Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register6 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 197470 PRS 00 IR (Property Standards, 2026); 26 172240 000 00 IR (Adequate Heat, 2026); 26 172239 000 00 IR (Property Standards, 2026); and 3 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations13 development applications open within 300 m
Good to know13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 69 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 94 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 26 units, built 1928).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- By-law investigation26 197470 PRS 00 IRClosed
Property Standards
Jul 7, 2026 · 142 WELLESLEY ST E - By-law investigation26 172240 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 142 WELLESLEY ST E - By-law investigation26 172239 000 00 IRClosed
Property Standards
Jun 1, 2026 · 142 WELLESLEY ST E - By-law investigation25 246440 PRS 00 IRClosed
Property Standards
Oct 29, 2025 · 138 WELLESLEY ST E - By-law investigation25 155113 HEA 00 IRClosed
Adequate Heat
May 6, 2025 · 138 WELLESLEY ST E - By-law investigation25 131368 PRS 00 IRClosed
Property Standards
Mar 19, 2025 · 138 WELLESLEY ST E - Building permit09 146728Closed - Dormant
Proposal to install 3 backflow prevention devices on the exisitng water line. There are 3 buildings side by side, one device in each building. Convenience addresses are 138, 140 and 142 Wellesley Street E.
Jun 15, 2009 · 138 WELLESLEY ST E
Check before you build
Site-specific exception 900.2.10(644)
Needs a closer look2 site-specific rules and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4)
- Rule B
The minimum front yard setback is 6.0 metres.
- Older by-law A
Section 12(1) 434 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 2,121 m²
- Frontage
- 41.4 mestimated, irregular lot
- Depth
- 63.4 mestimated, irregular lot
- Street
- Wellesley St E
- Corner lot
- Yes, also on Wellesley Pl63.4 m along it
- Public lane
- None
- House footprint
- 564 m²roof up to 12.2 m
- Back yard
- 3.2 mhouse to rear lot line
- Side yards
- 0.3 m and 30 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- 18 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d2.0) (x644) (Residential). Chapter 10, section 10.10 of the by-law. Source
- 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: linden, littleleaf (34 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 88%7 of 8 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 6
- Development applications
- 19
Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.
344 JARVIS ST · Sep 21, 2022 · 422 m away - Minor varianceRefused
To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.
50 BLEECKER ST · Jan 12, 2022 · 446 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.
50 EARL ST · Sep 15, 2021 · 252 m away - Minor varianceApproved
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
92 ISABELLA ST · Jun 30, 2021 · 386 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.
50 EARL ST · Dec 4, 2020 · 252 m away
Latest activity nearby
- Building permit
Proposal to undertake Exterior Renovations (AODA), including modifications to exterior parking areas, line painting, stairs (guards, handrails, and tactile warning indicators), installation of permeable pavers, and curbs to improve accessibility and bring the site into compliance with AODA requirements.
439 SHERBOURNE ST · Nov 3, 2026 · 270 m away - Building permit
Basement second unit
49 HOMEWOOD AVE · Aug 14, 2026 · 292 m away - Building permit
Proposal to demolish the existing detached dwelling with 2 units.See 24 216579 STE 13 SA for future development
5 HUNTLEY ST · Aug 7, 2026 · 220 m away - Building permit
REV 01: Proposed 4th unit in basementProposal for interior alterations, including the replacement of the staircase from the ground floor to the basement and the addition or replacement of non-structural walls. There are no changes to any exterior doors or windows. New beams and columns are being added in the basement.
109 GLOUCESTER ST · Jul 24, 2026 · 237 m away - Zoning review
Closed
25 LOURDES LANE · Jun 19, 2026 · 144 m away - Zoning review
Closed
10 HUNTLEY ST · Jun 2, 2026 · 226 m away - Building permit
Proposal to replace existing stairwell railings.
100 WELLESLEY ST E · Jun 1, 2026 · 182 m away - Zoning review
Closed
109 GLOUCESTER ST · May 22, 2026 · 237 m away - Zoning review
Closed
137 ISABELLA ST · May 21, 2026 · 265 m away - Building permit
Install a backflow preventer for incoming waterline.
432 SHERBOURNE ST · May 12, 2026 · 258 m away
Neighbourhood: North St.James Town
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station9 min walk
- Nearest TTC stop
- Wellesley St East at Jarvis St2 min walk
- Nearest cycling route
- Wellesley St ECycle Track, 1 min walk
- Nearest traffic count
- 9,581 vehicles in 14 hWellesley St E / Homewood Ave, 100 m away, Oct 5, 2023
- Serious collisions within 500 m
- 92021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 1 with cyclists
- Parks
- Wellesley - Magill Park1 min walk
- Barbara Hall Park4 min walk
- Bleecker Parkette5 min walk
Schools within 1 km
- JARVIS COLLEGIATE INSTITUTE English Public 2 min walk
- OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 3 min walk
- NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 4 min walk
- NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 5 min walk
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 5 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | North St.James Town | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $59,200 | $84,500 |
| Households that own their home | 11% | 54% |
| Population (2021) | 18,535 | 16,813 |
| Homes built in 1960 or before | 19% | 29% |
| Homes needing major repairs | 10% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | North St.James Town | City median |
|---|---|---|
| Assault | 1281.6 | 636.3 |
| Robbery | 76.9 | 69.5 |
| Shootings | 4.3 | 10.5 |
| Auto theft | 85.4 | 192.6 |
| Theft over $5,000 | 38.4 | 46.1 |
| Break and enter | 153.8 | 172.8 |
| Theft from vehicles | 136.7 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.