HousePrecheckCheck an address

136 Sixteenth StToronto · zoning, lot size and permit records

Employment · E 1.012.2 × 30.5 m372 m²on Sixteenth St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N10 m
12.2 m frontage30.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

    Not in these records

    • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
    • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

    History of this lot

    2 records on file: more than at 72% of Toronto houses (median 0).

    • Zoning review26 193197 ZZUClosed
      Jun 29, 2026 · 136 SIXTEENTH ST
    • Zoning review04 100127 ZPUClosed
      Jan 5, 2004 · 136 SIXTEENTH ST

    Lot facts

    Area
    372 m²
    Frontage
    12.2 m
    Depth
    30.5 m
    Street
    Sixteenth St
    Corner lot
    No
    Public lane
    None
    House footprint
    278 m²roof up to 7.1 m
    Back yard
    0.7 mhouse to rear lot line
    Side yards
    0 m and 0.8 mhouse to side lot lines; 0 is a shared wall
    Buildings on the lot
    1house, garage, sheds
    Max height
    —
    Max lot coverage
    —

    House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

    Around this lot

    Minor variances approved
    93%14 of 15 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    4
    Development applications
    0

    Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a one-storey industrial building.

      429 KIPLING AVE · Mar 20, 2025 · 386 m away
    • Minor varianceApproved

      To construct a one-storey front addition along the east side of the existing building.

      430 KIPLING AVE · Feb 8, 2024 · 400 m away
    • Minor varianceApproved

      To construct a one-storey north side addition and a three-storey south side addition which will contain an elevator and stairs.

      20 TOWNS RD · Sep 29, 2022 · 376 m away
    • Minor varianceApproved

      To permit a waste trasfer station.

      425 KIPLING AVE · Oct 22, 2015 · 322 m away
    • Minor varianceApproved

      To construct a one-storey addition (attached garage) to the rear of the existing legal non-conforming detached dwelling. The existing rear attached garage will be removed.

      156 TUPPER AVE · Apr 24, 2014 · 417 m away

    Latest activity nearby

    • Building permit

      Proposal for structural fire damage restoration

      256 BIRMINGHAM ST · Oct 27, 2026 · 283 m away
    • Building permitdemolition

      Demolition of existing one-storey single detached dwelling (approx. 145 m² GFA) at 399 Kipling Avenue. Excavation to be backfilled and site graded to existing conditions. No work to adjacent properties.

      399 KIPLING AVE · Oct 6, 2026 · 164 m away
    • Building permit

      Proposal for the repair and restoration of an existing fire-damaged semi-detached dwelling to its pre-loss condition.

      258 BIRMINGHAM ST · Sep 30, 2026 · 286 m away
    • Building permitmultiplex, new building, new house

      PROPOSED THREE STOREY SEMI-DETACHED FOURPLEX.

      254 BIRMINGHAM ST · Sep 24, 2026 · 284 m away
    • Building permitdemolition

      Proposal for demoilition of existing 2 storey dwelling and construction of 2 new semi detached fourplexes.

      254 BIRMINGHAM ST · Sep 24, 2026 · 284 m away
    • Building permitmultiplex, new building, new house

      Proposal for three storey fourplex semi-detached dwelling

      254 BIRMINGHAM ST · Sep 24, 2026 · 284 m away
    • Zoning review

      Closed

      136 SIXTEENTH ST · Jun 29, 2026 · 1 m away
    • Building permit

      Proposal to install two certified 30'x45' tents (Cert # 25-135938). Installation date: 07 May- 11 July 2026w stages and other temporary structures

      207 NEW TORONTO ST · Jun 17, 2026 · 197 m away
    • Building permit

      Proposal for rear addition at ground floor to existing single family dwellling

      88 SIXTEENTH ST · Jun 12, 2026 · 181 m away
    • Building permit

      NEW EXTERIOR RAMP TO ACCESSIBLE ENTRANCE. NEW ELEVATOR WITH ENCLOSURE AND NEW UNIVERSAL TOILET ROOM. NEW DOOR OPERATORS AND HOLD OPEN DEVICES

      350 KIPLING AVE · Jun 10, 2026 · 275 m away

    Neighbourhood: New Toronto

    About the area around the lot, not the lot itself.

    Nearest station
    Mimico GO Station34 min walk
    Nearest TTC stop
    Kipling Ave at New Toronto St2 min walk
    Nearest cycling route
    Birmingham StCycle Track, 5 min walk
    Nearest traffic count
    10,695 vehicles in 8 hKipling Ave / New Toronto St, 150 m away, Feb 8, 2022
    Serious collisions within 500 m
    32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 0 with cyclists
    Parks
    Don Russell Memorial Park5 min walk
    Birmingham Street Parkette8 min walk
    Lakeshore Village Park10 min walk

    Schools within 1 km

    • LAKESHORE COLLEGIATE INSTITUTE English Public 4 min walk
    • TWENTIETH STREET JR SCHOOL English Public 11 min walk
    • THE HOLY TRINITY SCHOOL English Separate 12 min walk
    • HUMBER COLLEGE SCHOOL - LAKESHORE CAMPUS College 13 min walk
    • ST JOSAPHAT CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
    • CHILDREN'S URBAN ENRICHMENT STUDIO Private 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureNew TorontoMedian neighbourhood
    Median household income (2020)$68,500$84,500
    Households that own their home44%54%
    Population (2021)11,34516,813
    Homes built in 1960 or before45%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleNew TorontoCity median
    Assault903.2636.3
    Robbery76.569.5
    Shootings15.310.5
    Auto theft145.4192.6
    Theft over $5,00091.946.1
    Break and enter183.7172.8
    Theft from vehicles244.9188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.