Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
1 by-law investigation closed in the last two years
Good to knowClosed files (Property Standards): 25 126349 PRS 00 IR (Property Standards, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations13 development applications open within 300 m
Good to know13 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 61 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
8 records on file: more than at 98% of Toronto houses (median 0).
- By-law investigation26 198645 WST 00 IRClosed
Waste
Jul 8, 2026 · 130 QUEEN ST E - By-law investigation26 187286 LGW 00 IRClosed
Long Grass and Weeds
Jun 18, 2026 · 130 QUEEN ST E - By-law investigation26 113905 WST 00 IRClosed
Waste
Feb 5, 2026 · 130 QUEEN ST E - By-law investigation25 174613 LGW 00 IRClosed
Long Grass and Weeds
Jun 10, 2025 · 130 QUEEN ST E - By-law investigation25 144897 ELS 00 IRClosed
Election Signs
Apr 15, 2025 · 130 QUEEN ST E - By-law investigation25 126350 WST 00 IRClosed
Waste
Mar 7, 2025 · 130 QUEEN ST E - By-law investigation25 126349 PRS 00 IRClosed
Property Standards
Mar 7, 2025 · 130 QUEEN ST E - Building permit07 268114Closed
install two certified tents. 1) 20'0" x 20'0"- certification #06/126868, 2) 10'0" x 15'0"-certification #06/126835
Oct 12, 2007 · 130 QUEEN ST E
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 16,246 m²
- Frontage
- 97.5 m
- Depth
- 172 m
- Street
- Queen St E
- Corner lot
- Yes, also on George St172 m along it
- Public lane
- None
- House footprint
- 5,208 m²roof up to 29.4 m
- Back yard
- 46 mhouse to rear lot line
- Side yards
- 18.9 m and 21.2 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: honey locust (40 cm), honey locust (26 cm), honey locust (25 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%26 of 26 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 14
- Development applications
- 38
Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 26 variance decisions: more than at 58% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 356 m away - Minor varianceApproved
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition with a basement to expand commercial units and to provide a new internal connection on the ground floor between the main building and the rear ancillary building on the lot, abutting the laneway. Also, to construct a new rooftop deck above the one-storey addition with access via staircases to the rear laneway, rear second level, and third storey with a balcony. Further, to convert the existing three-storey mixed-use building and rear two-storey ancillary building into a commercial development. The commercial units will remain within the basement and ground floor of the main building. A total of two residential dwelling units will be removed.
244 QUEEN ST E · Mar 11, 2026 · 355 m away - Minor varianceApproved
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
30 BOND ST · Jan 21, 2026 · 407 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 90 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 198 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 266 m away - Building permit
1 wall sign**PHARMASAVE**
213 A QUEEN ST E · Nov 23, 2026 · 194 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 223 m away - Building permit
1 wall sign**PHARMASAVE**
215 QUEEN ST E · Nov 12, 2026 · 208 m away - Zoning review
Not Started
100 LOMBARD ST · Nov 6, 2026 · 253 m away - Zoning review
Closed
78 MUTUAL ST · Oct 28, 2026 · 263 m away - Building permit
1 wall sign**PHARMASAVE**
215 QUEEN ST E · Oct 26, 2026 · 208 m away - Building permit
INTERIOR ALTERATIONS WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL WORK TO SUIT NEW LAYOUT
111 QUEEN ST E · Oct 26, 2026 · 201 m away - Zoning review
Not Started
207 JARVIS ST · Oct 21, 2026 · 159 m away - Building permit
Rev 01 - Reducing 200 mm backflow preventor and express main to 150 mmProposal for replacement of existing electric fire pump and associated piping in fire pump room
25 MUTUAL ST · Oct 19, 2026 · 129 m away
Neighbourhood: Moss Park
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station9 min walk
- Nearest TTC stop
- Queen St East at Jarvis St1 min walk
- Nearest cycling route
- Shuter StCycle Track, 2 min walk
- Nearest traffic count
- 5,481 vehicles in 8 hQueen St E / George St / Moss Park Trl, 90 m away, Oct 18, 2022
- Serious collisions within 500 m
- 222021–2026, killed or seriously injured: 3 fatal, 16 with pedestrians, 0 with cyclists
- Parks
- Moss Park1 min walk
- 45 Dalhousie St Park3 min walk
- Arena Gardens4 min walk
Schools within 1 km
- ECOLE ELEMENTAIRE GABRIELLE ROY French Public 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 7 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 7 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Moss Park | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $65,000 | $84,500 |
| Households that own their home | 35% | 54% |
| Population (2021) | 21,490 | 16,813 |
| Homes built in 1960 or before | 17% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Moss Park | City median |
|---|---|---|
| Assault | 2226.8 | 636.3 |
| Robbery | 166.6 | 69.5 |
| Homicide | 3.4 | 5.3 |
| Shootings | 3.4 | 10.5 |
| Auto theft | 81.6 | 192.6 |
| Theft over $5,000 | 64.6 | 46.1 |
| Break and enter | 350.2 | 172.8 |
| Theft from vehicles | 275.4 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.