Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register1 by-law investigation closed in the last two years
Good to knowClosed files (Zoning): 25 197295 ZON 00 IR (Zoning, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations2 Committee of Adjustment files on this lot
Good to know2 approved. A0054/02TEY (Make interior alterations to the existing five-storey commercial building (Dalhousie Bu..., 2002); B0142/00TO (To allow the owner to sever the lands and premises known as No. 135 Dalhousie Street (t..., 2000).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)12 development applications open within 300 m
Good to know12 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 60 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
8 records on file: more than at 98% of Toronto houses (median 0).
- By-law investigation25 197295 ZON 00 IRClosed
Zoning
Jul 21, 2025 · 135 DALHOUSIE ST - Building permit02 159501Closed
make structural alterations throughout building (above and below grade)
Nov 19, 2002 · 135 DALHOUSIE ST - Building permit02 118253Closed
Make interior alters to change use to an apartment building containing 46 dwelling units. See C of A decision (not final) HISTORICAL-ok sept 24/02
Nov 19, 2002 · 135 DALHOUSIE ST - Zoning review02 174377 PLOClosedSep 19, 2002 · 135 DALHOUSIE ST
- Minor varianceA0054/02TEYApproved
Make interior alterations to the existing five-storey commercial building (Dalhousie Building) for use as a 46-unit residential condominium. (Note: The entire complex--this building and the Merchandise building will contain a total of 523 units.)
Feb 20, 2002 · 135 DALHOUSIE ST - Zoning review01 142227 000ClosedMay 30, 2001 · 135 DALHOUSIE ST
- Zoning review01 132851 000ClosedMay 2, 2001 · 135 DALHOUSIE ST
- Consent (lot split)B0142/00TOApproved
To allow the owner to sever the lands and premises known as No. 135 Dalhousie Street (the "Dalhousie Property") from the adjacent lands by way of conveyance to a related company, partnership or other entity to facilitate potential future development; and to allow the owner to mortgage the Dalhousie Property and to partially discharge any mortgage registered or to be registered against the Dalhousie Property and adjacent lands owned by The Merchance Building Inc., including easements and/or rights-of-way.
Dec 12, 2000 · 135 DALHOUSIE ST
Check before you build
Site-specific exception 900.11.10(1390)
Needs a closer look3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 256 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 838 m²
- Frontage
- 33.4 mestimated, irregular lot
- Depth
- 33.9 mestimated, irregular lot
- Street
- Dalhousie St
- Corner lot
- No
- Public lane
- None
- Max height
- 46 m
- Max lot coverage
- —
- Major Transit Station Area: College. The lot is inside the College Major Transit Station Area approved by the Province (Site and Area Specific Policy 603). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 5.0 (c0.5; r5.0) SS1 (x1390) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 96%22 of 23 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 11
- Development applications
- 46
Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 420 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 257 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 399 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 242 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 250 m away
Latest activity nearby
- Building permit
Installation of new vertical condensate drain risers to collect condensate from existing piping outlets at the balconies
145 MUTUAL ST · Nov 20, 2026 · 202 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 181 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 278 m away - Building permit
Proposal for replacement of existing 1-1/2" Watts 375XL reduced pressure (RP) backflow prevention device serving existing high-rise condominium building. Device located in PH mechanical room.
181 DUNDAS ST E · Oct 8, 2026 · 198 m away - Building permit
Proposed project consists of security system upgrades including CCTV coverage throughout both exit stairwells and around the building perimeter, along with access control upgrades at stairwell and crossover floor doors.
65 DUNDAS ST E · Oct 6, 2026 · 210 m away - Building permit
Proposal to replace existing make-up air unit and associated structural reinforcement work.
192 JARVIS ST · Oct 2, 2026 · 176 m away - Building permit
Proposal to replace roof top mounted mechanical units.
311 JARVIS ST · Oct 1, 2026 · 264 m away - Building permit
Balcony Remedial work - Isolated conc. repair and brick masonry repair, Installation of new waterproofing system, Replace existing balcony guardrail with new.Convenience address is 279 Jarvis St
257 JARVIS ST · Sep 25, 2026 · 170 m away - Building permit
Proposal to replace existing make-up air unit and associated structural reinforcement work.
192 JARVIS ST · Sep 16, 2026 · 176 m away - Building permit
Installation of a new maglock at P1 stairwell and a new key switch in FACP room
65 MUTUAL ST · Sep 10, 2026 · 207 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station6 min walk
- Nearest TTC stop
- Dundas St East at Church St1 min walk
- Nearest cycling route
- Shuter StCycle Track, 4 min walk
- Nearest traffic count
- 10,362 vehicles in 8 hDundas St E / Dalhousie St, 70 m away, Apr 2, 2001
- Serious collisions within 500 m
- 222021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 4 with cyclists
- Parks
- Arena Gardens2 min walk
- Toronto Metropolitan University Square4 min walk
- 45 Dalhousie St Park5 min walk
Schools within 1 km
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 2 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 3 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF IMAGE ARTS University 3 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 4 min walk
- TMU - HEASLIP HOUSE University 4 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.