Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 26 197030 PRS 00 IR (Property Standards, 2026).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
4 records on file: more than at 88% of Toronto houses (median 0).
- By-law investigation26 197030 PRS 00 IRClosed
Property Standards
Jul 6, 2026 · 1350 THE QUEENSWAY - Building permit10 246558Closed
Proposed installation of (6) first-party, illuminated signs for "SHERWAY NISSAN". (1) ground sign, (1) overhanging structure sign and (4) wall signs. Revision to amend Building Permit due to base re-design....JFH
Jan 5, 2011 · 1350 THE QUEENSWAY - Building permit10 153122Closed
REVISION #1 to wall fire resistance ratings, reflective ceiling plan, exterior building cladding, reduce height of curtain wall, eliminate some continuous high bay windows and front facade louvers and relocate exterior stair from mezzanine floor. Refer to attached letter. Proposed interior alterations to convert wholesale portion of exisiting multi-use building to public garage/office use for "Sherway Nissan". Indicated as Area 'A' within drawing package.
Nov 8, 2010 · 1350 THE QUEENSWAY - Building permit05 205021Closed - Dormant
Upgrade an existing sprinkler system to industrial bldg.
Apr 3, 2006 · 1350 THE QUEENSWAY
Lot facts
- Area
- 17,347 m²
- Frontage
- 76.9 m
- Depth
- 232.7 m
- Street
- The Queensway
- Corner lot
- Yes, also on Plywood Pl232.7 m along it
- Public lane
- None
- House footprint
- 2,832 m²roof up to 9.7 m
- Back yard
- 107.9 mhouse to rear lot line
- Side yards
- 14.3 m and 15 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
Around this lot
- Minor variances approved
- 100%5 of 5 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a place of assembly use.
1460 THE QUEENSWAY · Dec 5, 2019 · 330 m away - Minor varianceApproved
To permit a vehicle service shop within a portion of the existing building (Unit 712).
712-740 KIPLING AVE · Jul 18, 2018 · 474 m away - Minor varianceApproved
To permit parking space location and parking space access deficiencies and to maintain the existing office uses that occupy units 200, 300 and 300A. The existing building will remain unchanged.
700 KIPLING AVE · Nov 23, 2017 · 314 m away - Minor varianceApproved
To convert the existing industrial warehouse to include a self-storage warehouse and an office with associated parking deficiencies and to construct second-storey additions above portions of the building.
1460 THE QUEENSWAY · Jul 27, 2017 · 330 m away
Latest activity nearby
- Building permit
Revision 01: to include construction of a new manhole at property line on existing sanitary service and adjustments to the fire service for water meter and backflow. The construction of new storm sewer infrastructure within the site and the associated regrading required to alleviate the drainage issues that are present in the existing conditions. The imperviousness of the site is not changing under proposed conditions. No new construction proposed.
1400 THE QUEENSWAY · Nov 4, 2026 · 176 m away - Minor varianceApproved
To permit an automobile dealership to continue to operate within the existing building. A previous Committee of Adjustment application (A0770/16EYK) approved an automobile dealership to operate for a period of 10 years.
1285 THE QUEENSWAY · Sep 24, 2026 · 276 m away - Building permit
Proposal for interior alterations, fit out for new restaurant.
1377 THE QUEENSWAY · Aug 21, 2026 · 243 m away - Building permit
Proposed interior alterations at second and third floors.
1377 THE QUEENSWAY · Aug 10, 2026 · 243 m away - Zoning review
Response Received
669 KIPLING AVE · Jul 30, 2026 · 206 m away - Zoning review
Application On Hold
1377 THE QUEENSWAY · Jun 3, 2026 · 243 m away - Zoning review
Cancelled
1377 THE QUEENSWAY · Jun 3, 2026 · 243 m away - Zoning review
Cancelled
1377 THE QUEENSWAY · May 5, 2026 · 243 m away - Building permit
Revision #01 - Changes to layout of stairs and washrooms, structural changes to foundation, and site services and grading..Proposal to construct a new automotive sales and service facility for Metro West Volvo.
1386 THE QUEENSWAY · Apr 22, 2026 · 73 m away - Building permit
Proposed interior alterations of the existing unit for a restaurant. Scope of work includes interior partitioning, kitchen exhaust, make up air, AC system, and plumbing work.
1268 THE QUEENSWAY · Mar 24, 2026 · 276 m away
Neighbourhood: Etobicoke City Centre
About the area around the lot, not the lot itself.
- Nearest station
- Kipling Station30 min walk
- Nearest TTC stop
- Kipling Ave at Warnica Ave3 min walk
- Nearest traffic count
- 16,711 vehicles in 8 hKipling Ave / Warnica Ave, 200 m away, May 22, 2019
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
- Parks
- Zorra Park9 min walk
- Senator Marian Maloney Park10 min walk
- Queensland Park10 min walk
2021 Census
| Figure | Etobicoke City Centre | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $83,000 | $84,500 |
| Households that own their home | 50% | 54% |
| Population (2021) | 23,600 | 16,813 |
| Homes built in 1960 or before | 9% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Etobicoke City Centre | City median |
|---|---|---|
| Assault | 844.4 | 636.3 |
| Robbery | 187.7 | 69.5 |
| Shootings | 16.2 | 10.5 |
| Auto theft | 601.8 | 192.6 |
| Theft over $5,000 | 200.6 | 46.1 |
| Break and enter | 210.3 | 172.8 |
| Theft from vehicles | 278.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.