Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
4 building permits open, the oldest since 2008
Needs a closer lookStill open in the City's records: 20 127098 (Proposal to install a 2" DCVA backflow prevention device, 2020, status Revocation Pending); 09 174993 (To install new ducktwork, 2009, status Inspection); 08 142928 (Plumbing (interior piping and fixture) upgrade in an existing industrial space ** Hakim..., 2008, status Inspection); and 1 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 21 210066 WET 03 SA (To permit a mixed-use development on the Lands, in conformity with the Official Plan de..., 2021); 20 176082 WET 03 OZ (To permit a mixed-use development on the Lands, in conformity with the Official Plan de..., 2020).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications2 Committee of Adjustment files on this lot
Good to know2 approved. A103/08EYK (To reconstruct the existing north wall and sections of the east and west perimeter walls, 2008); A222/06EYK (To use a portion of the existing warehouse as a furniture retail showroom, 2006).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)2 development applications open within 300 m
Good to know2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
13 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review21 210066 PSPClosedDec 1, 2021 · 1325 THE QUEENSWAY
- Development application21 210066 WET 03 SAUnder Review
To permit a mixed-use development on the Lands, in conformity with the Official Plan designation. The proposal will be completed in two phases with a 46-storey residential tower (Tower 1) located on the eastern portion of the Lands and a 35-storey residential tower (Tower 2) located on the western portion. An eleven storey base building with retail and daycare uses at grade along The Queensway, and with below grade parking, occupies the entire site. The base building will be connected to the towers with a 4-storey building on both east and west sides of the property. The application for a Zoning By-law Amendment was approved at the Ontario Land Tribunal (OLT) on October 17, 2023 to permit the development and the applicant has resubmitted the application to address conditions of approval. OLT File Number is OLT -21-00179. This is a resubmission of the Site Plan Control application to align with the resubmitted Zoning By-law Amendment application.
Sep 9, 2021 · 1325 THE QUEENSWAY · City file - Zoning review20 176082 PRZClosedJul 27, 2021 · 1325 THE QUEENSWAY
- Development application20 176082 WET 03 OZOMB Approved
To permit a mixed-use development on the Lands, in conformity with the Official Plan designation. The proposal will be completed in two phases with a 46-storey residential tower (Tower 1) located on the eastern portion of the Lands and a 35-storey residential tower (Tower 2) located on the western portion. An eleven storey base building with retail and daycare uses at grade along The Queensway, and with below grade parking, occupies the entire site. The base building will be connected to the towers with a 4-storey building on both east and west sides of the property. The application for a Zoning By-law Amendment was approved at the Ontario Land Tribunal (OLT) on October 17, 2023 to permit the development and the applicant has resubmitted the application to address conditions of approval. OLT File Number is OLT -21-00179.
Aug 4, 2020 · 1325 THE QUEENSWAY · City file - Building permit20 127098Revocation Pending
Proposal to install a 2" DCVA backflow prevention device.
May 4, 2020 · 1325 THE QUEENSWAY - Building permit09 174993Inspection
To install new ducktwork.
Dec 4, 2009 · 1325 THE QUEENSWAY - Building permit08 142928Inspection
Plumbing (interior piping and fixture) upgrade in an existing industrial space ** Hakim Optical **
Apr 16, 2008 · 1325 THE QUEENSWAY - Building permit07 286210Inspection
Replace north and part of east and west walls with steel/glass and EIFS from brick and block. Canopy, ramp and stairs.
Apr 10, 2008 · 1325 THE QUEENSWAY
Show 5 older records
- Minor varianceA103/08EYKApproved
To reconstruct the existing north wall and sections of the east and west perimeter walls.
Mar 6, 2008 · 1325 THE QUEENSWAY - Minor varianceA222/06EYKApproved
To use a portion of the existing warehouse as a furniture retail showroom.
May 18, 2006 · 1325 THE QUEENSWAY - Zoning review06 112859 ZPRClosedFeb 27, 2006 · 1325 THE QUEENSWAY
- Building permit02 196172Closed
Interior alterations to existing office to create new office for **Telus Mobility**
Dec 16, 2002 · 1325 THE QUEENSWAY - Building permit00 127997Closed
Interior alterations to industrial building. Plumbing permit included. UNIT 3
Mar 3, 2000 · 1325 THE QUEENSWAY
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 6,816 m²
- Frontage
- 88.1 m
- Depth
- 81 m
- Street
- The Queensway
- Corner lot
- No
- Public lane
- None
- House footprint
- 3,244 m²roof up to 10.4 m
- Back yard
- 11.1 mhouse to rear lot line
- Side yards
- 15.3 m and 17.7 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%4 of 4 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 4
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit an automobile dealership to continue to operate within the existing building. A previous Committee of Adjustment application (A0770/16EYK) approved an automobile dealership to operate for a period of 10 years.
1285 THE QUEENSWAY · Sep 24, 2026 · 167 m away - Minor varianceRefused
To permit an Amusement Arcade within a portion of the existing building.
360 EVANS AVE · Jul 30, 2026 · 456 m away - Minor varianceApproved
To construct a new detached dwelling with an attached garage.
17 CULNAN AVE · Apr 23, 2026 · 399 m away - Minor varianceApproved
To alter the development standards as outlined in By-law 1286-2023 to accommodate a 33-storey residential building.
10 ZORRA ST · Dec 4, 2025 · 456 m away - Minor varianceApproved
To modify the development standards from site specific By-law 199-2022.
1306 THE QUEENSWAY · Aug 29, 2024 · 153 m away
Latest activity nearby
- Building permit
Revision 01: to include construction of a new manhole at property line on existing sanitary service and adjustments to the fire service for water meter and backflow. The construction of new storm sewer infrastructure within the site and the associated regrading required to alleviate the drainage issues that are present in the existing conditions. The imperviousness of the site is not changing under proposed conditions. No new construction proposed.
1400 THE QUEENSWAY · Nov 4, 2026 · 292 m away - Minor varianceApproved
To permit an automobile dealership to continue to operate within the existing building. A previous Committee of Adjustment application (A0770/16EYK) approved an automobile dealership to operate for a period of 10 years.
1285 THE QUEENSWAY · Sep 24, 2026 · 167 m away - Building permit
Proposal for interior alterations, fit out for new restaurant.
1377 THE QUEENSWAY · Aug 21, 2026 · 147 m away - Building permit
Proposed interior alterations at second and third floors.
1377 THE QUEENSWAY · Aug 10, 2026 · 147 m away - Zoning review
Response Received
669 KIPLING AVE · Jul 30, 2026 · 281 m away - Zoning review
Application On Hold
1377 THE QUEENSWAY · Jun 3, 2026 · 147 m away - Zoning review
Cancelled
1377 THE QUEENSWAY · Jun 3, 2026 · 147 m away - Zoning review
Cancelled
1377 THE QUEENSWAY · May 5, 2026 · 147 m away - Building permit
Revision #01 - Changes to layout of stairs and washrooms, structural changes to foundation, and site services and grading..Proposal to construct a new automotive sales and service facility for Metro West Volvo.
1386 THE QUEENSWAY · Apr 22, 2026 · 184 m away - Building permit
Proposed interior alterations of the existing unit for a restaurant. Scope of work includes interior partitioning, kitchen exhaust, make up air, AC system, and plumbing work.
1268 THE QUEENSWAY · Mar 24, 2026 · 221 m away
Neighbourhood: Etobicoke City Centre
About the area around the lot, not the lot itself.
- Nearest station
- Kipling Station33 min walk
- Nearest TTC stop
- The Queensway at Kipling Ave1 min walk
- Nearest traffic count
- 17,755 vehicles in 8 hKipling Ave / Kipling S Gardiner Expy Collectors W Ramp, 120 m away, Feb 8, 2022
- Serious collisions within 500 m
- 52021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
- Parks
- Zorra Park7 min walk
- Senator Marian Maloney Park8 min walk
- Queensland Park11 min walk
2021 Census
| Figure | Etobicoke City Centre | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $83,000 | $84,500 |
| Households that own their home | 50% | 54% |
| Population (2021) | 23,600 | 16,813 |
| Homes built in 1960 or before | 9% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Etobicoke City Centre | City median |
|---|---|---|
| Assault | 844.4 | 636.3 |
| Robbery | 187.7 | 69.5 |
| Shootings | 16.2 | 10.5 |
| Auto theft | 601.8 | 192.6 |
| Theft over $5,000 | 200.6 | 46.1 |
| Break and enter | 210.3 | 172.8 |
| Theft from vehicles | 278.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.