HousePrecheckCheck an address

1260 Markham RdToronto · zoning, lot size and permit records

≈ 159.5 × 231.0 m20,909 m²on Markham Rd

Not a home

Trca Land

The City of Toronto's real estate inventory lists Trca Land here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 23 227285 ESC 24 SA (Amendment to Site Plan Control Application No. 15 204840 ESC 38 SA, 2023). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 17 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
N50 m
≈ 159.5 m frontage≈ 231.0 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (99% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (97% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 23 227285 ESC 24 SA (Amendment to Site Plan Control Application No. 15 204840 ESC 38 SA, 2023).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 17 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Development application23 227285 ESC 24 SAUnder Review

    Amendment to Site Plan Control Application No. 15 204840 ESC 38 SA

    Nov 17, 2023 · 1250 MARKHAM RD · City file
  • Development application15 204823 ESC 38 OZClosed

    The proposal encompasses two proposed seniors 'life lease' residential buildings (Trinity Ravine Towers) on the north portion of the site, connected by a 4-storey podium. The easterly building fronting Markham Road, originally the first phase building proposed at 25-storeys, is now the Phase 2 building at 30-storeys with 287 units. The westerly building, originally the second phase building at 30-storeys, is now the Phase 1 building at 28-storeys with 278 units together with the connecting podium portion. The overall 448 units originally proposed is now increased to 565 units. Six units of commercial space comprising 552 sq.m. are proposed in the easterly building fronting Markham Road (originally 7 units comprising 633 sq.m.)

    Aug 11, 2015 · 1250 MARKHAM RD · City file
  • Development application15 204840 ESC 38 SAClosed

    Proposed development on the north portion of the site for two seniors 'life lease' residential buildings of 29 and 31 storeys containing a total of 565 residential units, with two levels of underground parking, amenity areas and 552 square metres of at-grade commercial/retail units and amenity areas. The buildings would be connected by a 4-storey podium. Also proposed on the south west portion of the site is a five level above ground parking structure to serve the existing place of worship for which 2,307 square metres of additions are also proposed. Note: Previous site plan application File No. 14 117859 ESC 38 SA for the proposed place of worship additions is now conslidated into this application.

    Aug 11, 2015 · 1250 MARKHAM RD
  • Development application10 109204 ESC 38 SAClosed

    The proposed development includes a recreational facility with a gymnasium and community access rooms addition to the existing 5155 square metre worship facility.

    Jan 25, 2010 · 1250 MARKHAM RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
20,909 m²
Frontage
159.5 mestimated, irregular lot
Depth
231 mestimated, irregular lot
Street
Markham Rd
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    50%1 of 2 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    3

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceRefused

      To alter the existing building to construct a mezzanine level at 2036 Ellesmere Road (Building D) and alter the use from industrial to recreational uses. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on October 8, 2025.

      2050 ELLESMERE RD · Dec 3, 2025 · 296 m away
    • Minor varianceRefused

      To construct a mixed-use development consisting of three residential towers having heights of 21, 27 and 30 storeys, containing 879 dwelling units in total.

      1221 MARKHAM RD · Dec 8, 2021 · 304 m away
    • Minor varianceApproved

      To permit interior alterations to a site plan approved (File No. 15 204840 ESC 38 SA), tall building, multi-residential project by increasing additional floor area and adding to the total maximum number of residential units.

      1250 MARKHAM RD · Oct 14, 2020 · 169 m away
    • Minor varianceApproved

      To permit the construction of a third storey addition to the northwest wing of the existing hotel to add 30 new suites (total 163 suites). Sixteen (16) new surface parking spaces will be added for a total of 157 spaces.

      50 ESTATE DR · Mar 5, 2020 · 363 m away
    • Minor varianceApproved

      This application is for a variance to permit an after school tutoring facility in the existing building at 2020 Ellesmere Road (Unit 2).

      2020 ELLESMERE RD · Jul 16, 2015 · 398 m away

    Latest activity nearby

    • Building permit

      Proposal for interior alterations for office unit finish in commercial area Unit 109.

      885 PROGRESS AVE · Sep 14, 2026 · 118 m away
    • Building permit

      1 Ground Sign*****12FIFTY*****

      1250 MARKHAM RD · Jun 26, 2026 · 169 m away
    • Building permit

      Stage SL 100 and tents will be erected for Toronto Fiesta Extravaganza on June 19th, 2026 and will be taken down on June 21st, 2026.

      1250 MARKHAM RD · Jun 17, 2026 · 169 m away
    • Building permit

      2 Ground Sign

      1280 MARKHAM RD · Jun 15, 2026 · 125 m away
    • Building permit

      Proposal for make-up air unit replacement

      50 TUXEDO CRT · Jun 3, 2026 · 276 m away
    • Zoning review

      Notice Sent

      1255 MARKHAM RD · May 19, 2026 · 201 m away
    • Development application

      Redevelopment of the lands consisting of, a 17-storey mixed use building containing apartment dwelling units intended for seniors, and a dedicated daycare/pre-school facility. The development will be phased. A 2-storey community centre/banquet hall, and, two new 39-storey residential buildings.The existing Place of Worship located at 920 Progress Avenue will be retained in situ, with a reconfigured access and pick-up/drop-off area.

      920 PROGRESS AVE · May 11, 2026 · 288 m away · City file
    • Building permit

      1 Ground Sign1 Wall Sign

      1250 MARKHAM RD · Apr 29, 2026 · 169 m away
    • Zoning review

      Closed

      1220 MARKHAM RD · Apr 7, 2026 · 231 m away
    • Zoning review

      Closed

      1280 MARKHAM RD · Mar 1, 2026 · 125 m away

    Neighbourhood: Woburn North

    About the area around the lot, not the lot itself.

    Nearest station
    McCowan Rt Station24 min walk
    Nearest TTC stop
    Progress Ave at Estate Dr East Side2 min walk
    Nearest cycling route
    Ellesmere RdMulti-Use Trail - Boulevard, 8 min walk
    Nearest traffic count
    12,046 vehicles in 8 hProgress Ave / Estate Dr (East), 170 m away, Mar 21, 2016
    Serious collisions within 500 m
    42021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
    Parks
    Trca Lands ( 77)2 min walk
    Morningside Park3 min walk
    Confederation Park8 min walk

    Schools within 1 km

    • TALENTA ACADEMY Private 6 min walk
    • Z3 EDUCATION CENTRE SCHOOL Private 7 min walk
    • WOBURN COLLEGIATE INSTITUTE English Public 9 min walk
    • WOBURN JR PUBLIC SCHOOL English Public 11 min walk
    • ADVANCED CHRISTIAN ACADEMY Private 13 min walk
    • ADVANCED CHRISTIAN ACADEMY (Renamed) Private 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureWoburn NorthMedian neighbourhood
    Median household income (2020)$74,500$84,500
    Households that own their home54%54%
    Population (2021)26,58016,813
    Homes built in 1960 or before23%29%
    Homes needing major repairs8%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleWoburn NorthCity median
    Assault768.9636.3
    Robbery76.569.5
    Shootings13.910.5
    Auto theft316.6192.6
    Theft over $5,00062.646.1
    Break and enter180.9172.8
    Theft from vehicles281.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.