HousePrecheckCheck an address

133 Erskine AveToronto · zoning, lot size and permit records

Residential · R (d2.0) (x912)28.2 × 40.6 m1,135 m²on Erskine Avecorner, also on Redpath Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 11 storeys, 28 rental units, built 1970More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • Permits or applications open on this parcelRecent records on this lot: 22 131509 NNY 15 SA (Proposed Development consists of a new 31-storey (102 metres in height) residential bui..., 2022); 21 251207 NNY 15 OZ (Revised Zoning By-law Amendment Application for a 35-storey mixed-use building containi..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 15 development applications open within 300 m, up to 39 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: Mount PleasantThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
28.2 m frontage40.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 7 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 258379 PRS 00 IR (Property Standards, 2026); 26 226233 PRS 00 IV (Order Issued Property Standards: Dwelling unit window that is capable of being opened h..., 2026); 26 226207 PRS 00 IR (Property Standards, 2026); and 4 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 131509 NNY 15 SA (Proposed Development consists of a new 31-storey (102 metres in height) residential bui..., 2022); 21 251207 NNY 15 OZ (Revised Zoning By-law Amendment Application for a 35-storey mixed-use building containi..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0471/22NY (Proposal to seek relief for floor space index, gross floor area, and landscaping requir..., 2023).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 39 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (11 storeys, 28 units, built 1970).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 258379 PRS 00 IRClosed

    Property Standards

    Oct 21, 2026 · 133 ERSKINE AVE
  • By-law investigation26 226233 PRS 00 IVClosed

    Order Issued Property Standards: Dwelling unit window that is capable of being opened has no screen.Namely: Units #503 and 502; In a dwelling unit, a window located more than 2,000 millimetres above grade opens within 1,500 millimetres of the floor not leading to a balcony does not emplo

    Aug 26, 2026 · 133 ERSKINE AVE
  • By-law investigation26 226207 PRS 00 IRClosed

    Property Standards

    Aug 26, 2026 · 133 ERSKINE AVE
  • By-law investigation26 204458 PRS 00 IRClosed

    Property Standards

    Jul 18, 2026 · 133 ERSKINE AVE
  • By-law investigation26 170752 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 133 ERSKINE AVE
  • By-law investigation26 170751 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 133 ERSKINE AVE
  • By-law investigation25 179682 PRS 00 IRClosed

    Property Standards

    Jun 18, 2025 · 133 ERSKINE AVE
  • Minor varianceA0471/22NYApproved

    Proposal to seek relief for floor space index, gross floor area, and landscaping requirements. No new structure proposed for this application. Please note, this application is related to a delegated lot addition consent application (B0035/22NY) to be considered by the Deputy Secretary-Treasurer.

    Jan 19, 2023 · 133 ERSKINE AVE
Show 11 older records
  • Zoning review22 131509 PSPClosed
    May 10, 2022 · 133 ERSKINE AVE
  • Development application22 131509 NNY 15 SAUnder Review

    Proposed Development consists of a new 31-storey (102 metres in height) residential building with 296 new condominium units and 26 rental replacement units for a total of 322 dwelling units. The total residential gross floor area (GFA) is 22,243 square metres (15.3 FSI). A total of 89 associated parking spaces and 322 bicycle parking spaces will be proposed. The Proposed Development will include the demolition and replacement of the existing 26 rental units.

    Apr 6, 2022 · 133 ERSKINE AVE · City file
  • Zoning review22 117584 ZPRClosed
    Feb 25, 2022 · 133 ERSKINE AVE
  • Zoning review21 251207 PRZClosed
    Jan 24, 2022 · 133 ERSKINE AVE
  • Development application21 251207 NNY 15 OZOMB Approved

    Revised Zoning By-law Amendment Application for a 35-storey mixed-use building containing 366 residential units (340 new residential dwelling units and 26 rental replacement units). The development will also have grade-level retail at the northwest corner. The development contains 23,730 square metres of residential gross floor area and 94 square meters of retail gross floor area.

    Dec 23, 2021 · 133 ERSKINE AVE · City file
  • Building permit14 206817Closed

    Localized concrete balcony slab repairs (12 nos.) and replacement of existing railing (165m)

    Sep 3, 2014 · 133 ERSKINE AVE
  • Building permit14 206811Closed

    Localized concrete slab repairs to existing underground parking garage slab.

    Aug 29, 2014 · 133 ERSKINE AVE
  • Building permit11 279713Closed

    Int. Alt. - 10 and 11 floors

    Oct 27, 2011 · 133 ERSKINE AVE
  • Zoning review11 258940 ZPRClosed
    Aug 17, 2011 · 133 ERSKINE AVE
  • Building permit09 194542Closed

    Installation of one 2" backflow with expansion tank within the existing apartment building

    Dec 30, 2009 · 133 ERSKINE AVE
  • Building permit99 019817Closed

    INSTALL IN EACH OF 3RD, 4TH, 5TH, 6TH, 7TH, 8TH, 9TH FLOOR: 1 W.B., 1 B.T., 1 W.C. SEE 425612 COST INCLUDED EDC

    Aug 3, 1999 · 133 ERSKINE AVE

Check before you build

  • Site-specific exception 900.2.10(912)

    Needs a closer look

    1 site-specific rule and 3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(912)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Any addition or extension above the first storey of a lawfully existing detached house must comply with the minimum building setbacks required by this By-law. [TO: 438-86; 12 (2) 193]

  2. Older by-law A

    Section 12(2) 118 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  4. Older by-law E

    On or between the odd numbered addresses of 133-141 Erskine Avenue, the odd numbered addresses of 165-171 Erskine Avenue, former City of Toronto by-law 20904

3 parts for other addresses
  • C On 107 Broadway Avenue, City of Toronto By-law 165-69
  • D On 15 Erskine Avenue, former City of Toronto by-law 195-67
  • F On the even numbered addresses of 140-144 Redpath Avenue, City of Toronto by-law 49-02.
By-law 569-2013, Chapter 900

Lot facts

Area
1,135 m²
Frontage
28.2 m
Depth
40.6 m
Street
Erskine Ave
Corner lot
Yes, also on Redpath Ave40.6 m along it
Public lane
None
House footprint
312 m²roof up to 35.2 m
Back yard
10.6 mhouse to rear lot line
Side yards
6.2 m and 7.2 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
38 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Mount Pleasant. The lot is inside the Mount Pleasant Major Transit Station Area approved by the Province (Site and Area Specific Policy 680). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone R (d2.0) (x912) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
95%21 of 22 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
39

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 323 m away
  • Minor varianceRefused

    To construct a new three (3) storey detached dwelling with a secondary suite in the basement.File Numbers B0016/26NY, A0267/26NY & A0268/26NY will be considered jointly.

    80 SHERWOOD AVE · Nov 12, 2026 · 323 m away
  • Minor varianceApproved

    To alter the existing semi-detached dwelling by constructing a rear second storey addition.

    50 SHERWOOD AVE · May 21, 2026 · 366 m away
  • Minor varianceApproved

    To alter the development standards for the 50-storey mixed-use building (approved under Site-Specific Zoning By-law 1133-2023) by permitting a non-residential use (eating establishment/take-out eating establishment with an outdoor patio abutting Redpath Avenue) at-grade and increasing the total number of small vehicle parking spaces to 8 parking spaces. This building will contain 599 residential dwelling units including 15 rental replacement units.

    170 ROEHAMPTON AVE · Apr 1, 2026 · 288 m away
  • Minor varianceApproved

    To alter the development standards (as approved through Site-Specific By-law No. 82-2023(OLT)) for the proposed 43-storey apartment building, to increase the gross floor area, building height, and number of storeys, and to permit encroachments into the required side yard setbacks and encroachments above the maximum building height, as well as to reduce the required amenity space and parking space rates. Please note a previous Minor Variance application (File No. A0163/25NY) for the subject property was before the Committee of Adjustment on June 12, 2025, which was approved on condition.

    241 REDPATH AVE · Feb 19, 2026 · 45 m away

Latest activity nearby

  • Building permit

    Install a Electro Magnetic Locking Device on PH Level (17th floor)

    55 ERSKINE AVE · Nov 24, 2026 · 228 m away
  • Building permit

    Proposal for multiple repairs at P1 Garage Parking Level

    66 BROADWAY AVE · Nov 23, 2026 · 178 m away
  • Building permit

    Proposal to repair loose concrete for balcony slab edge and replace the guardrail surrounding the property.

    171 ERSKINE AVE · Nov 3, 2026 · 154 m away
  • Building permit

    Proposed to construct a new storage shed in the backyard

    121 SHERWOOD AVE · Oct 22, 2026 · 300 m away
  • Building permit

    Proposal to install two Maglocks - doors P100b and P00b at the level P1.

    170 ROEHAMPTON AVE · Oct 14, 2026 · 288 m away
  • Building permit

    Replace Domestic Hot and Cold Risers

    900 MOUNT PLEASANT RD · Sep 9, 2026 · 172 m away
  • Zoning review

    Closed

    894 MOUNT PLEASANT RD · Aug 21, 2026 · 218 m away
  • Zoning review

    Closed

    115 BROADWAY AVE · Aug 20, 2026 · 176 m away
  • Zoning review

    Closed

    241 REDPATH AVE · Aug 12, 2026 · 45 m away
  • Building permit

    Replace Existing fire alarm control panel which is obsolete with new with Annunciation to match

    55 ERSKINE AVE · May 29, 2026 · 228 m away

Neighbourhood: North Toronto

About the area around the lot, not the lot itself.

Nearest station
Mount Pleasant Station8 min walk
Nearest TTC stop
Mt Pleasant Rd at Erskine Ave3 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 2 min walk
Nearest traffic count
2,772 vehicles in 8 hErskine Ave / Redpath Ave / Redpath Avenue Parkette Trl, 40 m away, Mar 24, 2021
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 0 with cyclists
Parks
Redpath Avenue Parkette1 min walk
Dawn Redwood Park2 min walk
85 Keewatin Ave Park3 min walk

Schools within 1 km

  • MANOR MONTESSORI SCHOOL - MT PLEASANT Private 4 min walk
  • JOHN FISHER JR PUBLIC SCHOOL English Public 5 min walk
  • NORTH TORONTO COLLEGIATE INSTITUTE English Public 5 min walk
  • NORTHERN SECONDARY SCHOOL English Public 6 min walk
  • ST MONICA CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • WILLOWDALE HIGH SCHOOL Private 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNorth TorontoMedian neighbourhood
Median household income (2020)$70,000$84,500
Households that own their home19%54%
Population (2021)15,88516,813
Homes built in 1960 or before9%29%
Homes needing major repairs4%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNorth TorontoCity median
Assault626.8636.3
Robbery53.469.5
Auto theft68192.6
Theft over $5,00024.346.1
Break and enter174.9172.8
Theft from vehicles63.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.