Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 132 Dundas St W
132 Dundas St W is on a 7.5 m by 30.5 m lot on Dundas St W in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2244), changes some of the usual rules for this address. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.
The City has 16 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2012, a building permit was filed: "Proposal for hvac units to 8 residential units (35, 36, 37, 38, 39, 40, 41, and 42) in existing mixed-use building. also related to address 134 dundas street…". Status: closed. In 2011, a building permit was filed: "Proposal for interior alterations to ground floor retail space to convert to bubble tea restaurant (< 30 seats). proposal includes plumbing and minor hvac…". Status: closed. In 2004, a building permit was filed: "Install kitchen exhaust in existing restaurant (by the slice)". Status: closed. Nothing on file is open right now.
Within 300 m, 16 development applications are open (the tallest up to 85 storeys). St Patrick station is a 4-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: listedModerate
- Site-specific exception 900.11.10(2244)Moderate
- 16 development applications open within 300 mLowFree check
- Priority retail street: Dundas Street WestLow
- Downtown Plan Secondary PlanLow
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
16 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2013-06-06 | Zoning review13 182925 LTO | No description on file | Closed | |
| 2012-06-20 | Building permit12 194779 | Proposal for HVAC units to 8 residential units (35, 36, 37, 38, 39, 40, 41, and 42) in existing mixed-use building. Also related to address 134 Dundas Street West. See file 03-176946 WNP. | Closed | |
| 2011-07-22 | Building permit11 223255 | Proposal for interior alterations to ground floor retail space to convert to bubble tea restaurant (< 30 seats). Proposal includes plumbing and minor HVAC alterations. | Closed | |
| 2004-04-01 | Building permit04 120407 | Install kitchen exhaust in existing restaurant (By the Slice). | Closed | |
| 2004-03-30 | Zoning review04 120879 ZSV | No description on file | Cancelled | |
| 2003-10-03 | Zoning review03 183080 ZPR | No description on file | Closed | |
| 2003-07-24 | Building permit03 159830 | add 6 residential dwelling units @ roof level (146 Dundas St. W. is a convenience address for 132 Dundas St. W.) (APPLICANT TO SUBMIT 3rd FULL SET OF PLANS ASAP) (extra set of plans submitted on july 25th, 2003) | Cancelled | |
| 2003-07-08 | Zoning review03 153499 LTO | No description on file | Closed | |
| 2003-06-19 | Zoning review03 146995 LTO | No description on file | Closed | |
| 2003-06-06 | Building permit03 115880 | Alter BP 03 115880 by making interior alterations. Tenant: Quizno's Sub | Closed | |
| 2003-04-23 | Zoning review03 125673 LTO | No description on file | Closed | |
| 2003-03-12 | Building permit03 112991 | make interior alters by erecting partition on 1st floor for new retail store use. (also includes 144 dundas st.w.) tenant: international news store | Closed | |
| 2003-02-12 | Consent (lot split)B0004/03TEY | This application also includes Nos. 134 to 148 Dundas Street West. The applicant is seeking the consent of the Committee of Adjustment to sever the subject property and building into six parcels. The severed parcels are identified as Parcel 1 (being Parts 1,2 and 3), Parcel 2 (being Parts 5, 6 and 7), Parcel 3) being Parts 8, 9 and 10), Parcel 4 (being Parts 11, 12 and 13), Parcel 5 (being Parts 14, 15 and 16) and Parcel 6 (being Parts 17, 18 and 19). Consent of the Committee is requested for the appropriate easements for shared access purposes, including internal corridor and fire escape, and below grade access to mechanical and electrical equipment services, over Parts 3, 5, 10, 11, 16 and 17. Also, consent of the Committee is requested for an easement over the existing right-of-way and related facilities, in order that it be shared and continue to be maintained in favor of the six parcels being created. This right-of-way provides access to a rear lane to Elizabeth Street and is identified as Parts 2, 7, 9, 13, 15, 19 and 20. This right-of-way is used for rear access (secondary fire escape) purposes. All as shown on a plan at the Office of the Committee of Adjustment. | Approved | |
| 2003-02-12 | Minor varianceA0019/03TEY | This application includes Nos. 13 to 148 Dundas Street West. Construct a fourth floor addition over the existing row of six attached mixed use building, in order to increase the number of dwelling units therein from 24 to 33. The addition will create an additional floor area of 568 square metres to the building. | Approved | |
| 2003-01-14 | Building permit02 193388 | remove fire escape on west side of building and make interior alterations to 2nd floor , suites 204 & 201, and & 3rd floor, suites 304 & 301, for 2nd means of egress; plus store front window replacement for # 132 to #144 Dundas St. W. | Closed - Dormant | |
| 2002-08-02 | Building permit02 148674 | Interior alterations and create 2 new windows and 2 new doors for a restuarant. Hold for Survey Approval. survey approved | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: listed
- Site-specific exception 900.11.10(2244)
- Priority retail street: Dundas Street West
What this part means for this house, in plain EnglishUnlock
Heritage property: listed
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(2244)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Dundas Street West
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2244)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c2.0; r4.0) SS1 (x2244)
- Height limit
- 30 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 185 m²
- Back yard
- 2.6 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 16 development applications open within 300 m, up to 85 storeys
- In the College station area
- 2 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
16 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Assault: 5.3 times the Toronto median
- Theft over $5,000: 4.6 times the Toronto median
- Robbery: 4.3 times the Toronto median
- Break and enter: 3.2 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Bay Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St Patrick StationNearest station4 min walk
- Dundas St West at Bay StNearest TTC stop1 min walk
- Bay StNearest cycling route1 min walk
- Toronto Metropolitan University - Entr To Business School LobbySchool3 min walk
- Tmu - Heaslip HouseSchool7 min walk
- Toronto Metropolitan University - School of Image ArtsSchool8 min walk
- OCAD University - the Learning ZoneSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.33361.1
- Robberycity median 69.5300.1
- Homicidecity median 5.312
- Shootingscity median 10.512
- Auto theftcity median 192.6162.1
- Theft over $5,000city median 46.1210.1
- Break and entercity median 172.8552.2
- Theft from vehiclescity median 188.1402.1
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist