HousePrecheckCheck an address

1303 Yonge StToronto · zoning, lot size and permit records

Also 1299 Yonge St, 1311 Yonge St

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2536)37.0 × 76.7 m2,572 m²on Jackes Avecorner, also on Yonge St

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 22 133669 STE 11 SA (Site plan approval to facilitate the redevelopment of the site for an 11-storey mixed-u..., 2022); 22 133670 STE 11 OZ (A revised Official Plan and Zoning By-law Amendment application to permit a mixed-use d..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 18 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: SummerhillThe City plans more homes around the station: good for transit, and more building over time.
N20 m
37.0 m frontage76.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2001

    Needs a closer look

    Still open in the City's records: 04 178520 (Interior alteration to existing office space, 2004, status Inspection); 01 105411 (Make interior alterations on portion of 1st floor - North, existing office, 2001, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 133669 STE 11 SA (Site plan approval to facilitate the redevelopment of the site for an 11-storey mixed-u..., 2022); 22 133670 STE 11 OZ (A revised Official Plan and Zoning By-law Amendment application to permit a mixed-use d..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 18 development applications open within 300 m

    Good to know

    18 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

21 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review22 133669 PSPClosed
    Apr 25, 2022 · 1303 YONGE ST
  • Zoning review22 133670 POZClosed
    Apr 25, 2022 · 1303 YONGE ST
  • Development application22 133669 STE 11 SAUnder Review

    Site plan approval to facilitate the redevelopment of the site for an 11-storey mixed-use building having a non-residential gross floor area of 4105.30 square metres, and a residential gross floor area of 15,949.90 square metres. 102 residential dwelling units are proposed.

    Apr 12, 2022 · 1303 YONGE ST · City file
  • Development application22 133670 STE 11 OZCouncil Approved

    A revised Official Plan and Zoning By-law Amendment application to permit a mixed-use development consisting of a 43-storey and 47-storey building (142 and 151 metres respectively) with a total of 832 residential units, and 1,283 square metres of non-residential floor space. The proposal includes an on-site parkland dedication.

    Apr 12, 2022 · 1311 YONGE ST · City file
  • Building permit21 232391Closed

    Revision to floor 01Proposal for interior alterations to office building floor 2

    Nov 23, 2021 · 1303 YONGE ST
  • Building permit18 268286Closed

    Proposal for interior alterations to the 1st floor of existing office "Cineplex"

    Dec 17, 2018 · 1303 YONGE ST
  • Building permit17 232517Closed

    Proposed 2 electromagnetic locks in 3rd floor "Cinplex Inc."

    Oct 11, 2017 · 1303 YONGE ST
  • Building permit17 124463Closed

    Proposal for interior alterations to 3rd floor, "Cineplex"

    Mar 20, 2017 · 1303 YONGE ST
Show 13 older records
  • Building permit12 228915Closed

    Proposal for interior alterations to ground floor unit (#311) to renovate existing cafeteria/diner.Occupant load- 50 persons

    Oct 18, 2012 · 1303 YONGE ST
  • Building permit10 275812Closed

    permit for 4 maglocks, 2 maglocks floor 2, 2 maglocks floor 3. existing office space - Cineplex.

    Nov 5, 2010 · 1303 YONGE ST
  • Building permit08 112912Closed

    Make interior alterations to 2nd & 3rd floor.

    Feb 26, 2008 · 1303 YONGE ST
  • Zoning review06 118415 LTOClosed
    Mar 20, 2006 · 1303 YONGE ST
  • Building permit05 123666Closed

    Interior alterations to portion of ground floor

    Apr 26, 2005 · 1303 YONGE ST
  • Zoning review04 183509 ZPRClosed
    Oct 21, 2004 · 1303 YONGE ST
  • Zoning review04 183503 ZSVClosed
    Oct 21, 2004 · 1303 YONGE ST
  • Building permit04 178520Inspection

    Interior alteration to existing office space.

    Oct 13, 2004 · 1303 YONGE ST
  • Zoning review03 184216 ZPRCancelled
    Oct 8, 2003 · 1303 YONGE ST
  • Building permit01 105416Closed

    Install Plumbing Fixtures: 1 KS on 1st floor office - North. Cost incl: 01-105411. PICKED UP ON FEB.19/01

    Feb 19, 2001 · 1303 YONGE ST
  • Building permit01 105411Inspection

    Make interior alterations on portion of 1st floor - North, existing office

    Feb 16, 2001 · 1303 YONGE ST
  • Zoning review87 029935 LTOClosed
    Mar 18, 1987 · 1303 YONGE ST
  • Zoning review86 028113 LTOClosed
    May 15, 1986 · 1303 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2536)

    Needs a closer look

    2 site-specific rules and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2536)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum building setback from a lot line abutting Yonge St. is 3.0 metres

  2. Rule B

    These premises must comply with Exception 900 11.10(2).

  3. Older by-law A

    Section 12(2) 260 of former City of Toronto By-law 438-86

  4. Older by-law B

    Section 12(2) 262 of former City of Toronto By-law 438-86

  5. Older by-law C

    Section 12(2) 265 of former City of Toronto By-law 438-86

  6. Older by-law D

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

  7. Older by-law E

    Section 12(2) 324 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
2,572 m²
Frontage
37 m
Depth
76.7 m
Street
Jackes Ave
Corner lot
Yes, also on Yonge St76.7 m along it
Public lane
None
House footprint
2,128 m²roof up to 20.8 m
Back yard
7.2 mhouse to rear lot line
Side yards
0.4 m and 4 mhouse to side lot lines
Buildings on the lot
4house, garage, sheds
Max height
16 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Summerhill. The lot is inside the Summerhill Major Transit Station Area approved by the Province (Site and Area Specific Policy 720). Source
  • Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 3.0 (c2.0; r2.5) SS2 (x2536) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 13 City trees in front of this lot. The City's street tree inventory lists 13 trees at this address: maple, norway crimson king (40 cm), maple, norway (35 cm), honey locust (30 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
90%38 of 42 decisions
Garden suite permits
0
Laneway suite permits
3
Multiplex permits
1
Development applications
25

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 42 variance decisions: more than at 77% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit an eating establishment use (restaurant) that is occupying the ground floor area of the existing three-storey mixed-use building. The existing two residential dwelling units (occupying the second and third levels) will be maintained and unaltered.

    1262 YONGE ST · Jun 3, 2026 · 147 m away
  • Minor varianceApproved

    To alter the development standards, as approved under Site Specific Zoning By-law 267-2021 (LPAT), for the 23-storey mixed-use building (currently under construction) by constructing a one-storey addition (enclosed solarium / patio) for the use of the eating establishment (restaurant), by increasing the total gross floor area, the horizontal patio projection, and building heights (the enclosed solarium/patio will have a height of 4.6 m). Also to reduce the north building setback from 5.9 m to 4.35 m, the south building separation distance from 5.5 m to 2.58 m, and to alter the location of the ground level vertical clearance area as depicted on Diagram 6. There will be a total of 127 residential dwelling units on this lot.

    5 SCRIVENER SQ · Apr 15, 2026 · 495 m away
  • Minor varianceApproved

    To permit a commercial school use (fitness studio occupying Units 106 and 109) on the first storey of the existing 21-storey non-residential building.

    2 ST CLAIR AVE W · Jan 28, 2026 · 432 m away
  • Minor varianceApproved

    To redescribe the lands as a result of the conveyance of the rear portion of the lot for parkland dedication.

    30 ST CLAIR AVE W · Oct 29, 2025 · 447 m away
  • Minor varianceApproved

    To redescribe the lands as a result of the conveyance of the rear portion of the lot for parkland dedication.

    40 ST CLAIR AVE W · Oct 29, 2025 · 469 m away

Latest activity nearby

  • Building permit

    Remove and replace 1 Chiller, 1 Cooling Tower, 1 Condenser Pump, 2 Building Pumps, VFDs

    1 BALMORAL AVE · Nov 17, 2026 · 126 m away
  • Building permit

    Proposal for localized concrete repairs and replacing the guards at the northwest exterior garage stairwell.

    44 JACKES AVE · Nov 4, 2026 · 149 m away
  • Zoning review

    Closed

    67 SUMMERHILL AVE · Oct 27, 2026 · 282 m away
  • Zoning review

    Notice Sent

    1226 YONGE ST · Oct 20, 2026 · 270 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a front covered porch with stairs.

    67 SUMMERHILL AVE · Sep 23, 2026 · 282 m away
  • Building permit

    Proposal for standalone shoring for soil remediation

    29 PLEASANT BLVD · Sep 10, 2026 · 278 m away
  • Building permit

    Drain - Proposed interior alterations including 2-piece washroom at basement level

    10 WALKER AVE · Aug 18, 2026 · 208 m away
  • Building permit

    Proposal to repair detiorated roof framing at rear of home, joist replacements on second and main floor.

    5 BALMORAL AVE · Aug 17, 2026 · 149 m away
  • Building permit

    To erect and display one non illuminated static copy wall sign.***25 ROSEHILL***

    44 JACKES AVE · Aug 7, 2026 · 149 m away
  • Building permit

    REV 01: REVISION TO GROUND FLOOR & BASEMENT LAYOUT FOR GROUP A-2 EATING ESTABLISHMENT (75 INDOOR SEATS). INCL. REVISED STRUCTURAL, ELECTRICAL LIFE SAFETY & SPRINKLER DRAWINGS. NOTE: PERMIT REVISION FOLLOWS COA APPROVAL OF MV FOR INCREASED RESTAURANT AREAGround floor change of use to group E eating establishment (w/ less than 30 seats).

    1262 YONGE ST · Aug 7, 2026 · 147 m away

Neighbourhood: Rosedale-Moore Park

About the area around the lot, not the lot itself.

Nearest station
Summerhill Station5 min walk
Nearest TTC stop
Yonge St at Woodlawn Ave West1 min walk
Nearest cycling route
Yonge StCycle Track, 1 min walk
Nearest traffic count
8,703 vehicles in 8 hYonge St / Farnham Ave / Jackes Ave, 50 m away, Jun 21, 2023
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 2 with cyclists
Parks
54 Jackes Ave Park2 min walk
David A. Balfour Park3 min walk
Pricefield Road Playground7 min walk

Schools within 1 km

  • THE YORK SCHOOL - MDL AND SR CAMPUS Private 1 min walk
  • THE LINDEN SCHOOL Private 3 min walk
  • DEER PARK JR & SR PUBLIC SCHOOL English Public 9 min walk
  • DE LASALLE COLLEGE SCHOOL Private 9 min walk
  • COTTINGHAM JR PUBLIC SCHOOL English Public 9 min walk
  • BROWN JR PUBLIC SCHOOL English Public 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRosedale-Moore ParkMedian neighbourhood
Median household income (2020)$122,000$84,500
Households that own their home58%54%
Population (2021)20,08016,813
Homes built in 1960 or before46%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRosedale-Moore ParkCity median
Assault1080.4636.3
Robbery86.869.5
Auto theft199.6192.6
Theft over $5,00065.146.1
Break and enter455.6172.8
Theft from vehicles182.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.