HousePrecheckCheck an address

1415 Morningside AveToronto · zoning, lot size and permit records

Employment · E 0.753.6 × 132.8 m6,503 m²on Morningside Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
53.6 m frontage132.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0165/18SC (The applicant is seeking relief from the provisions of the Zoning By-law to permit the..., 2018).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit22 209354Closed

    To erect and display one first party, static, illuminated wall sign on the west elevation of the building. Sign is located in Ward #25 Scarborough-Rouge Park and subject to sign district E-Employment.SIGN DIMENSIONS:0.91m L x 3.91m W x 0.08m D x 3.90m H***Boulder Parc***

    Oct 12, 2022 · 1415 MORNINGSIDE AVE
  • Building permit18 230937Closed

    Rev 01: Proposed workshop changed to office, meeting space and change from 1hr FRR wall to non fire rated wall. interior alterations to add rock climbing gym UNIT A

    Apr 17, 2020 · 1415 MORNINGSIDE AVE
  • Minor varianceA0165/18SCApproved

    The applicant is seeking relief from the provisions of the Zoning By-law to permit the proposed recreation use, climbing gym.

    Aug 16, 2018 · 1415 MORNINGSIDE AVE
  • Zoning review18 112998 ZPRClosed
    Feb 2, 2018 · 1415 MORNINGSIDE AVE

Lot facts

Area
6,503 m²
Frontage
53.6 m
Depth
132.8 m
Street
Morningside Ave
Corner lot
No
Public lane
None
House footprint
2,376 m²roof up to 11.4 m
Back yard
56.1 mhouse to rear lot line
Side yards
3.3 m and 7.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 0.7 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit a hair salon.

    1345 MORNINGSIDE AVE · Jul 26, 2023 · 437 m away
  • Minor varianceApproved

    The applicant is seeking relief from the provisions of the Zoning By-law to permit the proposed recreation use, climbing gym.

    1415 MORNINGSIDE AVE · Aug 16, 2018 · 36 m away

Latest activity nearby

  • Zoning review

    Cancelled

    87 NABOB CRES · Jul 11, 2024 · 208 m away
  • Building permitsecondary suite

    Proposed secondary unit, legalize existing basement.

    59 MCKNIGHT DR · Sep 25, 2023 · 289 m away
  • Building permit

    Proposed attched over hang to the existing house in the rear

    58 NABOB CRES · Jul 18, 2023 · 203 m away
  • Zoning review

    Cancelled

    27 CASEBRIDGE CRT · Mar 1, 2023 · 243 m away
  • Zoning review

    Cancelled

    27 CASEBRIDGE CRT · Feb 14, 2023 · 243 m away
  • Building permit

    To erect and display one first party, static, illuminated wall sign on the west elevation of the building. Sign is located in Ward #25 Scarborough-Rouge Park and subject to sign district E-Employment.SIGN DIMENSIONS:0.91m L x 3.91m W x 0.08m D x 3.90m H***Boulder Parc***

    1415 MORNINGSIDE AVE · Oct 12, 2022 · 36 m away
  • Building permit

    REV 02: Proposal for changes ground floor office. REVISION - as per the attached cover letterProposal for multiple projects to an existing industrial plant for a new food processing plant. Scope of work includes interior alterations, new overhead doors and exterior canopies - "AZ Fresh Inc"

    1405 MORNINGSIDE AVE · May 17, 2022 · 73 m away
  • Building permitsecondary suite

    Proposed new 2nd suite in the basement with walkout staircase and proposed new laundry on the ground floor.

    67 NABOB CRES · Jun 1, 2021 · 141 m away
  • Building permit

    Proposal to install 11 maglocks for existing industrial building

    1405 MORNINGSIDE AVE · Jan 5, 2021 · 73 m away
  • Building permit

    Proposed existing second floor office space to be separated into a new suite

    1395 MORNINGSIDE AVE · Apr 17, 2020 · 155 m away

Neighbourhood: Morningside Heights

About the area around the lot, not the lot itself.

Nearest TTC stop
1415 Morningside Ave1 min walk
Nearest cycling route
Scarborough Railpath TrlMulti-Use Trail, 1 min walk
Nearest traffic count
26,934 vehicles in 14 hMorningside Ave / McLevin Ave / Casebridge Crt, 210 m away, Dec 10, 2024
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Rouge Park1 min walk
John Tabor Park8 min walk
Shawn "blu" Rose Park8 min walk

Schools within 1 km

  • ALEXANDER STIRLING PUBLIC SCHOOL English Public 7 min walk
  • FLEMING PUBLIC SCHOOL English Public 8 min walk
  • EMILY CARR PUBLIC SCHOOL English Public 12 min walk
  • ST BEDE CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • ST COLUMBA CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
  • ST MOTHER TERESA CATHOLIC ACADEMY English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMorningside HeightsMedian neighbourhood
Median household income (2020)$117,000$84,500
Households that own their home84%54%
Population (2021)24,94016,813
Homes built in 1960 or before1%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMorningside HeightsCity median
Assault486.1636.3
Robbery138.469.5
Shootings18.710.5
Auto theft362.7192.6
Theft over $5,00067.346.1
Break and enter149.6172.8
Theft from vehicles243.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.