HousePrecheckCheck an address

125 Mill StToronto · zoning, lot size and permit records

Also 131 Mill St, 145 Mill St, 151 Mill St, 181 Mill St, 405 Cherry St and 1 more

≈ 56.0 × 231.2 m10,446 m²on Rolling Mills Rdcorner, also on Mill St

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 15 storeys, 230 rental units, built 2022More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 6 development applications open within 300 m, up to 50 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • City upkeep score: 99 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N50 m
≈ 56.0 m frontage≈ 231.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 33 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Order Issued Property Standards, Property Standards, Zoning): 26 256358 PRS 00 IR (Property Standards, 2026); 26 201337 PRS 00 IR (Property Standards, 2026); 26 194621 HEA 00 IR (Adequate Heat, 2026); and 30 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 Committee of Adjustment files on this lot

    Good to know

    0 approved. A0886/08TEY (2008); SYS 2197011 (2008).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 6 development applications open within 300 m

    Good to know

    6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 99 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (15 storeys, 230 units, built 2022).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

50 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 256358 PRS 00 IRClosed

    Property Standards

    Oct 18, 2026 · 131 MILL ST
  • By-law investigation26 201337 PRS 00 IRClosed

    Property Standards

    Jul 14, 2026 · 131 MILL ST
  • By-law investigation26 194621 HEA 00 IRClosed

    Adequate Heat

    Jul 1, 2026 · 131 MILL ST
  • By-law investigation26 186030 PRS 00 IRClosed

    Property Standards

    Jun 17, 2026 · 131 MILL ST
  • By-law investigation26 186593 PRS 00 IVClosed

    Order Issued Property Standards: Communication system is not maintained in good repair and in operative condition.

    Jun 8, 2026 · 131 MILL ST
  • By-law investigation26 179968 PRS 00 IRClosed

    Property Standards

    Jun 8, 2026 · 131 MILL ST
  • By-law investigation26 168784 PRS 00 IRClosed

    Property Standards

    May 27, 2026 · 131 MILL ST
  • By-law investigation26 165046 PRS 00 IRClosed

    Property Standards

    May 22, 2026 · 131 MILL ST
Show 42 older records
  • By-law investigation26 122009 ZON 00 IRClosed

    Zoning

    Feb 26, 2026 · 131 MILL ST
  • By-law investigation26 115864 PRS 00 IRClosed

    Property Standards

    Feb 11, 2026 · 131 MILL ST
  • By-law investigation26 108928 PRS 00 IRClosed

    Property Standards

    Jan 25, 2026 · 131 MILL ST
  • By-law investigation26 108706 HEA 00 IRClosed

    Adequate Heat

    Jan 24, 2026 · 131 MILL ST
  • By-law investigation25 267110 HEA 00 IRClosed

    Adequate Heat

    Dec 16, 2025 · 131 MILL ST
  • By-law investigation25 265964 HEA 00 IRClosed

    Adequate Heat

    Dec 12, 2025 · 131 MILL ST
  • By-law investigation25 265510 PRS 00 IRClosed

    Property Standards

    Dec 11, 2025 · 131 MILL ST
  • By-law investigation25 263427 PRS 00 IRClosed

    Property Standards

    Dec 7, 2025 · 131 MILL ST
  • By-law investigation25 263315 HEA 00 IRClosed

    Adequate Heat

    Dec 6, 2025 · 131 MILL ST
  • By-law investigation25 260332 HEA 00 IRClosed

    Adequate Heat

    Nov 30, 2025 · 131 MILL ST
  • By-law investigation25 259006 HEA 00 IRClosed

    Adequate Heat

    Nov 26, 2025 · 131 MILL ST
  • By-law investigation25 258654 PRS 00 IRClosed

    Property Standards

    Nov 26, 2025 · 131 MILL ST
  • By-law investigation25 254503 PRS 00 IRClosed

    Property Standards

    Nov 16, 2025 · 131 MILL ST
  • By-law investigation25 254421 PRS 00 IRClosed

    Property Standards

    Nov 15, 2025 · 131 MILL ST
  • By-law investigation25 250002 HEA 00 IRClosed

    Adequate Heat

    Nov 6, 2025 · 131 MILL ST
  • By-law investigation25 249395 PRS 00 IRClosed

    Property Standards

    Nov 4, 2025 · 131 MILL ST
  • By-law investigation25 244870 HEA 00 IRClosed

    Adequate Heat

    Oct 25, 2025 · 131 MILL ST
  • By-law investigation25 242572 PRS 00 IRClosed

    Property Standards

    Oct 21, 2025 · 131 MILL ST
  • By-law investigation25 211780 SIN 00 IRClosed

    Signs

    Aug 18, 2025 · 131 MILL ST
  • By-law investigation25 207790 PRS 00 IRClosed

    Property Standards

    Aug 10, 2025 · 131 MILL ST
  • By-law investigation25 186370 PRS 00 IRClosed

    Property Standards

    Jul 1, 2025 · 131 MILL ST
  • By-law investigation25 174524 PRS 00 IRClosed

    Property Standards

    Jun 10, 2025 · 131 MILL ST
  • By-law investigation25 163314 ZON 00 IRClosed

    Zoning

    May 22, 2025 · 131 MILL ST
  • By-law investigation25 140457 PRS 00 IRClosed

    Property Standards

    Apr 7, 2025 · 131 MILL ST
  • By-law investigation25 135658 PRS 00 IRClosed

    Property Standards

    Mar 27, 2025 · 131 MILL ST
  • By-law investigation24 254207 PRS 00 IRClosed

    Property Standards

    Dec 28, 2024 · 131 MILL ST
  • Building permit23 218135Closed

    Revision 02 - Electrical revisions. Revision 01 - Change to the interior layout.NEW CAFE/BAKERY suite in NEW BUILDING

    Jun 26, 2024 · 125 MILL ST
  • Zoning review24 169120 LPRClosed
    Jun 24, 2024 · 125 MILL ST
  • Zoning review24 151757 LPRCancelled
    May 21, 2024 · 125 MILL ST
  • Zoning review23 201528 ZAPClosed
    Sep 13, 2023 · 125 MILL ST
  • Zoning review23 116993 ZZUClosed
    Feb 23, 2023 · 125 MILL ST
  • Zoning review20 222171 ZPRCancelled
    Nov 24, 2020 · 125 MILL ST
  • Zoning review18 251580 PSPClosed
    Aug 19, 2019 · 181 MILL ST
  • Development application18 251580 STE 28 SAClosed

    A Site Plan Control application to develop a new residential rental apartment building with three towers and 770 residential units on 181 Mill Street (Block 8) in the West Don Lands. The three towers are proposed at heights of 16, 16 and 26 storeys. The applicant, WDL 8 LP, was selected by Infrastructure Ontario to enter into a 99-year lease for this Block to develop rental housing and retail uses, with a minimum of 30% of the residential gross floor area being affordable units. A total of 231 of the proposed residential units will be affordable. Publicly accessible open spaces are situated between the three towers, as well as along the south side of the site. Vehicular parking for all three buildings will be accommodated below grade and a total of 185 parking spaces are proposed. A total of 766 bicycle parking spaces are proposed. Minor variances are proposed. The application is being processed through the City's Open Door Program. The project proposes to meet LEED Gold Certification and Toronto Green Standard Tier 1.

    Nov 2, 2018 · 131 MILL ST · City file
  • Development application11 253735 STE 28 PLClosed

    Part lot control exemption - West Don Lands - Phase 2 - to facilitate the future conveyance of the development blocks within Phase 2 into their individual ownership/development parcels. Refer to related Plan of Subdivision application for the creation of the 16 larger development blocks from which the individual parcels will be created.

    Aug 9, 2011 · 181 MILL ST
  • Minor varianceA0886/08TEYPending
    Oct 22, 2008 · 181 MILL ST
  • Minor varianceSYS 2197011Pending
    Aug 18, 2008 · 181 MILL ST
  • Zoning review08 179878 PSPClosed
    Jul 9, 2008 · 181 MILL ST
  • Development application08 176440 STE 28 SAClosed

    Site Plan Approval for new 4,600m2 district energy centre

    Jun 27, 2008 · 181 MILL ST
  • Zoning review08 142141 PRZClosed
    Apr 1, 2008 · 181 MILL ST
  • Development application08 141351 STE 28 OZClosed

    File Withdrawn.

    Mar 28, 2008 · 181 MILL ST
  • Zoning review87 029931 LTOClosed
    Mar 18, 1987 · 181 MILL ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
10,446 m²
Frontage
56 mestimated, irregular lot
Depth
231.2 mestimated, irregular lot
Street
Rolling Mills Rd
Corner lot
Yes, also on Mill St231.2 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%4 of 4 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    22

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      The existing one-storey and two-storey commercial buildings (retail and daycare) will be maintained and unaltered.

      4 GILEAD PL · Sep 9, 2026 · 488 m away
    • Minor varianceApproved

      The existing undersized public parking lot will be maintained and unaltered.

      4 GILEAD PL · Sep 9, 2026 · 488 m away
    • Minor varianceApproved

      To permit and construct a second storey rooftop outdoor patio to be used as a children's play area. The existing two-storey non-residential detached building is under renovation for a day nursery (child care facility) as approved by Building Permit #25 143317 BLD 00 BA.

      14 EASTERN AVE · May 6, 2026 · 416 m away
    • Minor varianceApproved

      To alter the existing two-storey townhouse dwelling by constructing a partial rooftop structure (pergola and wood deck above the existing flat roof dwelling), attached to the enclosed stair enclosure.

      29 SACKVILLE ST · Aug 14, 2024 · 450 m away
    • Minor varianceApproved

      To construct a phased mixed-use Indigenous Hub. The first phase will consist of a four-storey community health centre (Phase A). The second phase will consist of a four-storey training, education and employment centre and a mixed-use building featuring a 13-storey residential condominium tower with retail at grade, an 11-storey residential rental tower and an eight-storey residential podium. The existing three-storey heritage building will be maintained for non-residential uses (Phase B).

      425 CHERRY ST · Oct 21, 2020 · 161 m away

    Latest activity nearby

    • Building permit

      2 wall signs + 1 projecting sign**PUR & SIMPLE**

      373 FRONT ST E · Nov 19, 2026 · 271 m away
    • Zoning review

      Closed

      455 FRONT ST E · Oct 29, 2026 · 158 m away
    • Building permit

      2 wall signs + 1 projecting sign**PUR & SIMPLE**

      373 FRONT ST E · Oct 7, 2026 · 271 m away
    • Building permit

      PROPOSED SPRINKLERS WORK FOR PUR & SIMPLE RESTAURANT INTEROR FIT-UPSEE 26 186064

      373 FRONT ST E · Aug 7, 2026 · 271 m away
    • Building permit

      Proposed interior alterations and proposed outdoor patio, interior fit out for PUR & SIMPLE RESTAURANT

      373 FRONT ST E · Aug 4, 2026 · 271 m away
    • Zoning review

      Closed

      470 FRONT ST E · Jun 17, 2026 · 238 m away
    • Building permit

      1 Ground Sign*****CANARY LANDING WEST CHERRY HOUSE*****

      373 FRONT ST E · Jun 12, 2026 · 271 m away
    • Building permit

      REV: Proposed revision to address redeisgn of the noise wallConstruction of a noise wall barrier along the Metrolinx Railway corridor, south of Mill St, between Bayview Ave and Tannery Road.

      191 MILL ST · May 27, 2026 · 202 m away
    • Zoning review

      Closed

      425 CHERRY ST · May 8, 2026 · 161 m away
    • Building permit

      2 signs total = 1 wall sign + 1 projecting wall sign**MANDY'S**

      373 FRONT ST E · Mar 26, 2026 · 271 m away

    Neighbourhood: St Lawrence-East Bayfront-The Islands

    About the area around the lot, not the lot itself.

    Nearest station
    King Station29 min walk
    Nearest TTC stop
    Mill St at Cherry St West Side3 min walk
    Nearest cycling route
    Mill StBi-Directional Cycle Track, 1 min walk
    Nearest traffic count
    2,876 vehicles in 14 hCooperage St / Mill St, 50 m away, Jul 22, 2025
    Serious collisions within 500 m
    62021–2026, killed or seriously injured: 1 fatal, 0 with pedestrians, 1 with cyclists
    Parks
    Diamond Jubilee Promenade3 min walk
    Corktown Common4 min walk
    Lawren Harris Square6 min walk

    Schools within 1 km

    • GEORGE BROWN COLLEGE - YOUNG CENTRE FOR THE PERFORMING ARTS College 3 min walk
    • VOICE INTEGRATIVE PRIVATE SCHOOL Private 6 min walk
    • INGLENOOK COMMUNITY SCHOOL English Public 7 min walk
    • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk
    • MARKET LANE JR & SR PUBLIC SCHOOL English Public 12 min walk
    • LIBERTY PREP SCHOOL Private 14 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureSt Lawrence-East Bayfront-The IslandsMedian neighbourhood
    Median household income (2020)$87,000$84,500
    Households that own their home40%54%
    Population (2021)31,28516,813
    Homes built in 1960 or before3%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleSt Lawrence-East Bayfront-The IslandsCity median
    Assault1059.7636.3
    Robbery96.369.5
    Shootings4.510.5
    Auto theft24.6192.6
    Theft over $5,00078.446.1
    Break and enter163.5172.8
    Theft from vehicles163.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.