Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 by-law investigation closed in the last two years
Good to knowClosed files (Zoning): 26 189222 ZON 00 IR (Zoning, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 25 241192 (THIS IS A PARTY WALL AGREEMENT PERMITOriginal Permit Application #: 25-190283 BLDOrigin..., 2025); 25 241183 (THIS IS A PARTY WALL AGREEMENT PERMITOriginal Permit Application #: 25-190283 BLDOrigin..., 2025); 25 190283 (Proposed interior alterations to home to add a loft to our 4th floor and change a 1+Den..., 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications10 development applications open within 300 m
Good to know10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 33 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- By-law investigation26 189222 ZON 00 IRClosed
Zoning
Jun 22, 2026 · 1388 BLOOR ST W - Building permit25 241192Permit Issued
THIS IS A PARTY WALL AGREEMENT PERMITOriginal Permit Application #: 25-190283 BLDOriginal Permit SoW: WE WILL ADD A LOFT TO OUR 4TH FLOOR AND CONVERT A 1+DEN SETUP TO 2-BEDROOM ON THE 3RD FLOOR
Nov 18, 2025 · 1386 BLOOR ST W - Building permit25 241183Permit Issued
THIS IS A PARTY WALL AGREEMENT PERMITOriginal Permit Application #: 25-190283 BLDOriginal Permit SoW: WE WILL ADD A LOFT TO OUR 4TH FLOOR AND CONVERT A 1+DEN SETUP TO 2-BEDROOM ON THE 3RD FLOOR
Nov 18, 2025 · 1388 BLOOR ST W - Building permit25 190283Inspection
Proposed interior alterations to home to add a loft to our 4th floor and change a 1+Den setup to be 2 bedrooms. (Unit # 4)
Oct 20, 2025 · 1388 BLOOR ST W - Building permit24 235375Closed
New powder room on the ground floor, third storey loft extension over the stair landing.
Nov 20, 2024 · 31 DEKOVEN MEWS - Building permit20 215547Closed
Proposal to construct a storage mezzanine at the top of the townhouse stair well
Jan 6, 2021 · 19 DEKOVEN MEWS - Building permit19 258843ClosedFeb 7, 2020 · 19 DEKOVEN MEWS
Check before you build
Site-specific exception 900.11.10(1581)
Needs a closer look4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
These premises must comply with Exception 900 11.10(2).
- Rule B
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category; Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 199 of former City of Toronto By-law 438-86; (B) Section 12(2) 335 of former City of Toronto By-law 438-86
- Rule C
Section 12(2) 336 of former City of Toronto By-law 438-86
- Rule D
Section 12(2) 270(a) of former City of Toronto By-law 438-86.
- Older by-law A
These premises must comply with Exception 900 11.10(2).
- Older by-law B
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category; Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 199 of former City of Toronto By-law 438-86; (B) Section 12(2) 335 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 336 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 270(a) of former City of Toronto By-law 438-86.
Lot facts
- Area
- 2,698 m²
- Frontage
- 38.2 m
- Depth
- 70.6 m
- Street
- Ruttan St
- Corner lot
- Yes, also on Bloor St W70.6 m along it
- Public lane
- DeKoven Mews, 70.6 m along it
- Max height
- 24 m
- Max lot coverage
- —
Around this lot
- Minor variances approved
- 93%28 of 30 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 7
- Multiplex permits
- 15
- Development applications
- 22
Within 300 m, last 10 years. 22 suite and multiplex permits: more than at 90% of Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipally known as 1325 Bloor Street West and 17 Dora Avenue). The application is to also modify Schedule A, as cited under Site Specific Zoning By-law 589-2022, to exempt transportation uses from Section 37 obligations.
1319 BLOOR ST W · May 7, 2025 · 208 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.
1319 BLOOR ST W · Nov 27, 2024 · 208 m away - Minor varianceApproved
To alter the development standards for a new rental building (approved under Site Specific Zoning By-law 182-2022, as amended by City Wide By-law 569-2013, and Minor Variance Decision A0892/22TEY) by increasing the building height from 11 to 16 storeys, reducing the ground floor height, increasing the residential density, increasing the number of residential units from 128 to 211 units, amending the building setbacks/stepbacks and reducing the loading space provisions on site. The existing vacant two-story building (previously used as a place of worship) will be demolished.
72 PERTH AVE · Apr 24, 2024 · 234 m away - Minor varianceApproved
To alter the development standards, as approved under Site Specific Zoning By-law 943-2015 (OMB), which include adding an additional storey, changes to the overall height, setbacks, and parking standards, for the approved 16-storey mixed-use building (currently under construction).
181 STERLING RD · Nov 8, 2023 · 358 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 927-2022 for an 18-storey mixed-use building with a 6-storey podium, and one level of underground parking) by constructing two additional storeys, increasing the overall building height and residential gross floor area.
1423 BLOOR ST W · Sep 20, 2023 · 126 m away
Latest activity nearby
- Building permit
INSTALLATION OF INSIDE BACK WATER VALVE
85 CAMPBELL AVE · Nov 24, 2026 · 164 m away - Building permit
Proposal to construct a rear one car detached garage with laneway access.
80 SYMINGTON AVE · Nov 23, 2026 · 233 m away - Building permit
REV 01: Minor revision to location of laundry room and new mechanical permit requiredProposal for interior alterations including wall removal and the construction of a new powder room
33 SYMINGTON AVE · Nov 12, 2026 · 114 m away - Building permit
Proposed alternative solution for pool. A Class B Outdoor Public Pool will be located on the mechanical penthouse level of the building. The pool will be partially surrounded by a clearly delineated hard surfaced pool deck not less than 1,800 mm wide on three sides. The west side of the pool is not provided with a clearly delineated pool deck that is at least 1,800 mm wide. It is proposed to provide two reaching poles with shepherd's hook (min 4 m long) and two ring buoys as a compensatory measure to facilitate rescue operations
72 PERTH AVE · Oct 27, 2026 · 234 m away - Building permit
Proposed interior alterations for tenant fit-out to levels 5, 6, 7 with ancillary and support functions on levels P1, Level 1 mechanical penthouse and roof level.
77 WADE AVE · Oct 8, 2026 · 227 m away - Zoning review
Notice Sent
95 SYMINGTON AVE · Sep 30, 2026 · 291 m away - Building permit
Addition and conversion of existing single family residential house into a triplex with associated structural, plumbing and mechanical changes
149 PERTH AVE · Sep 21, 2026 · 240 m away - Building permit
Proposed new 3 storey sixplex building
214 STERLING RD · Aug 26, 2026 · 253 m away - Building permit
Proposed installation of a new kitchen exhaust system within an existing restaurant..
1334 BLOOR ST W · Aug 24, 2026 · 275 m away - Building permit
Proposed demolish existing dwelling and construct new 3 storey sixplex building
214 STERLING RD · Aug 14, 2026 · 253 m away
Neighbourhood: Junction-Wallace Emerson
About the area around the lot, not the lot itself.
- Nearest station
- Lansdowne Station6 min walk
- Nearest TTC stop
- Bloor St West at Symington Ave1 min walk
- Nearest cycling route
- Bloor St WCycle Track, 1 min walk
- Nearest traffic count
- 16,134 vehicles in 14 hBloor St W / Symington Ave, 90 m away, Oct 7, 2025
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
- Parks
- Erwin Krickhahn Park2 min walk
- West Toronto Railpath4 min walk
- 200 Sterling Road Park4 min walk
Schools within 1 km
- BISHOP MARROCCO THOMAS MERTON CATHOLIC SECONDARY SCHOOL English Separate 7 min walk
- TAMARACK WEST OUTDOOR SCHOOL Private 9 min walk
- ST LUIGI CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
- PERTH AVENUE JR PUBLIC SCHOOL English Public 12 min walk
- WESTMINSTER CLASSICAL CHRISTIAN ACADEMY ELEMENTARY SCHOOL Private 12 min walk
- SAINT FRERE ANDRE SECONDARY SCHOOL French Separate 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Junction-Wallace Emerson | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $84,000 | $84,500 |
| Households that own their home | 50% | 54% |
| Population (2021) | 23,180 | 16,813 |
| Homes built in 1960 or before | 40% | 29% |
| Homes needing major repairs | 7% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Junction-Wallace Emerson | City median |
|---|---|---|
| Assault | 720 | 636.3 |
| Robbery | 36 | 69.5 |
| Shootings | 3.6 | 10.5 |
| Auto theft | 108 | 192.6 |
| Theft over $5,000 | 32.4 | 46.1 |
| Break and enter | 230.4 | 172.8 |
| Theft from vehicles | 201.6 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.