HousePrecheckCheck an address

137 Bond StDowntown Yonge East, Toronto · City records before you offer

18.3 × 30.9 m564 m²on Gould Stcorner, also on Bond St

2 things to check before you offer, including heritage property: designated (Part IV)
N10 m
18.3 m frontage30.9 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 137 Bond St

137 Bond St is on a 18.3 m by 30.9 m lot on Gould St in Downtown Yonge East. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Bond St. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.

The City has 11 records on this lot since 1998. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for a temporary base for a tower crane. the date ofinstallation will be november 6th 2025 and the removal will be on march 15th 2027". Status: closed. In 2025, a building permit was filed: "Part permit - proposal for interior alterations and an 8 storey addition to the existing building to serve as the new student health and wellness centre -…". Status: closed. In 2024, a building permit was filed: "Exposed mass timber ceiling on second floor more than 25% as permiited obc 3.1.6.4.(3)(a).the alternative solution proposal is a design to achieve at least the…". Status: approved. Nothing on file is open right now.

Within 300 m, 11 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 19 minor variance applications in the last 10 years and approved 95%. TMU station is a 4-minute walk.

Summary

What the City's records show on this house

  • Heritage property: designated (Part IV)Moderate
  • Zoning not in By-law 569-2013Moderate
  • 1 by-law investigation closed in the last two yearsLow
  • 11 development applications open within 300 mLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • 1 by-law investigation closed in the last two years
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. 1 by-law investigation closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

11 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-11-10By-law investigation
26 268203 PRS 00 IR
Property StandardsClosed
2025-12-10Building permit
25 214856
Proposal for a temporary base for a tower crane. The date ofinstallation will be November 6th 2025 and the removal will be on March 15th 2027.Closed
2025-08-29Building permit
23 195157
Part Permit - Proposal for interior alterations and an 8 storey addition to the existing building to serve as the new Student Health and Wellness Centre - O'Keefe House, Toronto Metropolitan UniversitySee also 22 156133 ZAP, 22 237820 SA and 23 131626 MV.Closed
2024-07-02Building permit
24 172992
Exposed mass timber ceiling on second floor more than 25% as permiited OBC 3.1.6.4.(3)(a).The alternative solution proposal is a design to achieve at least the minimum level of performance required by division B in the area defined by objectives and functional statements.Approved
2023-07-12Minor variance
A0349/23TEY
To alter the existing three-storey building by constructing an east side five-storey addition above, a rear eight-storey addition, front and west side third storey dormer additions, with a fourth storey rooftop terrace, and green roofs on the second, sixth, seventh, and eighth storey. The building will be used to facilitate the University Health and Wellness programs.Approved
2023-02-02Zoning review
22 237820 PSP
No description on fileClosed
2022-12-23Development application
22 242103 STE 13 OZ
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.Closed
2022-06-02Zoning review
22 156133 ZAP
No description on fileClosed
2013-09-25Building permit
13 236376
Installation of Backflow Prevention Devices (Water only).Closed
2004-09-02Building permit
04 163452
To upgrade sprinkler system on main,second and third floors.Closed
1998-01-19Building permit
98 012437
REPLACE BOILER REMOVE "VIKING" MOD.#34-8W WITH "RAYPAK" MOD.#824 LGClosed - Dormant
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: designated (Part IV)
  • Zoning not in By-law 569-2013

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: designated (Part IV)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
18.3 m frontage30.9 m deepon Gould St
Zone
—
Height limit
—
Corner lot
Yes, also on Bond St
Public lane
None
House footprint
257 m²
Back yard
9.7 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 11 development applications open within 300 m, up to 85 storeys
    • 19 minor variance decisions within 300 m, 95% approved

    What this part means for this house, in plain EnglishUnlock

    1. 11 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • TMU StationNearest station4 min walk
    • Dundas St East at Church StNearest TTC stop3 min walk
    • Gerrard St ENearest cycling route4 min walk
    • Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool1 min walk
    • Toronto Metropolitan University - School of Image ArtsSchool1 min walk
    • Toronto Metropolitan University - School of Interior DesignSchool1 min walk
    • Tmu - Heaslip HouseSchool2 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 137 Bond St

    2 things to check at 137 Bond St before you offer

    • Heritage property: designated (Part IV)Moderate
    • Zoning not in By-law 569-2013Moderate
    • 1 by-law investigation closed in the last two yearsLow
    • 11 development applications open within 300 mLow
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.