HousePrecheckCheck an address

129 Bremner BlvdToronto · zoning, lot size and permit records

Also 131 Bremner Blvd, 133 Bremner Blvd, 135 Bremner Blvd, 137 Bremner Blvd

≈ 20.4 × 40.4 m652 m²on Lower Simcoe Stcorner, also on Bremner Blvd

Not a single house

Several homes on one parcel

5 different civic addresses share this parcel: a townhouse row, a co-op or a complex of homes rather than one house. Build options for a house do not apply to one home here, and the City's records for the parcel may be about any of them.

Looking at a house nearby? What this means for you

  • 5 homes on one parcel of 0.1 haA denser block than the houses around it: more cars and people, often with shared driveways and parking.
  • Permits or applications open on this parcelRecent records on this lot: 26 185545 (2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 59 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.

Want to check a home here before you buy?

We are building checks for homes in complexes and co-ops. Leave your email and we will tell you when it is ready.

N10 m
≈ 20.4 m frontage≈ 40.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit26 185545Application Received
    Jun 16, 2026 · 135 BREMNER BLVD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
652 m²
Frontage
20.4 mestimated, irregular lot
Depth
40.4 mestimated, irregular lot
Street
Lower Simcoe St
Corner lot
Yes, also on Bremner Blvd40.4 m along it
Public lane
None
House footprint
469 m²
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: honey locust (10 cm), pear (8 cm), elm (8 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%7 of 7 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
5

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building (with four levels of below-grade parking, and a total of 974 dwelling units, of which 78 units are affordable rental units), by reducing the minimum number of residential visitor parking spaces and long-term bicycle parking spaces.

    200 QUEENS QUAY W · Nov 12, 2025 · 242 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1027-2014) for the 54-storey office building by enclosing the existing ground floor outdoor patio for a new ground floor eating establishment.

    156 FRONT ST W · Mar 19, 2025 · 326 m away
  • Minor varianceApproved

    To alter the existing 25-storey building (Unit 108/108A and Unit 109) by permitting a side (north) ground level patio and associated structures (tables and planters) within the colonnade.

    20 BAY ST · Jan 15, 2025 · 467 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1012-2022), for a new 59-storey mixed-use building, by reducing the minimum number of residential dwelling units that shall contain two or more bedrooms.

    200 QUEENS QUAY W · Dec 6, 2023 · 242 m away
  • Minor varianceApproved

    To permit the permanent operation of an outdoor patio (including the canopy) on the ground floor of the existing 54-storey mixed-use building.

    15 YORK ST · Dec 6, 2023 · 207 m away

Latest activity nearby

  • Building permit

    PROPOSED INTERIOR ALTERATION TO EXISTING OFFICE UNIT FOR INSURANCE OFFICE FITOUT - 11TH FLOOR

    25 YORK ST · Nov 24, 2026 · 220 m away
  • Building permit

    Proposal to construct a canopy at ground floor Galleria Entrance.

    25 YORK ST · Nov 24, 2026 · 220 m away
  • Building permit

    Rev 01: Revision to permitProposal to alter existing fire protection sprinkler system for new interior fit up on level 24 & 28 of an existing building.

    120 BREMNER BLVD · Nov 23, 2026 · 65 m away
  • Building permit

    REV03: Addition of new partition and door to enclose Cafe / Lunch Room area on east side of floor plan. REV02: Proposed revision of office layout scope of work as shown on submitted drawings. Interior Alterations: Extensive Renovation, demolition of all existing interior buildout, construction of new full floor office layout.Rev 01 - Office layout revisions throughout scope of work as shown on submitted drawingsProposal for interior alterations to existing office space on the 8th floor - Healthcare of Ontario Pension Plan

    1 YORK ST · Nov 23, 2026 · 259 m away
  • Building permit

    Proposed Interior alterations and partial change of use to convert a portion of existing office space into a coffee bar.

    18 YORK ST · Nov 18, 2026 · 141 m away
  • Building permit

    Proposal for interior alteration

    123 FRONT ST W · Nov 18, 2026 · 291 m away
  • Building permit

    REV 01: Permit amendment to include the addition of a clean-agent fire suppression system within the communications/server room, along with associated HVAC modificationsProposed interior alteration to include built-out spaces (meeting rooms, focus rooms, copy room, storage), open office space, and a flexible space (arrival, multi-purpose room/townhall), which will have operable partitions. The build-out will also include the construction of a new café, servery and sick/wellness room (new plumbing), and a new LAN room.

    16 YORK ST · Nov 6, 2026 · 144 m away
  • Building permit

    REV 01: Revision to permit to update exit stair configurationProposal for removal of three later exterior walls and installation of new curtain wall systems to match and align with adjacent existing curtain wall assemblies.

    255 BREMNER BLVD · Nov 2, 2026 · 169 m away
  • Building permit

    Proposal for interior alterations to renovate office space at Unit 310.

    123 FRONT ST W · Oct 23, 2026 · 291 m away
  • Building permit

    Installation of one (1) double door maglock on floor 11 elevator lobby entrance.

    16 YORK ST · Oct 23, 2026 · 144 m away

Neighbourhood: Harbourfront-CityPlace

About the area around the lot, not the lot itself.

Nearest station
Union Station8 min walk
Nearest TTC stop
Queens Quay West at Harbourfront Centre5 min walk
Nearest cycling route
Lower Simcoe StCycle Track, 1 min walk
Nearest traffic count
13,630 vehicles in 14 hBremner Blvd / Lower Simcoe St / Olympic Park Trl, 50 m away, Jul 7, 2026
Serious collisions within 500 m
122021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 2 with cyclists
Parks
Roundhouse Park1 min walk
Olympic Park1 min walk
Love Park5 min walk

Schools within 1 km

  • JEAN LUMB PUBLIC SCHOOL English Public 15 min walk
  • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHarbourfront-CityPlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home40%54%
Population (2021)28,13516,813
Homes built in 1960 or before0%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHarbourfront-CityPlaceCity median
Assault883.3636.3
Robbery48.169.5
Homicide2.85.3
Shootings8.510.5
Auto theft56.6192.6
Theft over $5,00056.646.1
Break and enter141.6172.8
Theft from vehicles121.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.