HousePrecheckCheck an address

1320 Gerrard St EToronto · zoning, lot size and permit records

Commercial residential · CR 2.0 (c1.0; r2.0) SS2 (x1573)27.4 × 36.8 m1,003 m²on Gerrard St Ecorner, also on Glenside Avebacks onto Ln N Gerrard E Redwood

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 5 storeys, 45 rental units, built 1994More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 3 development applications open within 300 m, up to 12 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
  • City upkeep score: 96 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
27.4 m frontage36.8 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 25 248759 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 12 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 96 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (5 storeys, 45 units, built 1994).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • By-law investigation26 128439 WST 00 IRClosed

    Waste

    Mar 12, 2026 · 1320 GERRARD ST E
  • By-law investigation25 248759 PRS 00 IRClosed

    Property Standards

    Nov 3, 2025 · 1320 GERRARD ST E
  • By-law investigation25 197777 WST 00 IRClosed

    Waste

    Jul 21, 2025 · 1320 GERRARD ST E
  • Building permit18 249800Closed

    Proposal to install backflow prevention device.

    Nov 28, 2018 · 1320 GERRARD ST E
  • Building permit14 256154Closed

    Heating Boiler Replacement

    Dec 8, 2014 · 1320 GERRARD ST E
  • Building permit10 109837Closed

    Proposal to install two back flow prevention devices

    Feb 23, 2010 · 1320 GERRARD ST E
  • Building permit01 165877Closed

    Install six telecommunication antennas on roof top on one tower.

    Oct 10, 2001 · 1320 GERRARD ST E
  • Zoning review84 026951 LTOClosed
    Nov 5, 1984 · 1320 GERRARD ST E

Check before you build

  • Site-specific exception 900.11.10(1573)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(1573)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86

  2. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86

2 parts for other addresses
  • B On or between the even numbered addresses of 1460-1470 Gerrard St. E., former City of Toronto by-law 879-78.
  • B On or between the even numbered addresses of 1460-1470 Gerrard St. E., former City of Toronto by-law 879-78.
By-law 569-2013, Chapter 900

Lot facts

Area
1,003 m²
Frontage
27.4 m
Depth
36.8 m
Street
Gerrard St E
Corner lot
Yes, also on Glenside Ave36.8 m along it
Public lane
Ln N Gerrard E Redwood, 35.6 m along it
House footprint
714 m²roof up to 19.2 m
Back yard
6.3 mhouse to rear lot line
Side yards
0.1 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
12 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone CR 2.0 (c1.0; r2.0) SS2 (x1573) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 2 City trees in front of this lot. The City's street tree inventory lists 2 trees at this address: elm, accolade (24 cm), elm, accolade (22 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%50 of 52 decisions
Garden suite permits
4
Laneway suite permits
4
Multiplex permits
18
Development applications
5

Within 300 m, last 10 years. 26 suite and multiplex permits: more than at 92% of Toronto houses (median 3). 52 variance decisions: more than at 87% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey mixed-use building by converting the rear portion of ground floor area into a new cafe/sandwich shop, and to construct a total of seven hotel rooms (two within the basement and five on the second level). The existing restaurant within the front portion of the ground floor, and the storage area within a portion of the basement area will be maintained.

    1416 GERRARD ST E · Apr 29, 2026 · 293 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed-use rowhouse dwelling by constructing a rear three-storey addition with a basement walkout, and an exterior fire escape staircase leading to all the levels. Also, to construct one ground level office space, and four residential dwelling units within this dwelling. There will be a total of five bicycle parking spaces provided in the rear yard. The existing ground level commercial space (coin laundry facility) will be maintained and unaltered.

    1250 GERRARD ST E · Feb 25, 2026 · 176 m away
  • Minor varianceApproved

    To construct a new five-storey mixed-use building, with a front fourth storey terrace, a rear fifth storey terrace, and a complete sixth storey roof terrace. There will be six dwelling units on the lot.

    1409 GERRARD ST E · Jul 19, 2023 · 256 m away
  • Minor varianceApproved

    To alter the existing two-storey mixed-use building by constructing a one-storey rear addition (single-car garage) and a new vestibule stairs for additional access to the second storey residential units. Also, to convert an existing integral garage into a personal service shop.

    249 GREENWOOD AVE · Aug 10, 2022 · 138 m away
  • Minor varianceApproved

    To alter the existing two-storey commercial building by making interior alterations to the ground floor and basement area for a new restaurant.

    1481 GERRARD ST E · Jun 2, 2021 · 483 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached dwelling by demolishing the existing front porch and constructing a new one-storey enclosed front porch addition (mudroom) with stairs.

    274 GREENWOOD AVE · Dec 16, 2026 · 286 m away
  • Zoning review

    Application On Hold

    1365 GERRARD ST E · Nov 25, 2026 · 142 m away
  • Building permit

    Proposed interior alterations at 2nd floor residential units

    1346 GERRARD ST E · Nov 20, 2026 · 145 m away
  • Building permitmultiplex

    REVISION - removal of the mezzanine levelProposal for 3 storey Rear addition to existing 2 storey single family semi detached, and convert to triplex, underpin of existing footing

    316 HIGHFIELD RD · Nov 16, 2026 · 247 m away
  • Zoning review

    Not Started

    254 GREENWOOD AVE · Nov 5, 2026 · 234 m away
  • Building permitmultiplex

    New deck landing and door for second entry to main floor

    254 GREENWOOD AVE · Nov 5, 2026 · 234 m away
  • Building permit

    Proposal to install back water valve

    89 HIGHFIELD RD · Nov 3, 2026 · 276 m away
  • Building permit

    Revision-01Proposed 2-Storey Rear Addition, Interior Alterations and new Rear Deck to an existing 2-Storey Single-Family Dwelling

    75 REDWOOD AVE · Oct 29, 2026 · 234 m away
  • Building permit

    Proposal for rear deck

    1292 GERRARD ST E · Oct 23, 2026 · 95 m away
  • Building permitmultiplex, new building, new house

    REV01: Proposal for structural revisions to 26 178182 BLD 00 NHProposal to construct a 3 storey sixplex, with rear deck and basement walkout

    41 RICHARD AVE · Oct 21, 2026 · 135 m away

Neighbourhood: Greenwood-Coxwell

About the area around the lot, not the lot itself.

Nearest station
Greenwood Station21 min walk
Nearest TTC stop
Gerrard St East at Greenwood Ave2 min walk
Nearest cycling route
Greenwood AveBike Lane, 2 min walk
Nearest traffic count
154 vehicles in 8 hHighfield Rd / Richard Ave, 150 m away, Oct 2, 2006
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
Greenwood Park3 min walk
The Rail Garden8 min walk
Monarch Park9 min walk

Schools within 1 km

  • KEW PARK MONTESSORI SCHOOL - HIAWATHA Private 6 min walk
  • RODEN PUBLIC & EQUINOX HOLISTIC ALTERNATIVE English Public 6 min walk
  • LESLIEVILLE JR PUBLIC SCHOOL English Public 11 min walk
  • DUKE OF CONNAUGHT JR & SR PUBLIC SCHOOL English Public 11 min walk
  • RIVERDALE COLLEGIATE INSTITUTE English Public 12 min walk
  • ST PATRICK CATHOLIC SECONDARY SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureGreenwood-CoxwellMedian neighbourhood
Median household income (2020)$93,000$84,500
Households that own their home59%54%
Population (2021)14,12016,813
Homes built in 1960 or before64%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleGreenwood-CoxwellCity median
Assault671.1636.3
Robbery58.169.5
Homicide6.55.3
Shootings6.510.5
Auto theft148.4192.6
Theft over $5,00025.846.1
Break and enter135.5172.8
Theft from vehicles232.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.