HousePrecheckCheck an address

133 Merrill Ave EToronto · zoning, lot size and permit records

Residential · R (d0.6) (x736)35.9 × 41.4 m1,476 m²on Merrill Ave Ecorner, also on Woodbine Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 3 storeys, 42 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelStill open in the City's records: 17 181822 (Boilers replacement, 2017, status Permit Issued); 17 181814 (Make up air units and boilers replacement, 2017, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • City upkeep score: 96 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: WoodbineThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
35.9 m frontage41.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2017

    Needs a closer look

    Still open in the City's records: 17 181822 (Boilers replacement, 2017, status Permit Issued); 17 181814 (Make up air units and boilers replacement, 2017, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Rental building evaluation: 96 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (3 storeys, 42 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 232562 LGW 00 IRRescheduled

    Long Grass and Weeds

    Sep 4, 2026 · 133 MERRILL AVE E
  • Building permit18 267458Closed

    Proposal to install a new premise isolation back flow prevention device

    Jan 14, 2019 · 133 MERRILL AVE E
  • Building permit17 181822Permit Issued

    Boilers replacement

    Jul 19, 2017 · 133 MERRILL AVE E
  • Building permit17 181814Permit Issued

    Make up air units and boilers replacement

    Jul 18, 2017 · 133 MERRILL AVE E

Check before you build

  • Exception 900.2.10(736) does not apply to this address

    Good to know

    The exception covers this area, but each of its 19 parts names other addresses. The standard rules on this page apply.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(736)Does not apply

Every part of the exception names other addresses. The standard rules apply to this lot.

19 parts for other addresses
  • A On lands municipally known as the odd numbered addresses of 91-209 Parkmount Road and 160 Mountjoy Avenue, in addition to the requirements of Section 150.7, a …
  • A On 50 Bain Ave., former City of Toronto by-law 372-78
  • B On or between the odd numbered addresses of 71-117 Blake St., City of Toronto by-law 136-78
  • C On 10 Boultbee Ave., former City of Toronto by-law 22936
  • D On 66 Boultbee Ave., former City of Toronto by-laws 370-77, 458-83 and 742-83
  • E On 655 Broadview Ave., former City of Toronto by-law 54-67
  • F On 60 Cavell Ave., 97 Cavell Ave., former City of Toronto by-law 299-75
  • G On 39 Harcourt Ave., former City of Toronto by-law 356-75
  • H On 148 Hazelwood Ave., former City of Toronto by-law 94-0737
  • I On 10 Hogarth Ave., former City of Toronto by-law 54-67
  • J On 885 Logan Ave., City of Toronto by-law 686-01
  • K On 24 Mountjoy Ave., former City of Toronto by-law 226-69
  • L On 369 Pape Ave., former City of Toronto by-law 414-78; 555-78
  • M On 660 Pape Ave., former City of Toronto by-law 356-75
  • N On 662 Pape Ave., City of Toronto by-law 533-01
  • O On 720 Rhodes Ave., former City of Toronto by-law 22876
  • P On 355 Riverdale Ave., former City of Toronto by-law 154-80
  • Q On or between the even numbered addresses of 100-110 Unity Rd., former City of Toronto by-laws 118-82; 474-82, 595-82, 80-84 and 229-84
  • R On or between the odd numbered addresses of 887-903 Woodbine Ave., former City of Toronto by-law 273-93.
By-law 569-2013, Chapter 900

Lot facts

Area
1,476 m²
Frontage
35.9 m
Depth
41.4 m
Street
Merrill Ave E
Corner lot
Yes, also on Woodbine Ave41.4 m along it
Public lane
None
House footprint
378 m²roof up to 14.1 m
Back yard
0 mhouse to rear lot line
Side yards
6.2 m and 14.1 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Woodbine. The lot is inside the Woodbine Major Transit Station Area approved by the Province (Site and Area Specific Policy 620). Source
  • Zone R (d0.6) (x736) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
97%28 of 29 decisions
Garden suite permits
3
Laneway suite permits
1
Multiplex permits
1
Development applications
1

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 29 variance decisions: more than at 62% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a basement addition below.

    29 IONA AVE · Jul 8, 2026 · 343 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by enclosing the front porch into habitable space. Also, to construct a new front landing with stairs.

    24 CEDARVALE AVE · Apr 15, 2026 · 209 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition (the existing rear one-storey will be demolished).

    34 DARRELL AVE · Nov 19, 2025 · 186 m away
  • Minor varianceApproved

    To construct a new one-storey ancillary building (to contain one garden suite with storage and bicycle parking), in the rear yard of the existing two-storey semi-detached dwelling. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).

    49 WEST LYNN AVE · Aug 20, 2025 · 273 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by enclosing the existing front porch (verandah) and constructing a new front landing with stairs.

    96 WEST LYNN AVE · Aug 13, 2025 · 334 m away

Latest activity nearby

  • Building permit

    Proposal to convert exsiting office to a Coffee Shop&Bar (30 Seats)

    2017 DANFORTH AVE · Nov 23, 2026 · 284 m away
  • Building permit

    Basement plumbing and drain alterations, including the installation of a backwater valve, sump pit, and sump pump.

    91 MOBERLY AVE · Nov 20, 2026 · 214 m away
  • Building permit

    Proposal for the reconstruction of an existing enclosed porch with new stair and guard

    8 CEDARVALE AVE · Nov 18, 2026 · 191 m away
  • Building permit

    Proposed fire alarm system for the building.

    2017 DANFORTH AVE · Nov 16, 2026 · 284 m away
  • Building permit

    Upgrade current water service line to 3/4 inch

    41 EAST LYNN AVE · Nov 16, 2026 · 171 m away
  • Building permit

    Proposal to increase seating capacity to 40 by converting basement into a dining area.

    2009 DANFORTH AVE · Oct 15, 2026 · 290 m away
  • Zoning review

    Closed

    8 CEDARVALE AVE · Oct 7, 2026 · 191 m away
  • Building permit

    Proposal for interior alterations to ground floor for new takeout bakery.

    1926 GERRARD ST E · Sep 23, 2026 · 267 m away
  • Zoning review

    Closed

    1929 GERRARD ST E · Aug 27, 2026 · 299 m away
  • Building permit

    Install sanitary line backwater valve and replacement of 24 feet of interior clay sanitary line with 4" PVC

    56 MOBERLY AVE · Aug 27, 2026 · 151 m away

Neighbourhood: Woodbine Corridor

About the area around the lot, not the lot itself.

Nearest station
Woodbine Station6 min walk
Nearest TTC stop
Woodbine Ave at Merrill Ave South Side1 min walk
Nearest cycling route
Woodbine AveCycle Track, 1 min walk
Nearest traffic count
7,699 vehicles in 8 hWoodbine Ave / Merrill Ave E, 40 m away, Feb 13, 2020
Serious collisions within 500 m
62021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 2 with cyclists
Parks
Oakcrest Parkette1 min walk
Merrill Bridge Road Park3 min walk
Wildwood Crescent Playground3 min walk

Schools within 1 km

  • GLEDHILL JR PUBLIC SCHOOL English Public 9 min walk
  • ST BRIGID CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
  • EARL HAIG PUBLIC SCHOOL English Public 12 min walk
  • BOWMORE ROAD JR & SR PUBLIC SCHOOL English Public 13 min walk
  • EARL BEATTY JR & SR PUBLIC SCHOOL English Public 13 min walk
  • GEORGES ETIENNE CARTIER CATHOLIC ELEMENTARY SCHOOL French Separate 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWoodbine CorridorMedian neighbourhood
Median household income (2020)$97,000$84,500
Households that own their home60%54%
Population (2021)12,20516,813
Homes built in 1960 or before66%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWoodbine CorridorCity median
Assault728.8636.3
Robbery21.969.5
Auto theft65.6192.6
Theft over $5,00043.746.1
Break and enter123.9172.8
Theft from vehicles131.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.