neighbourhood
Median household income (2020)$94,000$84,500
Households that own their home40%54%
Population (2021)12,90516,813
Homes built in 1960 or before45%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-St.ClairCity median
Assault270.8636.3
Robbery25.869.5
Auto theft64.5192.6
Theft over $5,00032.246.1
Break and enter374172.8
Theft from vehicles116.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.